DEVELOPMENT OF MINI HYDROPOWER PLANT IN INDONESIA · PDF file1 pltp mw 2,510 2 plta mw 4,562...

Preview:

Citation preview

Jakarta, 07 April 2017

PLN - New and Renewable Division Corporate Planning Directorate

DEVELOPMENT OF MINI HYDROPOWER PLANT IN INDONESIA

www.pln.co.id | 1 Source : RUPTL 2017-2026

Status Numbers of Numbers of

IPP Capacity(kW) PLN Capacity(kW) Total (numbers) Total Capacity (kW)

Operation 66 207,848 114 132,035 180 339,883 Construction 33 178,304 4 10,000 37 188,304 Financing 39 195,768 4 9,000 43 204,768 PPA Process 18 100,250 18 100,250 Proposal 183 842,662 183 842,662 Study 5 18,238 5 18,238 Grand Total 339 1,524,832 127 169,273 466 1,694,105

Terminated 35 152,510 35 152,510

MINIHYDRO DEVELOPMENT SUMMARY (April 2017)

www.pln.co.id | 2 Source : RUPTL 2017-2026

ADDITION OF NRE POWER PROJECT 2017-2026

No Pembangkit - EBT Kapasitas Jumlah 1 PLTP MW 2,510 2 PLTA MW 4,562 3 PLTMH MW 437 4 PLT Surya MWp - 5 PLT Bayu MW 250 6 PLT Biomass/Sampah MW 206 7 PLT Kelautan MW - 8 PLT Bio-Fuel Ribu Kilo Liter 474

MW 7,965 Jumlah

No Pembangkit - EBT Kapasitas Jumlah 1 PLTP MW 3,305 2 PLTA MW 4,284 3 PLTMH MW 983 4 PLT Surya MWp 5 5 PLT Bayu MW - 6 PLT Biomass/Sampah MW 274 7 PLT Kelautan MW - 8 PLT Bio-Fuel Ribu Kilo Liter 958

MW 8,851 Jumlah

No Pembangkit - EBT Kapasitas Jumlah 1 PLTP MW - 2 PLTA MW 1,056 3 PLTMH MW 10 4 PLT Surya MWp - 5 PLT Bayu MW 150 6 PLT Biomass/Sampah MW 41 7 PLT Kelautan MW - 8 PLT Bio-Fuel Ribu Kilo Liter 548

MW 1,257 Jumlah

No Pembangkit - EBT Kapasitas Jumlah 1 PLTP MW 400 2 PLTA MW 2,323 3 PLTMH MW 221 4 PLT Surya MWp 52 5 PLT Bayu MW 170 6 PLT Biomass/Sampah MW 21 7 PLT Kelautan MW - 8 PLT Bio-Fuel Ribu Kilo Liter 686

MW 3,186 Jumlah

No Pembangkit - EBT Kapasitas Jumlah 1 PLTP MW 75 2 PLTA MW 118 3 PLTMH MW 43 4 PLT Surya MWp - 5 PLT Bayu MW 45 6 PLT Biomass/Sampah MW 10 7 PLT Kelautan MW - 8 PLT Bio-Fuel Ribu Kilo Liter 375

MW 290 Jumlah

www.pln.co.id | 3

MHPP DEVELOPTMENT PLANNING IN INDONESIA

Source : RUPTL 2017-2026

JAWA-BALI REGION

435.07 MW

SUMATERA REGION

964.8 MW

KALIMANTAN REGION

10.2 MW SULAWESI & NUSA

TENGGARA REGION

220.58 MW MALUKU & PAPUA

REGION

42.9 MW

TOTAL INDONESIA 1,683.55 MW

www.pln.co.id |

SUMATERA REGION

3

2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 TOTAL

PPA 6 58.5 64.9 13.6 143

Construction 14 49 10.4 73.4

Planning 748.4 748.4

WEST JAVA REGION 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 TOTAL

PPA 3 15.3 17.8 36.1

Construction 26.2 42.9 15.3 3 87.4

Planning 34.5 74.1 25.8 22.3 156.7

MINIHYDRO DEVELOPTMENT PLANNING IN INDONESIA

www.pln.co.id |

CENTRAL JAVA REGION

4

2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 TOTAL

PPA

Construction 4.5 0.5 5.0

Planning 5.8 9.6 38.2 13.7 27.1 94.4

EAST JAVA & BALI REGION 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 TOTAL

PPA 1.5 1.5

Construction 1.4 1.4 2.8

Planning 0.7 3.6 27 10.2 9.5 51

MINIHYDRO DEVELOPTMENT PLANNING IN INDONESIA

www.pln.co.id |

KALIMANTAN REGION

5

2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 TOTAL

PPA

Construction

Planning 10.2 10.2

2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 TOTAL

PPA

Construction 8.9 8.3 17.2

Planning 4 18.7 38.5 78.5 59.5 199.2

SULAWESI & NTT/B REGION

MINIHYDRO DEVELOPTMENT PLANNING IN INDONESIA

www.pln.co.id |

MALUKU & PAPUA REGION

6

2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 TOTAL

PPA

Construction

Planning 14.4

1.4 27.1 42.9

MINIHYDRO DEVELOPTMENT PLANNING IN INDONESIA

www.pln.co.id | 7

IMPLEMENTATION of MEMR REGULATION No. 12/2017

www.pln.co.id | 8

PROCUREMENT PROCESS according to MEMR REGULATION No. 12/2017

1. Developer prepare Feasibility Study and Interconnection Study, licensing and Environmental Study,

2. PLN will conduct evaluation and Due Diligence (Technical and Financial) on point 1 above’

3. Tariff negotiation 4. PPA

www.pln.co.id | 9

PREPARATION REQUIRED by PLN

1. Preparing the Due Diligence document, 2. Preparing the draft of PPA pursuant to MEMR Regulation

No. 10/2017 and No. 12/2017 and PLN Board of Directors Circular No. PLN. 0010.E/DIR/ 2016 on the Procurement Technical Guidelines of PLN,

3. Setting up internal procedure and human resources for Due Diligence and Tariff Negotiation

www.pln.co.id | 10

1. The purchasing of Minihydro energy processed in the PLN Region/Distribution and the existence of limited human resources in PLN Region/Distribution and also the negotiation process will take a long time, it is proposed not to negotiate Minihydro tariff. Need approval from the Board of Directors on the tariff of purchasing power from Minihydro capacity ≤ 10 MW as follows: a. If the local BPP is above the national BPP, then the tariff is equal to 85% of

the local BPP, b. If the local BPP is equal to or below the national BPP, then the tariff is equal

to the local BPP, c. If the 85% of the local BPP is below the national BPP, then the tariff is the

same as the national BPP. 2. The tariff can be set in USD, but the transaction will based on Rupiah.

PROPOSED ADJUSTMENT FOR MINIHYDRO (Required Approval from Board of Directors)

Thank You