FEH Layout, Status. John Arthur – LCLS Expt’l Facilities Div June 3, 2009. LCLS new construction. Undulator Hall. Near Experimental Hall. Front End Enclosure. Far Experimental Hall. First LCLS FEL light at 1.5 Å. Gain vs undulator length at 1.5 Å. FEL gain length = 3.3 m. - PowerPoint PPT Presentation

Citation preview

1 John Arthurjarthur@slac.stanford.edu

1FEH StatusCXI Review June 3, 2009

FEH Layout, Status

John Arthur – LCLS Expt’l Facilities DivJune 3, 2009

2 John Arthurjarthur@slac.stanford.edu

2FEH StatusCXI Review June 3, 2009

Near Experimental Hall

Far Experimental Hall

Front End Enclosure

Undulator Hall

LCLS new construction

3 John Arthurjarthur@slac.stanford.edu

3FEH StatusCXI Review June 3, 2009

First LCLS FEL light at 1.5 Å

4 John Arthurjarthur@slac.stanford.edu

4FEH StatusCXI Review June 3, 2009

Gain vs undulator length at 1.5 Å

FEL gain length = 3.3 m

FEL saturation indicated

Pulse energy ~ 1 mJ

5 John Arthurjarthur@slac.stanford.edu

5FEH StatusCXI Review June 3, 2009

3 Hutches

X-ray transport tunnel

Far Experimental Hall

Near Experimental Hall

Front End Enclosure

3 Hutches

The LCLS X-ray Beamline

6 John Arthurjarthur@slac.stanford.edu

6FEH StatusCXI Review June 3, 2009

FEE

Gas Detectors

Gas Attenuator

Direct Imager(Scintillator) FEL Offset Mirror Systems

Beam Direction

SolidAttenuators

K-Mono

Calorimeter

Slit

5 mm collimator

7 John Arthurjarthur@slac.stanford.edu

7FEH StatusCXI Review June 3, 2009

800-2000 eV to Hutch 1

800-2000 eV to Hutch 2

2000-25000 eV to Hutch 3-6

insertable

insertable

HOMS: Hard x-ray Offset Mirror System

SOMS: Soft x-ray Offset Mirror System

LCLS Offset Mirror Systems

Shadow Wall

Wall 2

8 John Arthurjarthur@slac.stanford.edu

8FEH StatusCXI Review June 3, 2009

Far Experimental Hall

9 John Arthurjarthur@slac.stanford.edu

9FEH StatusCXI Review June 3, 2009

Roll-up door (interlocked)

HPS door (one per hutch)

Accelerator status lights (two places)

PPS door (Tunnel entrance)

PPS control (keybank, etc)

HPS control

Online-offline status lights

FEH Hutch Layout

exit

10 John Arthurjarthur@slac.stanford.edu

10FEH StatusCXI Review June 3, 2009

Roll-up door (interlocked)

HPS door (one per hutch)

Accelerator status lights (two places)

HPS control

Online-offline status lights

FEH Hutch Layout Detail

20 m

9 m

11 John Arthurjarthur@slac.stanford.edu

11FEH StatusCXI Review June 3, 2009

FEH Hutch construction plan

Bids were well below estimates

Contract about to be signedSteel frame procurement already under way

Construction finished Dec 2009CXI installation could start early 2010

Basic services installed Feb 2010Network, PPS

12 John Arthurjarthur@slac.stanford.edu

12FEH StatusCXI Review June 3, 2009

Open issues with hutches

PPS design needs to be finalized

Utilization of mezzanine

Cooling water system upgrade

These issues will be easier to resolve when instrument designs are final

13 John Arthurjarthur@slac.stanford.edu

13FEH StatusCXI Review June 3, 2009

Summary

LCLS works

FEH hutches will be ready in early 2010

Operations support including User support is in place

Support staff being hired

Recommended