Country EstatesFinal Report

PARAGON

Project Team Mike Reeves – Project Manager

Cole Marr – Project Engineer

Bryce Beckstrom – Project Engineer

Amanda Sheehe – Project Editor

Project DescriptionDesign RequirementsProject ApproachWork Completed Projected Work

Project Description

Project Description 66 Acres 22 Estate Size Homes 1-2 Acre Lots ± 33 Acre Community

Space High Efficiency Low Environmental

Impact

Existing Site

Proposed Development

Design Requirements

Objectives Develop 3 Wastewater Treatment Options Develop Stormwater Management Plan Incorporate Greywater Treatment and Reuse Wetland Habitat Area Community Recycling Program Design Trail Around Site

Preliminary Feasibility Study Location Zoning Utilities Transportation Site Characteristics

Environmental Site Assessment Site Reconnaissance

Current and Past Use Tax Information Other Concerns

Interviews Josh Reed – Property Owner Hancock County Assessor’s Office

Codes & Regulations

Regulation Entities Hancock County Conservation Subdivision IDNR LEED 10 State Standards AASHTO

LID Design Options

Preliminary Site Plan Designed According

to Hancock County

Will Meet R-1 Zoning

1-2 Acre Lots for

Adequate Septic

In Contact with Mike Dale - Planning Dept

Use Natural Lay of

Land to Reduce Cut and Fill in Roadway

Roundabout Designed to Standards (TFHDC)

Preliminary Site Plan

Geotechnical Analysis

Wildcat Dynamic Cone Penatrometer

Tube Samples (6” &3’)

Laboratory Analysis of Samples Unconfined Compression Test (ASTM D2166)

Atterberg Limits (ASTM D4318)

Particle Size Analysis (ASTM D422)

Assessment of Wastewater Options 3 Options Considered

Conventional Septic System

Presby Treatment System

Wetlands Treatment

Assessment of Wastewater Options Decision Matrix Criteria

Decision Matrix Results

Alternative Percentage Weighting

Environmental Impact 30%

Cost 30%

Feasibility 20%

Creativity 20%

AlternativeEnvironmental

ImpactCost Feasibility Creativity Total

Conventional Septic 0.9 0.6 0.3 0.45 2.25

Presby System 0.3 0.3 0.15 0.3 1.05

Wetlands Treatment 0.6 0.6 0.45 0.3 1.95

Hydraulics and Hydrology

Design for 100-yr flood Route stormwater

through wetlands Size pipes to control

flooding Design water quality

trenches Promote natural

overland flow

Existing vs Proposed 100-year Storm Routing

Wetlands Treat 170 acres Design wet pond to

allow for sediment settling/quality volume

Research vegetation for the wetlands

Design outlet structure that controls 100-year flood

Erosion Control Plan

Minimize sediment runoff into Miller Ditch

Minimize cut and fill on-site: 680cy cut

Reduce soil that leave site via truck tires

LID/Conservation Highlights 50% Community

Space 20 Lots front

community space Enviro-Septic

Wastewater Treatment

Density meets maximum requirement

Highlights

22 Lots, 1-2 Acres Each Site Layout/Roadway Design Sustainable LID Designs for:

Wastewater

Greywater

Stormwater

$440,000 Cost Estimates for Design/Construction/Lifecycle

Recommended