Orange County Public Schools

Site 20-E-SW-4 ES ReliefPlanning Phase Community Meeting

May 21, 2018Superintendent Dr. Barbara Jenkins Chief Facilities Officer John Morris

Orange County Public Schools Site 20-E-SW-4 ES Relief

2

Meeting Agenda6:00pm, May 21, 2018; Waterbridge ES Cafeteria

•Welcome – School Board Member, Mrs. Linda Kobert

•Introductions - Facilities Meeting Organizer, Jessma Lambert

•Governmental Approvals – Julie Salvo, Facilities Planning

•Project Update – Architect: Rhodes+Brito ArchitectsConstruction Manager: TBD

•Questions and Answers

•Adjournment

Orange County Public Schools

Local Government Approval Process

• Property zoned P-D (Site #20-E-W-4 International Drive Area Elementary School PD/LUP)

• Project is subject to Development Plan (DP) approval by Orange County’s Development Review Committee (DRC)

Site 20-E-SW-4 ES Relief

3

Orange County Public Schools Site 20-E-SW-4 ES Relief

District 4 Aerial 4

Tangelo Park ES

Waterbridge ES

Site 20-E-SW-4 ES Relief

I-4FL

Turnpike

528

International Dr.

Orange County Public Schools Site 20-E-SW-4 ES Relief

Vicinity Map 5

Site 20-E-SW-4 ES Relief

International Dr.

I-4

Orange County Public Schools Site 20-E-SW-4 ES Relief

Project Site Aerial 6

Planned Facility:

NEW Campus on vacant site to Meet District Standards for Elementary Schools: • Prototypical Core Spaces

Enhanced Learning Environment: • Latest Technology • Planned Site Circulation• Safety • Community Asset

Project SiteInte

rnat

iona

l Dr.

S.

Orange County Public Schools Site 20-E-SW-4 ES Relief

Conceptual Site Plan 7

Orange County Public Schools Site 20-E-SW-4 ES Relief

Conceptual Site Plan 8

Orange County Public Schools Site 20-E-SW-4 ES Relief

Example - Classroom 11

Orange County Public Schools Site 20-E-SW-4 ES Relief

Example - Technology 12

Planned Facility: Technology : Campus

The technology package will include:

• Student and teacher computers

• Interactive Flat Panel• White boards• Skills labs (Computer &

Science)• Wireless Access• Audio Enhancement

Orange County Public Schools Site 20-E-SW-4 ES Relief

Example – Media Center 13

Planned Facility: Media Center

The Media Center will include:

• Genius bar• Library tables for an

entire class• Story-telling area• CCTV studio• Audio Enhancement

Orange County Public Schools Site 20-E-SW-4 ES Relief

Example – Multi-Purpose Room 14

Planned Facility: Cafeteria

The Cafeteria will include:

• Kitchen• Two Serving Lines• Teacher Dining• Elevated Stage• Extended Day Office• Restrooms

Orange County Public Schools Site 20-E-SW-4 ES Relief

Example – Music Room 15

Planned Facility: Specialty Classrooms

• Art Classroom with kiln• Science Classroom• Music Classroom

Orange County Public Schools Site 20-E-SW-4 ES Relief

Example – Administration / Lobby 16

Planned Facility: Administration

The administrative area includes:• Single point of entry during school hours• Lobby • Administrative offices, workroom & storage• Large conference room• Clinic• Teacher planning areas

Orange County Public Schools Site 20-E-SW-4 ES Relief

Example – Play Equipment 17

Planned Facility: Physical Education

Physical Education will include:• PE Office and storage• Covered play canopy• Basketball Courts• Tot lot play structure• Youth lot play structure• Playfields

Orange County Public Schools Site 20-E-SW-4 ES Relief

Example – Main Entry 18

Planned Facility: Site Circulation

• On-site car stacking•On-site parking•Bus loop• Covered walkways• Safe pedestrian paths• Bike racks

Orange County Public Schools Site 20-E-SW-4 ES Relief

Schedule 19

Design & Construction Schedule

20202018May Nov Jun

GMP

Completed Design

Building Construction

Move-in Date

Jan

2019

Mar May

2019

Apr

2020

Orange County Public Schools

Thank you to the Orange County taxpayers, who make our construction program possible.

Questions?

20