Orange County Public Schools
Site 20-E-SW-4 ES ReliefPlanning Phase Community Meeting
May 21, 2018Superintendent Dr. Barbara Jenkins Chief Facilities Officer John Morris
Orange County Public Schools Site 20-E-SW-4 ES Relief
2
Meeting Agenda6:00pm, May 21, 2018; Waterbridge ES Cafeteria
•Welcome – School Board Member, Mrs. Linda Kobert
•Introductions - Facilities Meeting Organizer, Jessma Lambert
•Governmental Approvals – Julie Salvo, Facilities Planning
•Project Update – Architect: Rhodes+Brito ArchitectsConstruction Manager: TBD
•Questions and Answers
•Adjournment
Orange County Public Schools
Local Government Approval Process
• Property zoned P-D (Site #20-E-W-4 International Drive Area Elementary School PD/LUP)
• Project is subject to Development Plan (DP) approval by Orange County’s Development Review Committee (DRC)
Site 20-E-SW-4 ES Relief
3
Orange County Public Schools Site 20-E-SW-4 ES Relief
District 4 Aerial 4
Tangelo Park ES
Waterbridge ES
Site 20-E-SW-4 ES Relief
I-4FL
Turnpike
528
International Dr.
Orange County Public Schools Site 20-E-SW-4 ES Relief
Vicinity Map 5
Site 20-E-SW-4 ES Relief
International Dr.
I-4
Orange County Public Schools Site 20-E-SW-4 ES Relief
Project Site Aerial 6
Planned Facility:
NEW Campus on vacant site to Meet District Standards for Elementary Schools: • Prototypical Core Spaces
Enhanced Learning Environment: • Latest Technology • Planned Site Circulation• Safety • Community Asset
Project SiteInte
rnat
iona
l Dr.
S.
Orange County Public Schools Site 20-E-SW-4 ES Relief
Conceptual Site Plan 7
Orange County Public Schools Site 20-E-SW-4 ES Relief
Conceptual Site Plan 8
Orange County Public Schools Site 20-E-SW-4 ES Relief
Example - Classroom 11
Orange County Public Schools Site 20-E-SW-4 ES Relief
Example - Technology 12
Planned Facility: Technology : Campus
The technology package will include:
• Student and teacher computers
• Interactive Flat Panel• White boards• Skills labs (Computer &
Science)• Wireless Access• Audio Enhancement
Orange County Public Schools Site 20-E-SW-4 ES Relief
Example – Media Center 13
Planned Facility: Media Center
The Media Center will include:
• Genius bar• Library tables for an
entire class• Story-telling area• CCTV studio• Audio Enhancement
Orange County Public Schools Site 20-E-SW-4 ES Relief
Example – Multi-Purpose Room 14
Planned Facility: Cafeteria
The Cafeteria will include:
• Kitchen• Two Serving Lines• Teacher Dining• Elevated Stage• Extended Day Office• Restrooms
Orange County Public Schools Site 20-E-SW-4 ES Relief
Example – Music Room 15
Planned Facility: Specialty Classrooms
• Art Classroom with kiln• Science Classroom• Music Classroom
Orange County Public Schools Site 20-E-SW-4 ES Relief
Example – Administration / Lobby 16
Planned Facility: Administration
The administrative area includes:• Single point of entry during school hours• Lobby • Administrative offices, workroom & storage• Large conference room• Clinic• Teacher planning areas
Orange County Public Schools Site 20-E-SW-4 ES Relief
Example – Play Equipment 17
Planned Facility: Physical Education
Physical Education will include:• PE Office and storage• Covered play canopy• Basketball Courts• Tot lot play structure• Youth lot play structure• Playfields
Orange County Public Schools Site 20-E-SW-4 ES Relief
Example – Main Entry 18
Planned Facility: Site Circulation
• On-site car stacking•On-site parking•Bus loop• Covered walkways• Safe pedestrian paths• Bike racks
Orange County Public Schools Site 20-E-SW-4 ES Relief
Schedule 19
Design & Construction Schedule
20202018May Nov Jun
GMP
Completed Design
Building Construction
Move-in Date
Jan
2019
Mar May
2019
Apr
2020
Orange County Public Schools
Thank you to the Orange County taxpayers, who make our construction program possible.
Questions?
20
Site 20-E-SW-4 ES Relief