12
HYUNDAI WIND TURBINE 2010.10.15.

HYUNDAI WIND TURBINE · 2019-06-03 · ELECTRO ELECTRIC SYSTEMS 3/11 . Hyundai Wind Turbine Factory Annual Capacity 600MW 33 Acres 100 Employees Hyundai Wind Turbine Gunsan factory

  • Upload
    others

  • View
    4

  • Download
    1

Embed Size (px)

Citation preview

Page 1: HYUNDAI WIND TURBINE · 2019-06-03 · ELECTRO ELECTRIC SYSTEMS 3/11 . Hyundai Wind Turbine Factory Annual Capacity 600MW 33 Acres 100 Employees Hyundai Wind Turbine Gunsan factory

HYUNDAI WIND TURBINE 2010.10.15.

Page 2: HYUNDAI WIND TURBINE · 2019-06-03 · ELECTRO ELECTRIC SYSTEMS 3/11 . Hyundai Wind Turbine Factory Annual Capacity 600MW 33 Acres 100 Employees Hyundai Wind Turbine Gunsan factory

Hyundai Heavy Industries’

Clean energy for the better future

1/12

Page 3: HYUNDAI WIND TURBINE · 2019-06-03 · ELECTRO ELECTRIC SYSTEMS 3/11 . Hyundai Wind Turbine Factory Annual Capacity 600MW 33 Acres 100 Employees Hyundai Wind Turbine Gunsan factory

Global Leader

in Shipbuilding

1,800 Acre

About 27,000

Employees

Hyundai Heavy Industries Co.,LTD. (HHI)

450 times of football fields

2/12

Page 4: HYUNDAI WIND TURBINE · 2019-06-03 · ELECTRO ELECTRIC SYSTEMS 3/11 . Hyundai Wind Turbine Factory Annual Capacity 600MW 33 Acres 100 Employees Hyundai Wind Turbine Gunsan factory

Business Divisions

ENGINE &

MACHINERY

INDUSTRIAL PLANT

& ENGINEERING

CONSTRUCTION

EQUIPMENT

SHIPBUILDING

OFFSHORE &

ENGINEERING

RENEWABLE ENERGY - WIND TURBINE

- SOLAR CELL & MODULE

ELECTRO ELECTRIC

SYSTEMS

3/11

Page 5: HYUNDAI WIND TURBINE · 2019-06-03 · ELECTRO ELECTRIC SYSTEMS 3/11 . Hyundai Wind Turbine Factory Annual Capacity 600MW 33 Acres 100 Employees Hyundai Wind Turbine Gunsan factory

Hyundai Wind Turbine Factory

Annual Capacity

600MW 33 Acres

100 Employees

Hyundai Wind Turbine Gunsan factory <Completed on September 2009>

4/11

Page 6: HYUNDAI WIND TURBINE · 2019-06-03 · ELECTRO ELECTRIC SYSTEMS 3/11 . Hyundai Wind Turbine Factory Annual Capacity 600MW 33 Acres 100 Employees Hyundai Wind Turbine Gunsan factory

1. Assembly & Factory Test Shop

2. Shipping Area

Hyundai Wind Turbine Factory

5/11

Page 7: HYUNDAI WIND TURBINE · 2019-06-03 · ELECTRO ELECTRIC SYSTEMS 3/11 . Hyundai Wind Turbine Factory Annual Capacity 600MW 33 Acres 100 Employees Hyundai Wind Turbine Gunsan factory

W/T model introduction-1

1) HQ1650 2) HQ2000

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

0 5 10 15 20

Pow

er

[kW

]

Wind Speed [m/s]

HQ1650/82

HQ1650/77

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

2,000

2,200

0 5 10 15 20 25

Pow

er

[kW

]

Wind Speed [m/s]

HQ2000/86

HQ2000/93

- Rated Power : 1.65MW

- Generator : DFIG

- Rotor Diameter : 80M

- Hub Height : 70M

– Rated Power : 2.0MW

– Generator : DFIG

– Rotor Diameter : 86M

– Hub Height : 80M

6/11

Page 8: HYUNDAI WIND TURBINE · 2019-06-03 · ELECTRO ELECTRIC SYSTEMS 3/11 . Hyundai Wind Turbine Factory Annual Capacity 600MW 33 Acres 100 Employees Hyundai Wind Turbine Gunsan factory

3) AV928(on-shore/off-shore) 4) HQ5000(Off-Shore)

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

2,000

2,200

2,400

2,600

0 5 10 15 20 25

Po

wer

[kW

]

Wind Speed [m/s]

– Rated Power : 2.5MW

– Generator : PMG

– Rotor Diameter 92M

– Hub Height : 80M

– Rated Power : 5MW

– Generator : PMSG

– Rotor Diameter 140M

– Hub Height 100M :

: :

W/T model introduction-2

7/11

Page 9: HYUNDAI WIND TURBINE · 2019-06-03 · ELECTRO ELECTRIC SYSTEMS 3/11 . Hyundai Wind Turbine Factory Annual Capacity 600MW 33 Acres 100 Employees Hyundai Wind Turbine Gunsan factory

• Location : 2 Yard in HHI

• Operation Start : 2009. 7.

• Availability : 98.5 %

• C.F(Capacity Factor) : 21.6 %

• Total Energy Production : 3.46 GWh

(Operation Period : 2009. 7.~2010.9.)

HQ1650 Prototype

W/T model introduction-3

8/11

Page 10: HYUNDAI WIND TURBINE · 2019-06-03 · ELECTRO ELECTRIC SYSTEMS 3/11 . Hyundai Wind Turbine Factory Annual Capacity 600MW 33 Acres 100 Employees Hyundai Wind Turbine Gunsan factory

• Location : Gunsan

• Operation Start : 2010. 6.

• Availability : 93.9 %

• C.F(Capacity Factor) : 9.4 %

• Total Energy Production : 378 MWh

(Operation Period : 2010. 6.~2010.9.)

HQ2000 Prototype

W/T model introduction-5

9/11

Page 11: HYUNDAI WIND TURBINE · 2019-06-03 · ELECTRO ELECTRIC SYSTEMS 3/11 . Hyundai Wind Turbine Factory Annual Capacity 600MW 33 Acres 100 Employees Hyundai Wind Turbine Gunsan factory

• Location : Beihai in china

• Operation Start : 2010. 6.

• Availability : 97.5 %

• C.F (Capacity Factor) : 29.4 %

• Total Energy Production : 1.6 GWh

( Operation Period : 2010. 6.~2010.9. )

AV928 Prototype

W/T model introduction-6

10/11

Page 12: HYUNDAI WIND TURBINE · 2019-06-03 · ELECTRO ELECTRIC SYSTEMS 3/11 . Hyundai Wind Turbine Factory Annual Capacity 600MW 33 Acres 100 Employees Hyundai Wind Turbine Gunsan factory