EPC Project Execution Orientation Course

Preview:

Citation preview

HERVE

BARON©

20

13

–H

erv

é B

aro

n

The execution of a Complex Project…

A guided tour

HERVE

BARON

HERVE

BARON©

20

13

–H

erv

é B

aro

n

The actors

The COMPANY

“Client”The EPC

Contractor

The suppliers

The sub-contractors

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Conceptual evaluation+ Pre-Project

By COMPANY

Basic EngineeringBy ENGINEERING

Project Executionby EPC CONTRACTOR

Sanction Sanction

The phases

HERVE

BARON©

20

13

–H

erv

é B

aro

nDesign Procurement Manufacturing Shipping

InstallationConstruction & erection

Inspection & tests

Hand-over

HERVE

BARON©

20

13

–H

erv

é B

aro

nThe multiple sides of a Project

Hu

man

Reso

urces M

anag

emen

t

Project Control

PROJECT

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Engineering Sub-Contractor

(India)

Detail Engineering (part)

Shipyard (Korea)

Hull Engineering & Fabrication

Shipyards (Singapore &

Malaysia)

Topsides Fabrication & Integration

Home office (Paris)•Project management

•Detail Engineering (part)

•Procurement

Satellite office

Detail Engineering (part)

Fabrication yard (Nigeria):Fabrication (part)

Offshore (Nigeria):Installation, commissioning, start-up

The multiple sites of a Project

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Project

Engineering Procurement Construction

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Project

Engineering Procurement Construction

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Process facilities:

Feedstock and products flow

Feedstock composition

Battery limit conditions

Equipment Spare

Performance:

Products specifications

Energy efficiency, emissions

Utilities:

Electric power supply

Other utilities

Systems:

Process control

Fire/gas alarm

Public address, LAN, PABX

Infrastructure:

Administrative and technical buildings

Control room

Access road

Site fencing, gates, check point

Design criteria:

% of over design

Environment data:

Min/max temperature

Rain/snow fall

Wind

Geological conditions

Applicable codes and standards:

International standards

Local rules

0 5

10 15 20 25 30 35 40 45 50

-85 -80 -75 -70 -65 -60 -55 P

ress

ure

(bar

)

The facilities design basis

HERVE

BARON©

20

13

–H

erv

é B

aro

n

EngineeringDocuments for Purchase:

bill of quantity & specification

Documents for Construction:

Construction drawings & specifications

Design basis:

- Functional requirements

- Client specifications

- Design codes

Engineeringin the Project

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Project

Engineering

Instruments& Control

Layout& Piping

Process Electrical Equipment Civil Safety

Procurement Construction

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Project

Engineering

Instruments& Control

Layout& Piping

Process Electrical Equipment Civil Safety

Procurement Construction

HERVE

BARON©

20

13

–H

erv

é B

aro

nProcess simulations

HERVE

BARON©

20

13

–H

erv

é B

aro

nHeat & Material balance

Thermodynamic calculations

Process Flow Diagram (PFD)

HERVE

BARON©

20

13

–H

erv

é B

aro

nEquipment list

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Equipment duty

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Process data sheet

HERVE

BARON©

20

13

–H

erv

é B

aro

nProcess Flow Diagram (PFD)

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Piping & Instrumentation Diagram (P&ID)

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Piping & Instrumentation Diagram (P&ID)

HERVE

BARON©

20

13

–H

erv

é B

aro

nProcess control

HERVE

BARON©

20

13

–H

erv

é B

aro

nEmergency shut down

HERVE

BARON©

20

13

–H

erv

é B

aro

nEmergency relief

HERVE

BARON©

20

13

–H

erv

é B

aro

nOperating manual

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Project

Engineering

Instruments& Control

Layout& Piping

Process Electrical Equipment Civil Safety

Procurement Construction

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Rotating machinery

HERVE

BARON©

20

13

–H

erv

é B

aro

nPressure vessels

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Heat exchangers

HERVE

BARON©

20

13

–H

erv

é B

aro

nPackages,

Fired Equipment

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Process data sheet

Mechanical data sheet

HERVE

BARON©

20

13

–H

erv

é B

aro

nMaterial Requisition

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Project

Engineering

Instruments& Control

Layout& Piping

Process Electrical Equipment Civil Safety

Procurement Construction

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON©

20

13

–H

erv

é B

aro

nFire fighting

HERVE

BARON©

20

13

–H

erv

é B

aro

nPassive fire protection

HERVE

BARON©

20

13

–H

erv

é B

aro

nFire & Gas detection layout

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Environmental Impact Assessment

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Project

Engineering

Instruments& Control

Layout& Piping

Process Electrical Equipment Civil Safety

Procurement Construction

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Equipment supporting structures

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Piping supporting structures (pipe-racks)

HERVE

BARON©

20

13

–H

erv

é B

aro

nStructural design

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Structural drawings

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Architectural drawings

Equipment layout drawing

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Project

Engineering

Instruments& Control

Layout& Piping

Process Electrical Equipment Civil Safety

Procurement Construction

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Layout/

principles

HERVE

BARON©

20

13

–H

erv

é B

aro

nLayout/consideration for all networks

HERVE

BARON©

20

13

–H

erv

é B

aro

n

General Plot Plan

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Piping Layout drawing

HERVE

BARON©

20

13

–H

erv

é B

aro

n3D modelling

HERVE

BARON©

20

13

–H

erv

é B

aro

n

3D model review

3D model clash check

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Piping DesignANSI B31.8 (for gas pipelines and compressor stations)

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Piping DesignANSI B31.8 (for gas pipelines and compressor stations)

HERVE

BARON©

20

13

–H

erv

é B

aro

nThickness (mm) Number of passes

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON©

20

13

–H

erv

é B

aro

nIsometric drawing

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Piping Pre-fabrication

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Piping General Arrangement drawing

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON©

20

13

–H

erv

é B

aro

nStandard Pipe Support drawings

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON©

20

13

–H

erv

é B

aro

nMaterial Selection

HERVE

BARON©

20

13

–H

erv

é B

aro

nMaterial Specification

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Material Specification

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Project

Engineering

Instruments& Control

Layout& Piping

Process Electrical Equipment Civil Safety

Procurement Construction

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Instrument data sheet

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Process Control System

HERVE

BARON©

20

13

–H

erv

é B

aro

n

System architecture drawing

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Mechanical Equipment Control

HERVE

BARON©

20

13

–H

erv

é B

aro

n

PT JB

Process line

Marshalling

cabinet

Controller

cabinet

Instrument room Control room

VDU

CPU

LANSecondary cable

Multi cable

The instrumentation hardware

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Building detail drawing/

Telecom and PAGA layout

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Cable routing drawings

Cable list

HERVE

BARON©

20

13

–H

erv

é B

aro

nCable routing inside technical room

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Project

Engineering

Instruments& Control

Layout& Piping

Process Electrical Equipment Civil Safety

Procurement Construction

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Electrical consumer list

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Electrical Load Summary

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON©

20

13

–H

erv

é B

aro

n

General One Line Diagram

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Generators

Switchgear

Transformer

Single line diagram

HERVE

BARON©

20

13

–H

erv

é B

aro

nElectrical equipment layout

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Electrical Control System

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Process design

PFDs

H&M balance

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Process design

PFDs

H&M balance

Rotating

Pressure vessels

Fired equipment

Heat exchangers

Packages etc.

Process

data sheet

Equipment specification

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Process design

PFDs

H&M balance

P&IDs

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Process design

PFDs

H&M balance

Rotating

Pressure vessels

Fired equipment

Heat exchangers

Packages etc.

P&IDs

Piping

Instrumentation

Layout

Civil

Electrical

Process

data sheet

Equipment specification

Vendor

drawings

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Process design

PFDs

H&M balance

Rotating

Pressure vessels

Fired equipment

Heat exchangers

Packages etc.

P&IDs

Piping

Instrumentation

Layout

Civil

Electrical

Process

data sheet

Equipment specification

Vendor

drawings

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Vendor

Instrumentation &

Control

Electrical

Layout

Civil

PipingProcess

HERVE

BARON©

20

13

–H

erv

é B

aro

n

What Engineering designed

What the Vendor supplied

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Field Engineering

HERVE

BARON©

20

13

–H

erv

é B

aro

nA unique synthesis for the busy Project professional200 pages, 250 illustrations

Interested and wanting to know more on Engineering?

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Project

Engineering Procurement Construction

HERVE

BARON©

20

13

–H

erv

é B

aro

nProcurement

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Inquiry (Call for Tender)

Short listing

Bid analysis

Clarifications

Negotiations

Purchase Order

Expediting

Inspection

Delivery

Warranty Period

Procurement / Steps

HERVE

BARON©

20

13

–H

erv

é B

aro

nProcurement / Supplier selection criteria

Technical Compliance

Price

Qualification of supplier

Schedule

Load of workshop

References

References with final Client

Financial situation

Annual turn-over

Internal feed-back

HERVE

BARON©

20

13

–H

erv

é B

aro

nProcurement

HERVE

BARON©

20

13

–H

erv

é B

aro

nExpediting

HERVE

BARON©

20

13

–H

erv

é B

aro

nExpediting

HERVE

BARON©

20

13

–H

erv

é B

aro

nInspection

HERVE

BARON©

20

13

–H

erv

é B

aro

nInspection

HERVE

BARON

© 2013 – Hervé BaronS

hipp

ing

HERVE

BARON

© 2013 – Hervé BaronS

hipp

ing

HERVE

BARON

© 2013 – Hervé Baron

Shi

ppin

g

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Project

Engineering Procurement Construction

HERVE

BARON©

20

13

–H

erv

é B

aro

nEarthworks

HERVE

BARON

© 2013 – Hervé BaronP

ipel

ine

HERVE

BARON

© 2013 – Hervé BaronP

ipel

ine

HERVE

BARON

© 2013 – Hervé BaronR

oads

HERVE

BARON©

20

13

–H

erv

é B

aro

nBuildings

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Admixtures

Sand

Aggregate

Cement

Civil Works

HERVE

BARON©

20

13

–H

erv

é B

aro

nCivil Works

HERVE

BARON©

20

13

–H

erv

é B

aro

nCivil Works

HERVE

BARON©

20

13

–H

erv

é B

aro

nCivil Works

HERVE

BARON©

20

13

–H

erv

é B

aro

nCivil Works

HERVE

BARON©

20

13

–H

erv

é B

aro

nCivil Works

HERVE

BARON©

20

13

–H

erv

é B

aro

nPre-fabrication

HERVE

BARON

© 2013 – Hervé BaronE

rect

ion

HERVE

BARON©

20

13

–H

erv

é B

aro

nUnderground networks

HERVE

BARON©

20

13

–H

erv

é B

aro

nPlant erection

HERVE

BARON©

20

13

–H

erv

é B

aro

nSteel structure erection

HERVE

BARON©

20

13

–H

erv

é B

aro

nEquipment installation

HERVE

BARON©

20

13

–H

erv

é B

aro

nEquipment installation

HERVE

BARON©

20

13

–H

erv

é B

aro

nPiping Pre-fabrication

HERVE

BARON©

20

13

–H

erv

é B

aro

nPiping erection

HERVE

BARON©

20

13

–H

erv

é B

aro

nPiping erection

HERVE

BARON©

20

13

–H

erv

é B

aro

nField Instrumentation Installation

HERVE

BARON©

20

13

–H

erv

é B

aro

nElectrical equipment connection

HERVE

BARON©

20

13

–H

erv

é B

aro

nCable pulling

HERVE

BARON©

20

13

–H

erv

é B

aro

nArrangement of Technical rooms

HERVE

BARON©

20

13

–H

erv

é B

aro

nCable connections

HERVE

BARON©

20

13

–H

erv

é B

aro

nOther Systems Field Equipment Installation

HERVE

BARON©

20

13

–H

erv

é B

aro

nControl room consoles installation

HERVE

BARON

© 2013 – Hervé BaronTe

stin

g

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Sub-System

Junction

Box

Instrument

Loop

Instrument

Cable

Mech Equip

Document Folder

Handover System

Elect EquipCircuit

Instrument

Tag

Commissioning

HERVE

BARON©

20

13

–H

erv

é B

aro

nThe multiple sides of a Project

Hu

man

Reso

urces M

anag

emen

t

Project Control

PROJECT

HERVE

BARON©

20

13

–H

erv

é B

aro

nProject Organisation

Project Manager

Engineering Manager

Project Engineers

Discipline Engineers

Process

Civil

Instrumentation

Electrical

Equipment

Procurement Manager

Purchasers Expediters Inspectors

Site Manager

Construction Manager

Construction Superintendent

Construction supervisor

Construction superintendent

Construction supervisor

Project Control Manager

Contract Manager

Scheduling Manager

Cost Control

HERVE

BARON©

20

13

–H

erv

é B

aro

nProject procedures

HERVE

BARON©

20

13

–H

erv

é B

aro

nProject temporary facilities

HERVE

BARON©

20

13

–H

erv

é B

aro

nProject temporary facilities

HERVE

BARON©

20

13

–H

erv

é B

aro

nProject temporary facilities

HERVE

BARON©

20

13

–H

erv

é B

aro

nProject temporary facilities

HERVE

BARON©

20

13

–H

erv

é B

aro

nProject temporary facilities

HERVE

BARON©

20

13

–H

erv

é B

aro

nConstruction Procedures

HERVE

BARON

© 2013 – Hervé Baron

HERVE

BARON©

20

13

–H

erv

é B

aro

nQuality Control

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Slump

SamplingTemperature

Quality Control

HERVE

BARON©

20

13

–H

erv

é B

aro

nQuality Control

HERVE

BARON©

20

13

–H

erv

é B

aro

nCost Control

HERVE

BARON©

20

13

–H

erv

é B

aro

nInsurance

HERVE

BARON©

20

13

–H

erv

é B

aro

nContracts

P.O.

Sub

P.O.

P.O.

Main Contract

Purchase

Orders

Sub-Contracts

EPC

Sub

HERVE

BARON©

20

13

–H

erv

é B

aro

nContracts

Main Contract

EPC

Terms and Conditions

Price

Schedule

Performance guarantees

Technical basis

Specifications, codes & stds

HERVE

BARON©

20

13

–H

erv

é B

aro

nContracts

E

HERVE

BARON©

20

13

–H

erv

é B

aro

nContracts

E P

HERVE

BARON©

20

13

–H

erv

é B

aro

nContracts

E P C

HERVE

BARON©

20

13

–H

erv

é B

aro

nContracts

∑ + x%

HERVE

BARON©

20

13

–H

erv

é B

aro

nConstruction contracts

Civil

HERVE

BARON©

20

13

–H

erv

é B

aro

nConstruction contracts

Mechanical

HERVE

BARON©

20

13

–H

erv

é B

aro

nConstruction contracts

E&I

HERVE

BARON©

20

13

–H

erv

é B

aro

nConstruction contracts

General Contractor

HERVE

BARON©

20

13

–H

erv

é B

aro

n

ContractsTerms and Conditions

Main Contract

EPC

Obligations of the 2 parties

Limit of liability

Penalties in case of bad performance

Conflict resolution

HERVE

BARON©

20

13

–H

erv

é B

aro

nQuality Assurance (QA)

HERVE

BARON©

20

13

–H

erv

é B

aro

nQuality Assurance (QA)

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Quality Assurance (QA)

Email vs Technical Query…

Email

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Quality Assurance (QA)

Unformal/Unrecoverable!

Formal/Recoverable!

Email

Email vs Technical Query…

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Quality Assurance (QA)

Unformal/Unrecoverable!

Formal/Recoverable!

Email

Email vs Technical Query…

Think of somebody trying to find out what was CPY decision in 3 years time...

HERVE

BARON©

20

13

–H

erv

é B

aro

nQuality Assurance (QA)

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Discipline code

A Instrumentation & Control

C Civil engineering

E Electrical

G Project general documents

J Mechanical

K Safety

M Piping & Layout

P Processes

S Steel Structures

V Vessels – Heat exchangers

W Materials – Welding

Document code

1 Installation drawings

2 Detail drawings

3 Diagrams

4 Lists – Bill of Quantities

5 Isometrics

6 Calculation notes

7 Specifications

8 Data sheets

9 Requisitions

Document Control

HERVE

BARON©

20

13

–H

erv

é B

aro

nDocument Control

HERVE

BARON©

20

13

–H

erv

é B

aro

nDocument Control

Engineering

Documents submitted to client

Client

Approval/

Comments

Vendors

Documents submission

Comments

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Intranet / Internet

Intranet / Internet

Breakdown structures

Projects

Interfaces

Reports

Satellite Engineering

Center

Center 1 Sr. Mgmt Center 2 Sr.

Mgmt

Construction Site

Electronic Document

Management System

Engineering

documents

Vendor

documents

Correspondence

etc.

Electronic Document Management System

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Interface Management

HERVE

BARON©

20

13

–H

erv

é B

aro

n

7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36PLANT START-UPPIPING PRE-FABRICATION & INSTALLATION X X X X X X X X X XPIPING MATERIAL & DRAWINGS AT SITEPIPING MATERIAL MANUFACTURING & SHIPPING X X X X X XPURCHASE OF PIPING MATERIALTECHNICAL & COMMERCIAL CLARIFICATIONS X XCALL FOR TENDER FOR PIPING MATERIALPREPARE PIPING MATERIAL TAKE-OFF XPIPING ROUTING STUDIES X X XPIPING & INSTRUMENTATION DIAGRAMS (PIDs)

PROJECT SCHEDULEMONTH

1

1

2 3

3

45

2

4 5

5

Scheduling

HERVE

BARON©

20

13

–H

erv

é B

aro

nScheduling

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Progress Monitoring

How would you measure progress?

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Progress Monitoring

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Progress Monitoring

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Progress Monitoring

HERVE

BARON©

20

13

–H

erv

é B

aro

n

15 years ago: 2D

Today: 3D

Tomorrow:

3D & data

IT

HERVE

BARON

© 2013 – Hervé Baron

IT

HERVE

BARON

© 2013 – Hervé Baron

Saf

ety

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Safety

Guard Rail System with ToeBoards

Cross Bracing

Planking

Runner

Bearer

Longitudinal Brace

Post

Sill

HERVE

BARON

© 2013 – Hervé BaronS

afet

y

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Human resources / career path

3-5 yrs

5 yrs

Graduate Engineer, 25 years old

5-7 yrs

40-45 yrs oldProject Manager

Engineering Manager/Deputy Project Manager

Project Engineer

Process Engineer

Note: the career pattern shown here is a very fast track one to the PM position... One would enjoy oneself just as well taking more time!

HERVE

BARON©

20

13

–H

erv

é B

aro

n

Beyond this presentation…

http://www.toblog.fr/en/baron.html

� Share my new developments� Find my other on-line and classroom training