View
1.294
Download
2
Category
Tags:
Preview:
DESCRIPTION
A range of my work for many clients, in many fields, and many areas.
Citation preview
Phil Manker works with ArchitectsHe has the experience to build special elements that enhance buildings + interiors
1
Phil’s Areas of ExpertiseFURNITURE: Reception desks, workstations, conference tables, coffee tables + chairs
ART + SCULPTURE: Strong accent pieces for architectural environments
ARCHITECTURAL DETAILING: Lighting, sconces, friezes, panels, railings, screens, and faux finishes
EXHIBITS: Institutional history, museum, tradeshow + retail exhibits with dramatic impact
SIGNAGE: Logos, and environmental graphics, for corporate and healthcare
2
FurnitureReception desks, workstations, conference tables, coffee tables + chairs
3
Reception DesksR E C E P T I O N D E S K S M A K E A N I M P O R TA N T I N I T I A L S TAT E M E N T A B O U T T H E C O M P A N Y. T H E S I Z E A N D R A N G E O F M AT E R I A L S U S E D I N T H E M C A N S E T T H E T O N E F O R T H E E N T I R E I N T E R I O R .
4
PROJECT
DATE CLIENT2005 BOSTONART
RECEPTION DESKSTUNNING FORM+FUNCTIONALITY
4 WEEKS -BUILD+INSTALL 6,500- 22 DRYDOCK AVENUE, BOSTON
Patinated steel shapes support the sweeping arc of the desktop, with its bullnosed edges, corrugated steel privacy panel, and rosewood transaction shelf.
The sweeping curve of the worksurface allows multi-tasking.
5
WorkstationsW E L L - D E S I G N E D W O R K S TAT I O N S H A V E T H E B E S T E R G O N O M I C S A N D C O N N E C T I V I T Y T O P R O M O T E A S T R E S S - F R E E E N V I R O N M E N T.
6
PROJECT
DATE CLIENT2001 HGSE
COMPUTER WORKSTATIONSERGONOMIC DESIGN
8 WEEKS-BUILD+INSTALL 45,000- HARVARD UNIVERSITY, CAMBRIDGE, MA
Tops feature built-in internet and power supplies, bullnose edges. Cylindrical steel bases, with welded support arms, have quick-lock access panels.
Various top diameters fit the varying class sizes.
DESIGNED BY DOUGLAS DARYMPLE, T S A
7
PROJECT
DATE CLIENT2006 PRIVATE
LANDSCAPE + FLEXIBLE CONFIGURATION
2 WEEKS-BUILD 3,800-
Desk has a minimal superstrut steel frame, with inset lasercut patinaed inserts, and an assembled collection of fossil fish, trilobites birds, ammonites, and others. Features include minimal drawers on accuride tracks, rotating pull-out CPU carrier, leveling feet, concealed power strips, etc.
DESIGNED BY PHIL MANKER
STEEL DESK
8
Conference TablesL A R G E R TA B L E S T H AT S E AT 1 0 O R M O R E , A N D C A N B E T H E S TA R T I N G P O I N T F O R M A N Y G R E AT I D E A S !
9
PROJECT
DATE CLIENT2002 NONE
MATRIX GRID TABLETIMELESS MATERIALS
10WEEKS-BUILD+INSTALL 10,500- AVAILABLE TO PURCHASE
Beautiful, timeless materials, and ordering reality with a perfect grid, inspired this piece. 44 cut glass prisms, casting rainbows, separate the grid from the Azurlite blue glass top. Features include red-violet anodized aluminum screws, honed black lace slate from Norway, legs with curly sycamore veneers, and a series of playful constructions in silver and yellow-enameled perforated steel.
10
PROJECT
DATE CLIENT1998 PARTNERS+SIMONS
DRIFTWOOD TABLEOPEN STRUCTURE
10WEEKS-BUILD+INSTALL 9,000- 25 DRYDOCK AVE, BOSTON, MA
A galvanized box truss frame has driftwood elements inserted in its many rings. Patinaed copper ball finials accent the corners. Legs are made up from many staggered layers of avonite.
11
PROJECT
DATE CLIENT1996 PARTNERS+SIMONS
PRISM TABLEAMAZING RANGE OF MATERIALS
10WEEKS-BUILD+INSTALL 10,500- 25 DRYDOCK AVE, BOSTON, MA
Deco wrought iron rail sections, custom cast acylic prisms, copper finials, anodized aluminum cone, prismatic stainless steel feet, and many other interesting details make this table, which seats six, a genuine conversation piece!
12
PROJECT
DATE CLIENT1997 PARTNERS+SIMONS
BEAM TABLEBOLD STRUCTURE
5 WEEKS-BUILD+INSTALL 6,000- 25 DRYDOCK AVE, BOSTON, MA
Southern yellow pine beams are cut and sandblasted, then bolted to heavy steel base plates to create strong geometries. Top is Azurlite blue-tinted glass.
13
PROJECT
DATE CLIENT1995 DUFFY DESIGN GRP
DUFFY CONE TABLERADIAL SYMMETRY
6 WEEKS-BUILD+SHIP 6,500- 530 HARRISON AVE, BOSTON
Solid maple triangulated fins connect the spun aluminum legs to the center ring and bottom disc, weighted with a steel cone. The circular glass top, with bullnose edge, sits on bronze spheres.
14
Game Tables
S P E C I A L TA B L E S D E S I G N E D F O R P L AY.
15
PROJECT
DATE CLIENT1987 NONE
BACKGAMMON TABLESCULPTED ACRYLIC
14 WEEKS-BUILD 5,500- AVAILABLE TO PURCHASE
A sculpted acrylic frame holds a sumptuous needle-pointed backgammon board, with an illusionary dropped shadow, under glass. Built-in game-piece tray. Drink holders at corners have radially perforated blue acrylic drip trays.
16
PROJECT
DATE CLIENT1985 PRIVATE
THE GAME CUBEFUN SIX WAYS
6 WEEKS-BUILD 4,000- MANHATTAN
The clear acrylic cube can be rotated to play six different games. Game pieces are held in clear boxes in internal trays with snap-in doors. A lift-off top tray gives extra room for the game being played. The board designs are after Escher.
17
Coffee + Side Tables
A C C E N T TA B L E S T H AT C A N B E T H E F O C A L P O I N T O F A R O O M .
18
PROJECT
DATE CLIENT1999 PRIVATE
VAIL PEDIMENT TABLEARCHITECTURAL FACADE REBORN
5 WEEKS -BUILD 5,200- VAIL, COLORADO
Three concrete door pediments, and smoked acrylic shadow elements, are connected with copper bars. Polished ball bearings on onyx blocks carry a curved smoked glass top. Table was designed to fit in front of a custom curved sofa in a ski house at Vail, Colorado.
19
PROJECT
DATE CLIENT1990 PRIVATE
PRISM TABLEPRISMATIC/TRANSCENDENT FORMS
7 WEEKS -BUILD 4,900- LAKE FOREST, IL
Massive cast acrylic forms are prismatic and appear to transcend the surface planes of the top and the floor in this timeless piece.
20
PROJECT
DATE CLIENTS1985 PRIVATE
CLEARSPAN TABLEDEFINING CURVES
2 WEEKS -BUILD 1,200- LAKE FOREST, IL, PONTE VEDRA, FLA
This simple table has U-shaped/formed acrylic legs that bolt to the radiused glass top with machined stainless steel discs.
21
PROJECT
DATE CLIENT1982 PRIVATE
SEASHELL TABLEMAN IMPROVES UPON NATURE
4 WEEKS -BUILD 2,800- CHICAGO, IL
Stepped acrylic layers are cut in waves to mimic beach sand at low tide. A shell collection sits under a removeable glass top. Cylindrical legs are limestone.
22
PROJECT
DATE CLIENT2001 BOSTONART
DOG SIDE TABLESTRONG FORM
3 WEEKS -BUILD 1,100- 21 DRYDOCK AVENUE, BOSTON, MA
Stepped acrylic layers are cut in waves to mimic beach sand at low tide. A shell collection sits under a removeable glass top. Cylindrical legs are limestone.
23
Art + SculptureStrong accent pieces for corporate environments
24
Corporate ArtM A J O R P I E C E S F O R C O R P O R AT I O N S T H AT T E L L A S I M P L E S T O R Y A B O U T W H O T H E Y A R E A N D W H AT T H E Y D O .
25
PROJECT
DATE CLIENT1987 HONEYWELL
HONEYWELLLOBBY WALL PANEL
3 WEEKS-BUILD+INSTALL 14,000- CANTON, MA
Machined acrylic grids are edgelit with neon in this abstract composition
26
PROJECT
DATE CLIENT1988 NORTHROP CORP.
NORTHROPA PROUD AVIATION HISTORY
12 WEEKS-BUILD+INSTALL 54,000-CENTURY CITY, LOS ANGELES, CA
A 12-panel panorama depicts aircraft from the proud 75-year aviation history of Northrop, in their executive headquarters. A combination of materials and techniques includes stainless steel, photometal, airbrushing, and applied carborundum. Phil Manker worked with art consultant Wayne Andersen’s Vesti Corp, and Gensler.
27
PROJECT
DATE CLIENT1988 NORTHROP CORP.
NORTHROPELECTRONICS DIVISION
6 WEEKS-BUILD+INSTALL 21,000-CENTURY CITY, LOS ANGELES, CA
An interactive collage of Northrop’s array of electronics products and their applications. Interchangeable aluminum panel system.
28
PROJECT
DATE CLIENT1988 NORTHROP CORP.
NORTHROPTRIGRAPH MURAL
12 WEEKS-BUILD+INSTALL 62,000-CENTURY CITY, LOS ANGELES, CA
This mural combines 3 complete panoramas into one image panel by segmenting them behind a wall of clear acrylic rods. The dynamic refractive properties of the Trigraph make it appear to constantly change as the viewer moves around it, creating great visual drama! Designed with Wayne Andersen’s Vesti Corp.
29
PROJECT
DATE CLIENT1989 IBM
IBMEXECUTIVE CAFETERIA MURAL
10 WEEKS-BUILD+INSTALL 65,000- IBM WORLD HEADQUARTERS, MANHATTAN
Multimedia mural panels depict the evolutionary flow of plant and animal species through the geologic ages along a wall at IBM’s headquarters in Manhattan.
30
PROJECT
DATE CLIENT2000 TMP WORLDWIDE
monster.comSCULPTURES + MURALS
MANY PROJECTS 4,500-TO 75,000- MANHATTAN
The playful icons of this worldwide internet job-search company have been brought to life with a series of fully detailed sculptures, and panoramic murals, for their offices around the world.
31
PROJECT
DATE CLIENT1986 WELLS FARGO
WELLS FARGOHISTORICAL FINANCIAL IMAGERY
8 WEEKS-BUILD+INSTALL 40,000- SAN FRANSISCO, CA
A series of 20 brass panels, with macro silkscreened graphics depicting historical stock certificates
32
PROJECT
DATE CLIENT1996 CHEVRON PARK
CHEVRONDECORATIVE ANECHOIC PANELS
CALIFORNIA
Glowing macro plastic models of diatoms are assembled in high relief on fabric-covered honeycomb panels, carrying a seismic section image. Diatoms are used by geologists to date rock core samples in their search for oil
12 WEEKS-BUILD+INSTALL 41,000-
33
PROJECT
DATE CLIENT1984 AVEDIS ZILDJIAN & CO.
Zildjian3D MURAL
NORWELL, MA
Three dimensional mural figures are airbrushed on P95 frosted acrylic, cutout in silhouette, and formed to free stand in front of a cherrywood-framed macro lightbox wall. Founding fathers of this old-world enterprise.
10 WEEKS-BUILD+INSTALL 22,000-
34
Sculpture
P U R E F O R M S A S E X P R E S S I V E A C C E N T P I E C E S F O R A R C H I T E C T U R E
35
PROJECT
DATE CLIENT2004 HOWARD ELKUS
FREEDOM ISTEEL LOBBY SCULPTURE
12 WEEKS-BUILD+INSTALL 19,500- ELKUS/MANFREDI, BOSTON, MA
Welded, waterjet-cut CRPO steel over tubular steel frames. Inspired by the wharf’s along Boston’s waterfront. Installed in the Saltonstall Building lobby, Boston. Designed by Howard Elkus, principal, Elkus/Manfredi Architects.
36
PROJECT
DATE CLIENT2005 M H S
CYPRESS FORMS I+IISTEEL TREE SCULPTURES
4 WEEKS-BUILD+INSTALL 3,500- ELM BANK, WELLESLEY, MA
A steel sculpture with 600 formed plates welded to a central tube is inspired by the cypress trees of Italy.
And another form, after the strictly weeping fir. This sculpture is zinc galvanized.
37
PROJECT
DATE CLIENT2006 NONE
FOSSILSCAPECAST CONCRETE PANEL SERIES
1 WEEK-BUILD 600-
This cast concrete low relief panel is a created Paleozoic fossil landscape, with trilobites, brachiopods, anemones, fluorite crystals, and other flora and fauna of the period. This is one of a series. Applications may include wall or floor embedment.
38
PROJECT
DATE CLIENT2007 AVAILABLE
CUBE CONSTRUCTIONSTACKED BLOCKS-AFTER LEWITT
4 WEEKS-BUILD 3,200-
Inspired by the geometric basswood framework constructions of Sol Lewitt, this set of 280 solid concrete blocks can be stacked in any number of configurations. Blocks have icons cut into their faces. Plexiglass and steel base.
39
Architectural DetailingLighting fixtures, sconces, friezes, panels, railings, screens, and faux finishes
40
Architectural Detailing:LightingC U S T O M F I X T U R E S T H AT G O L I G H T Y E A R S B E Y O N D T H E O R D I N A R Y !
41
PROJECT
DATE CLIENT2002 BOSTON ATHENEUM
ASTROLABE FIXTURETHE ENTIRE SOLAR SYSTEM
12 WEEKS-BUILD+INSTALL 27,500- 10 1/2 BEACON ST., BOSTON, MA
Fantastic light fixture for the newly renovated Boston Athenaeum replicates an old world view of the solar system. Waterjet-cut aluminum, brazed copper tubing, glass. Designed with Swartz/Silver Architects.
42
PROJECT
DATE CLIENT1995 PRIVATE
BLUE WHITNEY SCONCESCULPTED LIGHT
2 WEEKS-BUILD 700- CHICAGO, IL
Fluorescents glow through the terraced layers of sandblasted blue acrylic, casting an architectonic light onto any space.
43
Architectural Detailing:Wall + Ceiling P A N E L S , S C R E E N S , A N D M U R A L S T H AT A R E B U I LT I N T O T H E E X I S T I N G FA C A D E S , A N D I N T E R I O R W A L L S
44
PROJECT
DATE CLIENT1999 HG
HARCOURT GENERALMAJOR IDENTITY WALL
14 WEEKS-BUILD+INSTALL 86,500- WORLD HEADQUARTERS, CHESTNUT HILL, MA
A splendid metallic painted aluminum skin is formed into multiple compound curves, which are bisected with a black granite slab, and punched through with a thick acrylic logo and glass vitrines. All panel edges are backlit with fibreoptics. Designed by Phil Seibert, KlingStubbins Architects.
45
PROJECT
DATE CLIENT1995 COP
CREATIVE OFFICE PAVILIONMURALS LET THE SKY IN
6 WEEKS-CREATE+INSTALL 28,500- BOSTON DESIGN CENTER, BOSTON, MA
A series of expansive, impressionistic skyscape wall murals painted on linen and applied to showroom interior walls.
46
PROJECT
DATE CLIENT1986 O E
OFFICE ENVIRONMENTSSCREENS + FAUX FINISHES
6 WEEKS-CREATE+INSTALL 31,000- SUMMER STREET, BOSTON, MA
Four suspended ceiling screens are covered with crushed stainless steel cloth, metallic patinas are applied to concrete columns. Minimal steel handrails, and faux finishes complete the look. Phil Manker worked closely with TRO Jung/Brannen.
47
PROJECT
DATE CLIENT2007 SHREVE, CRUMP & LOW
SHREVE’S EXTERIORLOGOS + SIGNAGE + GRILLS
5 WEEKS-CREATE+INSTALL 44,000-B O Y L S T O N S T R E E T, BOSTON, MA
Relief, backlit façade lettering, crests etched in naval brass, and ornate grills that replicate an old world pattern create a sumptuous look for this purveyor of fine jewelry since 1796.
48
PROJECT
DATE CLIENT2001 P + S
PARTNERS + SIMONSSCULPTURAL INTERIOR KIOSK
9 WEEKS-CREATE+INSTALL 29,000- 26 DRYDOCK AVENUE, BOSTON, MA
Structure with a dramatic array of brushed aluminum pillars jutting through it’s walls, along with cascading waves of folded stainless steel sheet. Drama is heightened with custom suspended low voltage lighting.
49
ExhibitsInstitutional history, museum, tradeshow + retail exhibits with dramatic impact
50
Exhibits:Facility D E D I C A T E D S T R U C T U R E S T H A T I N T R O D U C E V I S I T O R S T O T H E C O M P A N Y, I T ’ S P E O P L E , A N D I T ’ S P R O D U C T S
51
PROJECT
DATE CLIENT1997 PICTURETEL CORP.
PICTURETELINTERACTIVE KINETIC SCULPTURE
1 6 W E E K S - B U I L D + I N S T A L L 142,000- NORTH ANDOVER, MA
A set of beautiful sculptural forms house sophisticated corporate presentation tools, including a ProCube videowall system, custom digital clocks, and interactive welcome monitor. Materials are steel, stainless steel, aluminum, cherrywood, and PMS-colored acrylics.
52
PROJECT
DATE CLIENT1976 NATIONAL PARK SERVICE
OLD STATE HOUSEBICENTENNIAL EXHIBIT-NPS
2 8 W E E K S - B U I L D + I N S T A L L 124,000- BOSTON, MA
Many free-standing displays in 6 rooms showcase a wealth of objects and collections from Boston’s history. These obelisk-shaped cases optimize viewing from all sides, and incorporate state-of-the-art conservation details like ultraviolet-filtering acrylic. Exhibits were created for the National Park Service in honor of the nation’s Bicentennial.
53
PROJECT
DATE CLIENT1998 CMC
CHESHIRE MEDICAL CENTEREXPANSIVE HISTORICAL TIMELINE
20WEEKS-BUILD+INSTALL 85,000- KEENE, NH
This 64’L exhibit tells the story of a great institution through the balanced use of narrative text, engraved years, photos, backlit timeline milestones, inset artifact cases, and subtle iconography. History is brought to life. Designed by Sarah Springer/TSA.
54
PROJECT
DATE CLIENT1987 DIGITAL EQUIPMENT
D E C LOBBY EXHIBITSMULTI-LEVEL HISTORY
18WEEKS-D&B+INSTALL 155,000- MAYNARD, MA
An award-winning lobby exhibit features a timeline with glass year dividers, a full-scale VAX computer lineup, and internally lit building models showing the evolution of the computer environment.
55
Exhibits:TradeshowE Y E C AT C H I N G F O R M , A N D M O T I O N M A K E Y O U R C O M P A N Y ’ S P R O D U C T S S TA N D O U T F R O M T H E C R O W D
56
PROJECT
DATE CLIENT2001 MARKETSOFT CORP.
MARKETSOFT, 20’ X 40’SUPER CUSTOM SHOWBOOTH
14WEEKS-BUILD+SHIP 120,000- LEXINGTON, MA
This super custom booth has powerful graphics on spring-tensioned fabric panels surrounding a theatre. Features include a random-sequenced message wall, an oval closing room, cylindrical lightbox pylons, a dramatic rotating overhead logo sign, carpet with imprinted logos, and many other special features.
57
PROJECT
DATE CLIENT2007 GOMEZ INC.
GOMEZ, 10’ X 20’STATE-OF-THE-ART INLINE BOOTH
12WEEKS-DESIGN+BUILD+SHIP 80,000- LEXINGTON, MA
A striking high-tech tradeshow exhibit features a stainless steel backwall with graphics in relief, lit with an infinitely variable color fluorescent lighting system, custom printed carpet, moveable display towers, adjustable height seating, and many other unique features
58
PROJECT
DATE CLIENT2002 GENZYME
GENZYMEAMAZING KINETICS!
16WEEKS-BUILD+SHIP 78,000- CAMBRIDGE, MA
Extraordinary kinetic display demonstrates how Genzyme Diagnostics LDL kit measures cholesterol in the human body. Series of conveyors and rotating cylinders carry acetal balls in an endless loop. This piece drew crowds!
59
PROJECT
DATE CLIENT1992 DIGITAL EQUIPMENT CORP.
DECWORLD VIDEOWALLFEATURE PRESENTATION
12WEEKS-DES IGN+PRODUCE 132,000- MAYNARD, MA
Phil Manker wrote the script, designed and built the sets, co-directed the movie shoots, and edited + produced the final program for this major tradeshow feature presentation. Who says one guy can’t do it all?
60
PROJECT
DATE CLIENT1992 AMEX
AMERICAN EXPRESSMINIMAL SHOWBOOTH
10 WEEKS-BUILD+SHIP 50,000- NEW YORK, NY
Elegance in simplicity.
61
Exhibits:RetailL I G H T + M O T I O N A G A I N C R E AT E A N I R R E S I S T I B L E AT T R A C T I O N F O R R E TA I L C U S T O M E R S I N T H E U LT R A - H I G H T R A F F I C M A L L E N V I R O N M E N T
62
PROJECT
DATE CLIENT1995 STRIDERITE CORP.
STRIDERITEIRRESISTIBLE RETAIL DISPLAYS
2 2 W E E K S - B U I L D + I N S T A L L 245,000- LEXINGTON, MA
Cool interactive ball towers, moving shoe mobile, and games make the shoe shopping experience an exciting one for children. These elements are installed in 25 retail stores nationwide. Interior designed by Elkus/Manfredi Architects. The interaction observed has shown that motion does attract people!
63
SignageLogos, and environmental graphics, for corporate and healthcare
64
Signage:Environmental GraphicsC O R P O R A T E L O G O S I G N A G E + G R A P H I C S TA N D A R D S
65
PROJECT
DATE CLIENT1997 GILLETTE
THE GILLETTE COMPANYCEO OFFICE LOGO SIGNAGE
1 0 W E E K S - B U I L D + I N S T A L L 52,000- BOSTON, MA
Cast bronze plaques with curved faces and bas relief logos flank the entry doors. The lobby has a sandblasted glass backlit logo panel with perfect blue gradation, and applied aluminum lettering. GHK designed the interior.
66
PROJECT
DATE CLIENT1994 GILLETTE
THE GILLETTE COMPANYNORTH ATLANTIC GROUP GLASS LOGO
1 2 W E E K S - B U I L D + I N S T A L L 65,000- BOSTON, MA
A special corporate lobby logo sign with eight floating layers of water-clear floor to ceiling sandblasted glass, held in matrixes. Custom lighting responds inversely to exterior light levels.
67
PROJECT
DATE CLIENT1992 GILLETTE
THE GILLETTE COMPANYENVIRONMENTAL GRAPHIC STANDARDS
10WEEKS-DESIGN 20,000- BOSTON, MA
Complete design of a standards manual for corporate facility signage in North America. And logo signs for other divisions.
68
PROJECT
DATE CLIENT1997 IBM/LOTUS
IBM/LOTUS DEVELOPMENTPRODUCT LAUNCH
6 WEEKS-BUILD+INSTALL 80,000- CAMBRIDGE, MA
New software product launch is accentuated with a mobile, banners on custom column mounts, and relief signs.
69
PROJECT
DATE CLIENT1992 GE
GENERAL ELECTRICLOGO
4 WEEKS-BUILD+INSTALL 15,000- LYNN, MA
CNC-machined backlit acrylic logo for GE’s ‘Factory of the Future’ for helicopter engines.
70
PROJECT
DATE CLIENT1990 J&J
JOHNSON & JOHNSONWORLD SCREEN
6 WEEKS-BUILD+INSTALL 38,000- LYNN, MA
A discreet set of screen panels between the reception area and executive offices. Laminated Cesar Color glass with custom graphics on the vinyl interlayer. Polished brass captures the glass at floor and ceiling. Interior design by GHK.
71
Signage:Environmental GraphicsC O M P L E T E W A Y F I N D I N G S Y S T E M S F O R C O R P O R AT E A N D H E A LT H C A R E
72
PROJECT
DATE CLIENT1983-9 BETH ISRAEL
BETH ISRAEL DEACONESSCOMPLETE SIGNAGE SYSTEM
6 YEARS-PRODUCTION + INSTALLATION 285,000- LONGWOOD AVENUE, BOSTON, MA
Production of 7,500 signs, 42 sign types, in 10 buildings. Innovative aluminum frame system with changeable inserts. Environmental graphic system design by Jon Roll & Associates.
73
PROJECT
DATE CLIENT1991-94 HARVARD PILGRIM
HARVARD PILGRIM HEALTHCARECOMPLETE SIGNAGE SYSTEM
3 YEARS-PRODUCTION + INSTALLATION 145,000- BROOKLINE, MA
A wide range of wayfinding and directional signage, with magnetic inserts, for twelve facilities. Design by Steffian-Bradley Architects.
74
ClientsPhil has worked with a wide range of clients in many fields, worldwide
75
Phil Manker works hard!Here he is, welding Corten steel planters for around 99High St., Boston.
76
Recommended