Jakarta, 07 April 2017
PLN - New and Renewable Division Corporate Planning Directorate
DEVELOPMENT OF MINI HYDROPOWER PLANT IN INDONESIA
www.pln.co.id | 1 Source : RUPTL 2017-2026
Status Numbers of Numbers of
IPP Capacity(kW) PLN Capacity(kW) Total (numbers) Total Capacity (kW)
Operation 66 207,848 114 132,035 180 339,883 Construction 33 178,304 4 10,000 37 188,304 Financing 39 195,768 4 9,000 43 204,768 PPA Process 18 100,250 18 100,250 Proposal 183 842,662 183 842,662 Study 5 18,238 5 18,238 Grand Total 339 1,524,832 127 169,273 466 1,694,105
Terminated 35 152,510 35 152,510
MINIHYDRO DEVELOPMENT SUMMARY (April 2017)
www.pln.co.id | 2 Source : RUPTL 2017-2026
ADDITION OF NRE POWER PROJECT 2017-2026
No Pembangkit - EBT Kapasitas Jumlah 1 PLTP MW 2,510 2 PLTA MW 4,562 3 PLTMH MW 437 4 PLT Surya MWp - 5 PLT Bayu MW 250 6 PLT Biomass/Sampah MW 206 7 PLT Kelautan MW - 8 PLT Bio-Fuel Ribu Kilo Liter 474
MW 7,965 Jumlah
No Pembangkit - EBT Kapasitas Jumlah 1 PLTP MW 3,305 2 PLTA MW 4,284 3 PLTMH MW 983 4 PLT Surya MWp 5 5 PLT Bayu MW - 6 PLT Biomass/Sampah MW 274 7 PLT Kelautan MW - 8 PLT Bio-Fuel Ribu Kilo Liter 958
MW 8,851 Jumlah
No Pembangkit - EBT Kapasitas Jumlah 1 PLTP MW - 2 PLTA MW 1,056 3 PLTMH MW 10 4 PLT Surya MWp - 5 PLT Bayu MW 150 6 PLT Biomass/Sampah MW 41 7 PLT Kelautan MW - 8 PLT Bio-Fuel Ribu Kilo Liter 548
MW 1,257 Jumlah
No Pembangkit - EBT Kapasitas Jumlah 1 PLTP MW 400 2 PLTA MW 2,323 3 PLTMH MW 221 4 PLT Surya MWp 52 5 PLT Bayu MW 170 6 PLT Biomass/Sampah MW 21 7 PLT Kelautan MW - 8 PLT Bio-Fuel Ribu Kilo Liter 686
MW 3,186 Jumlah
No Pembangkit - EBT Kapasitas Jumlah 1 PLTP MW 75 2 PLTA MW 118 3 PLTMH MW 43 4 PLT Surya MWp - 5 PLT Bayu MW 45 6 PLT Biomass/Sampah MW 10 7 PLT Kelautan MW - 8 PLT Bio-Fuel Ribu Kilo Liter 375
MW 290 Jumlah
www.pln.co.id | 3
MHPP DEVELOPTMENT PLANNING IN INDONESIA
Source : RUPTL 2017-2026
JAWA-BALI REGION
435.07 MW
SUMATERA REGION
964.8 MW
KALIMANTAN REGION
10.2 MW SULAWESI & NUSA
TENGGARA REGION
220.58 MW MALUKU & PAPUA
REGION
42.9 MW
TOTAL INDONESIA 1,683.55 MW
www.pln.co.id |
SUMATERA REGION
3
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 TOTAL
PPA 6 58.5 64.9 13.6 143
Construction 14 49 10.4 73.4
Planning 748.4 748.4
WEST JAVA REGION 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 TOTAL
PPA 3 15.3 17.8 36.1
Construction 26.2 42.9 15.3 3 87.4
Planning 34.5 74.1 25.8 22.3 156.7
MINIHYDRO DEVELOPTMENT PLANNING IN INDONESIA
www.pln.co.id |
CENTRAL JAVA REGION
4
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 TOTAL
PPA
Construction 4.5 0.5 5.0
Planning 5.8 9.6 38.2 13.7 27.1 94.4
EAST JAVA & BALI REGION 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 TOTAL
PPA 1.5 1.5
Construction 1.4 1.4 2.8
Planning 0.7 3.6 27 10.2 9.5 51
MINIHYDRO DEVELOPTMENT PLANNING IN INDONESIA
www.pln.co.id |
KALIMANTAN REGION
5
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 TOTAL
PPA
Construction
Planning 10.2 10.2
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 TOTAL
PPA
Construction 8.9 8.3 17.2
Planning 4 18.7 38.5 78.5 59.5 199.2
SULAWESI & NTT/B REGION
MINIHYDRO DEVELOPTMENT PLANNING IN INDONESIA
www.pln.co.id |
MALUKU & PAPUA REGION
6
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 TOTAL
PPA
Construction
Planning 14.4
1.4 27.1 42.9
MINIHYDRO DEVELOPTMENT PLANNING IN INDONESIA
www.pln.co.id | 7
IMPLEMENTATION of MEMR REGULATION No. 12/2017
www.pln.co.id | 8
PROCUREMENT PROCESS according to MEMR REGULATION No. 12/2017
1. Developer prepare Feasibility Study and Interconnection Study, licensing and Environmental Study,
2. PLN will conduct evaluation and Due Diligence (Technical and Financial) on point 1 above’
3. Tariff negotiation 4. PPA
www.pln.co.id | 9
PREPARATION REQUIRED by PLN
1. Preparing the Due Diligence document, 2. Preparing the draft of PPA pursuant to MEMR Regulation
No. 10/2017 and No. 12/2017 and PLN Board of Directors Circular No. PLN. 0010.E/DIR/ 2016 on the Procurement Technical Guidelines of PLN,
3. Setting up internal procedure and human resources for Due Diligence and Tariff Negotiation
www.pln.co.id | 10
1. The purchasing of Minihydro energy processed in the PLN Region/Distribution and the existence of limited human resources in PLN Region/Distribution and also the negotiation process will take a long time, it is proposed not to negotiate Minihydro tariff. Need approval from the Board of Directors on the tariff of purchasing power from Minihydro capacity ≤ 10 MW as follows: a. If the local BPP is above the national BPP, then the tariff is equal to 85% of
the local BPP, b. If the local BPP is equal to or below the national BPP, then the tariff is equal
to the local BPP, c. If the 85% of the local BPP is below the national BPP, then the tariff is the
same as the national BPP. 2. The tariff can be set in USD, but the transaction will based on Rupiah.
PROPOSED ADJUSTMENT FOR MINIHYDRO (Required Approval from Board of Directors)
Thank You