Construction Data - Queensland Major Contractors Association · Compression Facility Enerflex Mine...

Preview:

Citation preview

Construction Data

QMCA Breakfast Briefing

Proudly designed and supported in Australia

Field-based construction delivery platform, connecting project leaders with real-time insights and visibility of project performance.

Envision projects

Key project history

Caval Ridge

Coal Plant

Thiess

Ichthys LNG Control

Buildings

Leightons

WestConnex

New M5

CPB + Dragados + Samsung

Gold Coast

Light Rail

CPB

Mondarra Gas

Compression

Facility

Enerflex

Mine Construction

and Defect Liability

Royhill

Upstream

Compression

Thiess + QGC

M4 M5 link

tunnels

LendLease

Brisbane Parallel

Runway

CPB + BMD

APLNG Sustaining

Infrastructure

CPB + MPC

CR2SM

Seymour Whyte +

Fulton Hogan

>270projects

+$20 billionin project value

>150kmroad

>1,150kmrail

>1,200MWpower

>11,400kmpipeline

Oyu Tlgoi

(Mongolia)

Clough

Port Moresby

Power Station

Clough

2011 2013 2014 2015 2016 20182012 20192017

Construction industry challenges

Poor productivity – labour productivity has not kept pace with overall economic productivity

McKinsey & Company

Performance challenges – cost and schedule overruns are normal

McKinsey & Company

Digital adoption - amongst the least digitalized of all industries

McKinsey & Company

Cost of disputes – Impact in Australia more than $7B annually

CRC Construction Innovation

Industry failures

Good newsis bad news fast

IS DATA THE NEW OIL?

Weigh-Bridge

Records

Site

Attendance

Weather

Station

Records

Program

Actuals

Equipment

SMU Hours

Material

Test Results

Timesheets

Load

Counts

Equipment

GPS

Safety

Inspections

Equipment

Breakdowns

Subcontractor

Dockets

Unplanned

Site

Conditions

Construction

Data

Survey

Data

Percent

Complete

Cost and

Production

Rates

Weather

Delay

Claims

Commercial

Claims

Equipment

Utilisation

CPI

SPI

Earned

Value

Safety

Exposure

Hours

Daily ReportsProgress

Claims

Data formats

Daily Diary

(Paper)

Timesheet

(Spreadsheet)

GPS Device

(API Message)

Weigh Bridge

(Screen data - handwritten)

Weather Station

(XML Log)

Gate

Attendance

(CSV Log)

Quantity Survey

(Spreadsheet)

Paper ScannedHandwriting

Data Maturity

FreeText

Structured Data

Self-DescribingData

Reporting effortSenior Project Engineers

are spending 70% of their

end of month effort

determining cost position

and accruals.

Leaving only 30% of time

for forecasting and

improvement planning for

next month

Site

Site Docket

Equipment

Details

Pre-Start

Checks

Safety

Reminders

Remediation

Actions

Signature

Docket #

Date

Start, End &

Break Time

Allocation of

Work Performed

Cost/Rate

Adjustments

Client Approval

Steering while looking backwardsWhat just happened?

Action distance

Time

Valu

e

Action distance

Datastored

Informationdelivered

Actiontaken

Project event

Docket transformation case study

130,000paper dockets per year

95% of dockets are

electronically generated by the

workforce, saving 110,000 paper

dockets per year and reducing

administrator head count by

8 people$250M p.a. recurring

sustaining gas infrastructure

Docket transformation case study

“With electronic timesheets, you

can reliably use the data

the day after it’s

entered.

The old approach meant you could

be making decisions on half the

data – meaning poor decisions.”

Ernie Downes

Project Controls Manager

“One of the biggest issues with our

industry is poor planning. This takes a

task that doesn’t require any planning

away from the supervisor so they can

really plan the day

… that planning time is

priceless for understanding the job

and from a safety and quality

perspective.”

Damian Percy

Project Director

Daily 30 - 60 mins extra engineering time

Site DataWork

Progress

Cost

Decision

Action

Decision making

Invoices

1x per subcontractor

Reporting & Forecast

Production Tracking Sheets

Data growth and complexitySite

Dockets

1x per day1x per subcontractor

Accruals

Docket Registers

…(1 p

er

wo

rk a

rea

)

(1x per work discipline)

(1x per code code)

(1x spreadsheet per subcontractor)

Reconciliation

Corporate

Systems

Batman Echolocation

Data capture is already happening

Data Driven Decisions

I’M JUST COLLECTING THE SITE PROGRESS SPREADSHEETS FROM THE ENGINEERS

Construction data

• Better projects outcomes require better decisions

• Better decisions require better information (accurate & timely)

• Construction data is an asset – technology unlocks the value

Construction Data

QMCA Breakfast Briefing

Recommended