Orange County Public Schools
100% Design Complete/Construction KickoffCommunity Meeting
Site 84-E-W-4May 23, 2016
WINNERWelcome! Please sign in on your mobile device:
http://communitymeeting.ocps.net/
Orange County Public SchoolsOrange County Public Schools
Site 84-E-W-4 Elementary SchoolMeeting AgendaMay 23, 2016: MetroWest Elementary School, 6:00 pm
•Introductions
•Welcome – Pam Gould, School Board Member
•Project Update – Facilities Meeting OrganizerArchitect: Harvard Jolly ArchitectsConstruction Manager: Gilbane Building Company
•Questions and Answers
•Adjournment
2
Orange County Public Schools
Existing Site Conditions
Existing Portables
Pavilion
Bus Loop
Parent Loop
Parent
Loop
Parent
Loop
Retention
Area
Retention
Area
Play
Field
Play
Field
CEP
Staff
Parking
Visitor/Staff Parking
N
Bldg
200
Classroom
Bldg
300
Classroom
Bldg 400
Mullti-PurposeBldg 100
Admin
Bldg
1000
Classroom
Bldg
1100
Classroom
Bldg 700
Music, ArtBldg 800
Media Center
Bldg
500
Classroom
Bldg
600
MP
Bldg 900
Admin
Hard
court
LAKE VILMA DR
WE
ST
PO
IN
TE
B
LV
D
ST
EE
R L
AK
E R
D
Existing CampusStudent Enrollment: 1,600 StudentsAcreage: 25 AcresParking Capacity: 189 CarsCar Queue Capacity: 104 Cars
New
Portables (2)
New
Portables (2)
3
Orange County Public Schools
Existing Parent Drop-Off/Pick Up
34 Car
Queue
(Double)
26 Car
Queue
(Single)
20 Car
Queue
(Single)
24 Car
Queue
(Single)
Inadequate
Separation
LAKE VILMA DR
WE
ST
PO
IN
TE
B
LV
D
ST
EE
R L
AK
E R
D
Existing Car Queue: 104 Cars
Required Car Queue: 248 Cars
Total Car Queue Provided both Campuses: 300 Cars
N
4
Orange County Public Schools
North Zone Map – Traffic Pattern
N
Steer Lake Rd
Ed
gew
oo
d R
an
ch
Rd
Hiawassee Rd
Raleigh St
Kir
km
an
Rd
North Zone
Westpointe Blvd
La
ke
Vil
ma
Dr
North
Campus
5
Orange County Public Schools
N
Steer Lake Rd
Westpointe BlvdE
dg
ew
oo
d R
an
ch
Rd
Hiawassee Rd
Raleigh St
Kir
km
an
Rd
South Zone
La
ke
Vil
ma
Dr
South Zone Map – Traffic Pattern
South
Campus
South Campus entrance takes 50% of the school traffic off of Lake Vilma Dr.
6
Orange County Public Schools
Master Site Plan
N
Bldg 200Classroom
Bldg 300Classroom
Bldg 400Mullti-Purpose
Bldg900
Admin
Bldg 1000Classroom
Bldg 1100Classroom
Portables
Bldg 700Music, Art
Bldg 800Classroom
Bldg500
Classroom
Bldg600
Classroom
Parent Loop
Parent Loop
RetentionArea
RetentionArea
Play Field(45,000 sf)
CEP Staff Parking
Staff Parking
StaffParking
Visitor/StaffParking
Bldg100
Admin
WE
ST
PO
IN
TE
B
LV
D
Bus Loop
Portables
Play Field(45,000 sf)
RetentionArea
BusLoop
CoveredPlay
Bike
Bike
Bike
Bike
LAKE VILMA DR
ST
EE
R L
AK
E R
D
Visitor
Parking
Walker/Bike
Walker/Bike
Walker/Bike
Walker/Bike
CoveredPlay
Portables
Bldg 100Admin, Classroom,
Multi-Purpose,Media Center
Bldg500
Media Center
Denotes New Construction
7
Orange County Public Schools
North Campus Site Plan
Bldg 200Classroom
Bldg 300Classroom
Bldg 400Mullti-Purpose
Bldg900
Admin
Bldg 1000Classroom
Parent Loop
RetentionArea
Staff Parking
Staff Parking
Bldg100
Admin
Bus Loop
Portables
Play Field(45,000 sf)
Bike
Bike
LAKE VILMA DR
ST
EE
R L
AK
E R
D
Visitor
Parking
Walker/Bike
Walker/Bike
CoveredPlay
Hardcourt
Youth
Tot
Non-PlayArea
South Campus
Walker/Bike
Walker/Bike
Project Data
Capacity837 Students
Building AreaExisting: 89,714 sfNew: 5,206 sf
Total 94,920 sf(Exterior walkways not included in building area)
Parking Provided136 Spaces
Car Queuing Provided139 Cars
Bus Loop CapacityRequired: 8 Buses
Denotes New Construction
Bldg500
Media Center
N
8
Orange County Public Schools
North Campus Fencing Plan
Bldg 200Classroom
Bldg 300Classroom
Bldg 400Mullti-Purpose
Bldg900
Admin
Bldg 1000Classroom
Parent Loop
RetentionArea
Staff Parking
Staff Parking
Bldg100
Admin
Bus Loop
Portables
Play Field(45,000 sf)
LAKE VILMA DR
ST
EE
R L
AK
E R
D
Visitor
Parking
CoveredPlay
Hardcourt
Youth
Tot
Non-PlayArea
South Campus
Bike
Bike
Project Data
Capacity837 Students
Building AreaExisting: 89,714 sfNew: 5,206 sf
Total 94,920 sf(Exterior walkways not included in building area)
Parking Provided136 Spaces
Car Queuing Provided139 Cars
Bus Loop CapacityRequired: 8 Buses
Denotes New Construction
Denotes Fence Line
N
Bldg500
Media Center
9
Orange County Public Schools
South Campus Site Plan
Bldg 1100Classroom
Portables
Bldg 700Music, Art
Bldg 800Classroom
Bldg500
Classroom
Bldg600
Classroom
Parent Loop
RetentionArea
Play Field(45,000 sf)
CEPStaffParking
Visitor/StaffParking
WE
ST
PO
IN
TE
B
LV
D RetentionArea
CoveredPlay
Bike
Bike
LAKE VILMA DR
Walker/Bike
Walker/Bike
Portables
Youth
Tot
Bus Loop
Hardcourt
Service
North Campus
StaffParking
Project Data
Capacity837 Students
Building AreaExisting: 51,655 sfNew: 45,719 sf
Total 97,374 sf(Exterior walkways not included in building area)
Parking Provided136 Spaces
Car Queuing Provided161 Cars
Bus Loop CapacityRequired: 8 Buses
Denotes New Construction
N
Bldg 100Admin, Classroom,
Multi-Purpose,Media Center
12
Orange County Public Schools
South Campus Fencing
Bldg 1100Classroom
Portables
Bldg 700Music, Art
Bldg 800Classroom
Bldg500
Classroom
Bldg600
Classroom
Parent Loop
RetentionArea
Play Field(45,000 sf)
CEPStaffParking
Visitor/StaffParking
WE
ST
PO
IN
TE
B
LV
D RetentionArea
CoveredPlay
Bike
Bike
LAKE VILMA DR
Portables
Youth
Tot
Bus Loop
Hardcourt
Service
North Campus
StaffParking
Project Data
Capacity837 Students
Building AreaExisting: 51,655 sfNew: 45,719 sf
Total 97,374 sf(Exterior walkways not included in building area)
Parking Provided136 Spaces
Car Queuing Provided161 Cars
Bus Loop CapacityRequired: 8 Buses
Denotes New Construction
Denotes Fence Line
N
Bldg 100Admin, Classroom,
Multi-Purpose,Media Center
Retaining Wall
13
Orange County Public Schools
Construction Logistics
1. Coordinate construction and school activities while school is in session and during testing periods
2. Minimize noise and dust
3. Double constructionfence
4. JLA badges required for all workers
5. Material delivery coordination –none during arrival and dismissal
N
LAKE VILMA DR
ST
EE
R L
AK
E R
D
16
Orange County Public Schools
Phasing Plan
Phase 1A
Phase 1A6/03/16 – 7/29/16
1. South Entrance Drive and Parent Loop
2. South Retention Pond
N
LAKE VILMA DR
ST
EE
R L
AK
E R
D
17
Orange County Public Schools
Phasing Plan
Phase 1A
Phase 1B
Phase 1B6/10/16 – 7/29/16
1. North Bus Loop and Staff Parking
2. North Retaining Wall
N
LAKE VILMA DR
ST
EE
R L
AK
E R
D
18
Orange County Public Schools
Phasing Plan
Phase 2A
Phase 1A
Phase 1B
Phase 2A6/15/16 – 3/10/17
1. New Media Center
2. South Bus Loop
3. East Retaining Wall
N
LAKE VILMA DR
ST
EE
R L
AK
E R
D
19
Orange County Public Schools
Phasing Plan
Phase 3
Phase 2A
Phase 1A
Phase 1B
Phase 36/15/16 – 4/24/17
1. New 2-Story Building
2. New South Parking
3. New South Covered Play
N
LAKE VILMA DR
ST
EE
R L
AK
E R
D
20
Orange County Public Schools
Traffic Pattern – Back To School Fall 2016
Phase 3
Phase 2A
N
Parent Drop Off/Pick Up
Parent Drop Off/Pick Up
Bus LoopNew Entrance
LAKE VILMA DR
ST
EE
R L
AK
E R
D
Construction Entrance
Phase 36/15/16 – 4/24/17
1. New 2-Story Building
2. New South Parking
3. New South Covered Play
21
Orange County Public Schools
Phasing Plan
Phase 2BPhase 3
LAKE VILMA DR
ST
EE
R L
AK
E R
D
N
Phase 2B3/27/17 – 6/30/17
1. Re-Purpose Multi-Purpose Room (Bldg 600)
2. Re-Purpose Media Center (Bldg 800)
22
Orange County Public Schools
Phasing Plan
Phase 4
Phase 2B
LAKE VILMA DR
ST
EE
R L
AK
E R
D
Phase 45/31/17 – 7/31/17
1. North Play Field
2. North Playground and Hardcourt
3. Re-Purpose Existing Buildings
4. South Play Field
5. South Playground and Hardcourt
6. South Staff Parking
7. Median Cut and Turn Lane at Westpointe Blvd
Phase 4
Phase 4
23
Orange County Public Schools
Phasing Plan
Phase 4
Phase 4Phase 4
Phase 2BPhase 3
Phase 2A
Phase 1A
Phase 1B
LAKE VILMA DR
ST
EE
R L
AK
E R
D
Phase 45/31/17 – 7/31/17
1. North Play Field
2. North Playground and Hardcourt
3. Re-Purpose Existing Buildings
4. South Play Field
5. South Playground and Hardcourt
6. North Staff Parking
7. Median Cut and Turn Lane at Westpointe Blvd
24
Orange County Public Schools
Rendering at Main Entry – South Campus 25
Orange County Public Schools
West Elevation
South Elevation
Painted Tilt-Up
Concrete Panels
Exterior Elevations - Building 100 South
Aluminum Walkway
Canopies
Painted Tilt-Up
Concrete Panels
26
East Elevation
Orange County Public Schools
Metrowest Elementary School is designed to meet Green Globes sustainable building standards
Sustainable Features include:
SiteNative/low water landscaping – reduced water consumptionLow Impact Design (LID) stormwater design
Building10% more energy efficient than ASHRAE 90.1 standardHigh Efficient Chillers (8% energy reduction)Light colored roof reduces heat gain and improves energy efficiencyEnergy Star rated equipmentWater saving toilets, faucets and fixturesAll general classrooms have daylightingOver 75% of ALL spaces have daylightingThermal efficient windows/glazingFully automated building control system
Sustainability 27
Orange County Public Schools
Example – Reception 28
Orange County Public Schools
Example – Classroom 29
Orange County Public Schools
Example – Media Center 30
Orange County Public Schools
Example – Cafeteria & Multi-Purpose Room 31
Orange County Public Schools
Example – Kitchen 32
Orange County Public Schools
Example – Play Equipment 33
Orange County Public Schools
Example – Play Equipment 34
Orange County Public Schools
QUESTIONS?
35
Recommended