HYUNDAI WIND TURBINE · 2019-06-03 · ELECTRO ELECTRIC SYSTEMS 3/11 . Hyundai Wind Turbine Factory...

Preview:

Citation preview

HYUNDAI WIND TURBINE 2010.10.15.

Hyundai Heavy Industries’

Clean energy for the better future

1/12

Global Leader

in Shipbuilding

1,800 Acre

About 27,000

Employees

Hyundai Heavy Industries Co.,LTD. (HHI)

450 times of football fields

2/12

Business Divisions

ENGINE &

MACHINERY

INDUSTRIAL PLANT

& ENGINEERING

CONSTRUCTION

EQUIPMENT

SHIPBUILDING

OFFSHORE &

ENGINEERING

RENEWABLE ENERGY - WIND TURBINE

- SOLAR CELL & MODULE

ELECTRO ELECTRIC

SYSTEMS

3/11

Hyundai Wind Turbine Factory

Annual Capacity

600MW 33 Acres

100 Employees

Hyundai Wind Turbine Gunsan factory <Completed on September 2009>

4/11

1. Assembly & Factory Test Shop

2. Shipping Area

Hyundai Wind Turbine Factory

5/11

W/T model introduction-1

1) HQ1650 2) HQ2000

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

0 5 10 15 20

Pow

er

[kW

]

Wind Speed [m/s]

HQ1650/82

HQ1650/77

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

2,000

2,200

0 5 10 15 20 25

Pow

er

[kW

]

Wind Speed [m/s]

HQ2000/86

HQ2000/93

- Rated Power : 1.65MW

- Generator : DFIG

- Rotor Diameter : 80M

- Hub Height : 70M

– Rated Power : 2.0MW

– Generator : DFIG

– Rotor Diameter : 86M

– Hub Height : 80M

6/11

3) AV928(on-shore/off-shore) 4) HQ5000(Off-Shore)

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

2,000

2,200

2,400

2,600

0 5 10 15 20 25

Po

wer

[kW

]

Wind Speed [m/s]

– Rated Power : 2.5MW

– Generator : PMG

– Rotor Diameter 92M

– Hub Height : 80M

– Rated Power : 5MW

– Generator : PMSG

– Rotor Diameter 140M

– Hub Height 100M :

: :

W/T model introduction-2

7/11

• Location : 2 Yard in HHI

• Operation Start : 2009. 7.

• Availability : 98.5 %

• C.F(Capacity Factor) : 21.6 %

• Total Energy Production : 3.46 GWh

(Operation Period : 2009. 7.~2010.9.)

HQ1650 Prototype

W/T model introduction-3

8/11

• Location : Gunsan

• Operation Start : 2010. 6.

• Availability : 93.9 %

• C.F(Capacity Factor) : 9.4 %

• Total Energy Production : 378 MWh

(Operation Period : 2010. 6.~2010.9.)

HQ2000 Prototype

W/T model introduction-5

9/11

• Location : Beihai in china

• Operation Start : 2010. 6.

• Availability : 97.5 %

• C.F (Capacity Factor) : 29.4 %

• Total Energy Production : 1.6 GWh

( Operation Period : 2010. 6.~2010.9. )

AV928 Prototype

W/T model introduction-6

10/11

Thank you for your attention. 11/11