Business to Motorways of the Sea
ITS for Ports and Transport Communities Document Version: Final Report
Activity 2 Report
Page 2
ABSTRACT
DISCLAIMER
"The sole responsibility of this publication lies with the author. The European Union is not
responsible for any use that may be made of the information contained therein."
AUTHORS:
WITH CONTRIBUTIONS FROM:
VERSION HISTORY
Date Document Version Document Revision
History
Document
Author/Reviser
29 October 2015 1.0 Final
APPROVALS
Date Document Version Document Approved by
Activity 2 Report
Page 3
TABLE OF CONTENTS
ABSTRACT ................................................................................................................................................................. 2
DISCLAIMER .............................................................................................................................................................. 2
AUTHORS: .................................................................................................................................................................. 2
WITH CONTRIBUTIONS FROM: ............................................................................................................................... 2
VERSION HISTORY .................................................................................................................................................... 2
APPROVALS ............................................................................................................................................................... 2
TABLE OF CONTENTS ............................................................................................................................................... 3
INDEX OF TABLES ..................................................................................................................................................... 5
INDEX OF GRAPHS AND FIGURES ............................................................................................................................ 5
GLOSSARY OF ABBREVIATIONS .............................................................................................................................. 5
GLOSSARY OF TERMS ............................................................................................................................................... 6
1 INTRODUCTION ................................................................................................................................................... 6
1.1 OBJECTIVE OF THE INITIATIVE......................................................................................... 6
2 REPORT FOR THE PROTOTYPE AND PILOT “BPMN FOR ITS INTEGRATED APPLICATION IN PORT AREA”
– PARTNER(S) RESPONSIBLE FOR THIS REPORT: “AUTORITA’ PORTUALE DI LIVORNO” ............................... 7
2.1 INTRODUCTION: main problem identified at the beginning of the project ................. 7
2.2 MAIN OBJECTIVE OF THE PROTOTYPE ............................................................................ 7
2.3 SCOPE OF THE PILOTs ........................................................................................................ 8
2.4 TECHNICal description of the PROTOTYPE and pilots carried out ............................... 8
2.5 LIST OF USERS AND ROLE OF USERS INVOLVED IN THE TESTS AND PILOTS ............ 11
2.6 TESTS RESULTS................................................................................................................. 12
2.7 main problems encountered during the tests .............................................................. 12
2.8 further work necessary for the implementation of the prototype ............................. 12
Activity 2 Report
Page 4
3 REPORT FOR THE PROTOTYPE AND PILOT “ITS FOR PORTS AND TRANSPORT COMPANIES” –
PARTNER(S) RESPONSIBLE FOR THIS REPORT: “MARITIME CARGO PROCESSING PLC” ............................... 12
3.1 INTRODUCTION: main problem identified at the beginning of the project ............... 12
3.2 MAIN OBJECTIVE OF THE PROTOTYPE .......................................................................... 13
3.3 SCOPE OF THE PILOTs ...................................................................................................... 14
3.4 TECHNICal description of the PROTOTYPE and pilots carried out ............................. 15
3.5 LIST OF USERS AND ROLE OF USERS INVOLVED IN THE TESTS AND PILOTS ............ 18
3.6 TESTS RESULTS................................................................................................................. 19
3.7 main problems encountered during the tests .............................................................. 21
3.8 further work necessary for the implementation of the prototype ............................. 21
3.9 DESTIN8 USER GUIDES FOR DRV, TRX AND INQ ........................................................... 22
4 REPORT FOR THE PROTOTYPE AND PILOT “MOBILE SERVICE FOR ROAD TRANSPORT OPERATORS” –
PARTNER(S) RESPONSIBLE FOR THIS REPORT: “PORT OF BILBAO AUTHORITY (PBA)” .............................. 36
4.1 INTRODUCTION: main problem identified at the beginning of the project ............... 36
4.2 MAIN OBJECTIVE OF THE PROTOTYPE .......................................................................... 37
4.3 SCOPE OF THE PILOTs ...................................................................................................... 37
4.4 TECHNICal description of the PROTOTYPE and pilots carried out ............................. 37
4.5 LIST OF USERS AND ROLE OF USERS INVOLVED IN THE TESTS AND PILOTS ............ 40
4.6 TESTS RESULTS................................................................................................................. 41
4.7 main problems encountered during the tests .............................................................. 41
4.8 further work necessary for the implementation of the prototype ............................. 41
Activity 2 Report
Page 5
INDEX OF TABLES
Table 1. KPI considered
Table 2. CBA results
INDEX OF GRAPHS AND FIGURES
Figure 1. As-Is Bunkering Process
Figure 2. To-Be Bunkering Process
Figure 3. Destin8 Drive (DRV) Dashboard
Figure 4. Destin8 Tracker (TRX)
Figure 5. Destin8 Tracker (TRX) Notification Option (DMS01/02/03)
Figure 6. Destin8 Import Enquiry (IEQ)
Figure 7. Destin8 DRV Pilot Transactions
GLOSSARY OF ABBREVIATIONS
BPMN Business Process Model and Notation
PCS Port Community System – see www.ipcsa.international/pcs
ISL Inter System Link Messages
DFS Detailed Functional Specification
OGA Other Government Agencies
HMRC HM Revenue & Customs - is a non-ministerial department supported
by 2 agencies and public bodies
UKBF UK Border Force is a law enforcement command within the Home
Office, responsible for frontline border control operations at 140 air,
sea and rail ports in the United Kingdom and overseas.
SCPHA Suffolk Coastal Port Health Authority is responsible for enforcement of
Environmental, Public and Animal Health Controls at the Port of
Felixstowe, and also delivers port health functions at a number of other
ports
Activity 2 Report
Page 6
GLOSSARY OF TERMS
Destin8 UK based port community system – see www.mcpplc.com
MCP plc Operator of the Destin8 Port Community System
Directive
2010/65/EU
Directive 2010/65/EU of the European Parliament and of the Council
of 20 October 2010 on reporting formalities for ships arriving in
and/or departing from ports of the Member States and repealing
Directive 2002/7/EC
1 INTRODUCTION
This Activity 2 initiative is intended to facilitate trade and promote the use of MoS by piloting IT
solutions to increase cohesion and facilitate trade with peripheral and ultra-peripheral regions. The
ultimate aim is to increase the overall effectiveness of intra-EU maritime transport and facilitate
trade with ultra-peripheral EU regions and neighbouring countries by removing major obstacles in
the development of MoS.
1.1 OBJECTIVE OF THE INITIATIVE
Intelligent Transport Systems (ITS) are advanced applications aiming to provide innovative services
relating to different modes of transport and traffic management and to enable various users to be
better informed and make safer, more coordinated and "smarter" use of transport networks. ITS
integrate telecommunications, electronics and information technologies in the supply and logistics
chains in order to plan, design, operate, maintain and manage transport systems.
MoS require good connectivity and good connectivity requires good mobile IT systems. Intelligent
Transport Systems (ITS) for port and transport communities is an ideal platform to push notifications
to different port and transport stakeholders for status changes and general mobile access for on-
line modifications and status enquiries.
Activity 2 Report
Page 7
2 REPORT FOR THE PROTOTYPE AND PILOT “BPMN for ITS integrated application in
Port Area” – PARTNER(S) RESPONSIBLE FOR THIS REPORT: “AUTORITA’ PORTUALE
DI LIVORNO”
2.1 INTRODUCTION: MAIN PROBLEM IDENTIFIED AT THE BEGINNING OF THE
PROJECT
The main problem is related to the timing of the public tender, needed to identify the contractor. The
bureaucratic procedures have delay the initial stage related to the prototype implementation.
2.2 MAIN OBJECTIVE OF THE PROTOTYPE
Effectiveness and efficiency of the port nodes' system is the enabling element for the development of
port competitiveness itself. ITS, or intelligent transport system, are widely recognized as a key element
for transport policies, increasing efficiency and capacity of a transport system while reducing congestion
and greenhouse gases emission.
ITS framework policies are very well developed as far as road transport and multi-modal transport are
concerned, whereas ITS architectures in port areas are not developed in the same way.
Port regulators have assisted to the increase of the demand for a higher level of service in port areas,
and, to this aim, they are introducing ITS as a way to increase the productivity of the existing
infrastructure, without modifying it or with minor modifications required. However there's a substantial
lack of details for the characterization of ITS services and the necessary supporting architectures in port
areas. This initiative aims on one hand at defining an ITS standardization in port areas, focusing on well
defined processes, and on the other hand to demonstrate that ITS are the missing link between
operators and Motorways of the seas, with special reference to a complete integration of Port
Community System and proprietary private platforms.
This initiative is aimed at finding new technical possibilities to grant the aforementioned pervasive
integration. Livorno Port is featured by different information technology systems, managing
etherogenous processes. Each system gathers and processes a lot of information, in order to reach
specific purposes (depending on the processes managed). In the proposed prototype systems are
considered as players and they are simplified below:
Tuscan Port Community System (TPCS). Livorno Port Community system.
AIDA. Computerized system of customs agency.
HACPACK. Software for the management of dangerous goods.
Activity 2 Report
Page 8
PORT MANAGEMENT INFORMATION SYSTEM. System of the Harbour Master related to
Maritime Traffic system, Administration procedures, and ship registry.
UIRNet. National Logistics platform of UIRNet S.p.a.
PIL. “Piattaforma Integrata per la logistica”, a railway platform managed by Gruppo FS
italiane.
MEDITRACKNET. A tracking platform based on RFID UHF technology.
PRIVATELY OWNED SYSTEMS.
The objective of the prototype is to understand and describe the main features and the
interactions between processes carried out in the Port of Livorno, using different systems such
as TPCS, System related to Dangerous Goods management, AIDA and other applications,
including those related to ship processes. The idea is to use a specific modelling tool, in order
to identify “as-is processes” and define the “to-be scenario”, characterized by some
improvements (that will be assessed).
2.3 SCOPE OF THE PILOTS
The scope of the pilot is to create a Business Process Modeling (from now on, BPMN) displaying key
elements related to Information Technology systems involved in the Port Area. An “As-is” scenario is
identified and it represents the current context. Starting from the “As-is” analysis, specific and relevant
processes have been identified, in order to develop a cost-benefits assessment.
The cost-benefits assessment is useful in order to create possible process reengineering in a “To-Be”
perspective. The final objectives of the prototype are listed below:
1. Improvement of key processes efficiency and efficacy.
2. Definition of Standardized Model related to Port Processes.
2.4 TECHNICAL DESCRIPTION OF THE PROTOTYPE AND PILOTS CARRIED OUT
Starting from the current ITS scenario of Livorno Port 3 relevant processes have been identified in
order to develop the aforementioned analysis. The processes identified are:
1. Bunkering process. This process is identified as “operations of both fuels and lube oils for
ships in the foreport or within the harbour”. The bunkering process has to be analysed from
request for the bunkering till service ends. The process is related both to the Maritime
service refuelling and Land service refuelling.
Activity 2 Report
Page 9
2. Waste process. The waste process is considered as “set of procedures related to statement
on waste on board. The following items can be referred to this service: list of waste disposal
statement, statements’ magement and approval of dispatched statements.” This process has
to be analysed from the the dipstach of the waste statement till waste disposal operations
is completed.
3. Dangerous goods. Dangerous good means all goods, including packaging, waste and
component part thereof, which, due to their specific features, could damage people,
animals, properties and environment.
This process has to analyse:
Cargo Load Units arrival, on board, containing dangerous goods (from the very early
dispatch)
The unloading of dangeros goods
Possible transhipment operations
Loading of dangerous goods.
The prototype is divided into three different steps, as defined below:
A. AS-IS scenario. This scenario considers all processes involved in the systems
aforementioned. For each system, a matrix with public and/or private users and related
phases is developed.
B. TO-BE scenario. This scenario is realized considering in particular bunkering, waste and
dangerous goods processes. Starting from these processes, the idea is to create a
standardized procedure for definining Harmonized Models (procedures, tools, and
parameters used) useful to Port Processes Reenginering. Process Reenginering could make the
process more optimized, considering some Key Perfomance Indicators (they aim at
identifying the critical performance of the processes considered).
Type KPI
Service Expected Operational Time of the process. Operation Lead time (from the
beginning to the finalisation).
Activity 2 Report
Page 10
Quality Score related to the single customer satisfaction. Output compliance to
with respect to customers expectations. (For instance, % complaints
percentage, number of unsatisfied operators
Efficiency Costs borne for resources deplyoment (material, immaterial and human)
for each process. Taking into consideration one single timeframe, this
indicator is measured adding costs for each resource per time unit.
Quality Reliability measurement of the process. In this specific framework,
reliability has to be calculated taking into account both:
a) level of satisfaction of operator/operators for whom the service is
provided,
b) security
Quantity Number of goods/ handled vehicles for each operator/terminal
Table 1. KPI considered
A BPMN is used to show the results of this analysis, as in the example below:
Figure 1. As-Is Bunkering Process
Activity 2 Report
Page 11
Figure 2. To-Be Bunkering Process
C. Costs-Benefits Assessment. The step no. 3 consists of a “natural language” representation
of the results obtained in the previous steps. The idea is to compare the as-is and to-be
scenario proposed.
SCENARIO KPI 1 KPI 2 COST
Current process (As-Is)
Strategic Objectives (To-Be)
Gap
Table 2. CBA results
2.5 LIST OF USERS AND ROLE OF USERS INVOLVED IN THE TESTS AND PILOTS
The optimization of the processes (through the reengineering procedures) creates benefits for the
Port community, in particular for the players involved in the bunkering, waste and dangerous good
processes.
Activity 2 Report
Page 12
The realization of the prototype involves not only Autorità Portuale di Livorno, but also all actors
implicated in the processes and consequently in the systems (i.e. harbour masters, stevedores,
other operators). The players are involved through interviews.
2.6 TESTS RESULTS
The prototype consists of a BPMN realization; presently, no results related to the prototype have to
be reported because the “Cost-benefits” analysis (CBA enables to display the real results related to
the prototype) has to be already done.
However, the results will be intangible because the main objective is to provide a harmonized
business process model used by the Port Community. In this perspective, considering the KPI
aforementioned (or adding other) each port actor (public or private):
could analyse or improve their current process,
could better manage resources (i.e. data and human resources),
could reduce missing links between systems (and other actors)
could reduce data redoundance (and errors) thanks to an optimized information flow.
2.7 MAIN PROBLEMS ENCOUNTERED DURING THE TESTS
In consistence with the previous section, no problems have been identified.
2.8 FURTHER WORK NECESSARY FOR THE IMPLEMENTATION OF THE PROTOTYPE
For the real implementation of the prototype, the “To-Be” and CBA analysis have to be realized. The
CBA will be realized by the end of November.
3 REPORT FOR THE PROTOTYPE AND PILOT “ITS for Ports and Transport Companies”
– PARTNER(S) RESPONSIBLE FOR THIS REPORT: “MARITIME CARGO PROCESSING
PLC”
3.1 INTRODUCTION: MAIN PROBLEM IDENTIFIED AT THE BEGINNING OF THE
PROJECT
One of the key topics at the outset was to identify and target those functions and technologies
providing efficient and improved access to real-time data being of direct benefit to logistics
Activity 2 Report
Page 13
operators as well as the downstream supply chain. Through in-house industry knowledge and
extended customer consultation, the following potential prototype solutions were selected:
DES-5606 - B2MoS A2 i8 - Destin8 notification service prototype/trial
DES-5677 - B2MoS A2 i8 - INQ Import Enquiry Redesign
DES-5680 - B2MoS A2 i8 - Prototype DRV - Destin8 Drive (Haulier Specific Screen)
DES-3363 - B2MoS A2 i8 - Prototype Destin8 phone App
DES-5927 - B2MoS A2 i8 - Prototype ERU add option to release by ISO type
DES-5902 - B2MoS A2 i8 - Prototype TPU/MFA/INQ/TNQ - include Intended On-Carriage Option
DES-5901 - B2MoS A2 i8 - Prototype TRC/TRX Destin8 Notifications
DES-5923 - B2MoS A2 i8 - Prototype VRG/VNU/VAM Import and Export Voyage Number and Repeat
port call
3.2 MAIN OBJECTIVE OF THE PROTOTYPE
Although the A2 i8 initiative, from a MCP perspective, included 8 different prototypes and pilots,
this report focus on three core prototypes that were ultimately decided as providing broader
benefits to other port community stakeholders.
DES-5680 - B2MoS A2 i8 - Prototype DRV - Destin8 Drive (Haulier Specific Screen) - to create a
module with enhanced display options incorporating all of the data and resources required by
hauliers in a concise functional format. Effectively a one-stop-shop facility using existing port
community system real-time information to support SME based logistics operators in their daily
transport planning.
DES-5901 - B2MoS A2 i8 - Prototype TRC/TRX Destin8 Notifications - introducing changes to the way
operators can track consignments in Destin8. New and more intuitive prototype enhancements now
assist the end-user track business critical status changes on a consignment via email notifications,
in real-time.
DES-5677 - B2MoS A2 i8 – INQ/IEQ Import Enquiry Redesign – introducing changes to the way
operators can search for and view import consignment records. New and more intuitive prototype
Activity 2 Report
Page 14
enhancements have been applied to assist the end-user with the navigation, display and retention
of frequently used search criteria.
Detailed information on the other prototype/pilot development have been included in section 2.4
where applicable
3.3 SCOPE OF THE PILOTS
Proof of concept e.g. the identified prototypes providing extended or stand-alone support options
for the provision of real-time information exchange in support of other tasks or the execution of
related functional transactions either without affecting or complementary to the provision of other
services in the port environment.
Furthermore, and if successful, these prototype solutions may be integrated into the Destin8
infrastructure framework and any other system or process with which they potentially relate to; to
test, where possible, the prototypes include all the functionality enabling them to be successfully
demonstrated during the pilot phase before a potential full deployment after the conclusion of the
B2MoS project in 2015.
Activity 2 Report
Page 15
3.4 TECHNICAL DESCRIPTION OF THE PROTOTYPE AND PILOTS CARRIED OUT
DES-5680 - Prototype Destin8 Drive - this fully integrated module; designed specifically for the
haulage sector, provides a haulier-centric view of relevant information and real-time events from
within the Destin8 database. Drive is available to every Haulier who subscribes to Destin8. Haulage
companies are able to complete all functions required from the Drive Transaction without having to
leave the screen i.e. release a consignment to a Vehicle Registration / PIN / Haulier ID, the operator
can click on the release indicator and a simplified RAM Release window will appear. If there is a
need to check the number of packages within a consignment, a simple click on the Unit Id invokes a
simplified Import Enquiry window will appear with the consignment details.
Fig. 3 – Destin8 Drive (DRV) Dashboard
Activity 2 Report
Page 16
DES-5901 - TRX – introduces a prototype version of Tracker (TRC) that includes optional selection of
email notification of status changes to unitised consignments. Where selected, notifications will
automatically be sent to the designated email address whenever a status change (Landed, Loaded,
Cleared, Released, Arrived or Departed the Terminal) occurs against an Import, Export or
Transhipment consignment.
Fig. 4 – Destin8 Tracker (TRX)
Fig. 5 – Destin8 Tracker (TRX) Notification Option (DMS01/02/03)
Activity 2 Report
Page 17
DES-5677 - Prototype Import Enquiry Redesign (IEQ) – major changes have been made to the way
users can search for and view import records.
Fig. 6 – Destin8 Import Enquiry (IEQ)
A copy of the widely distributed user guides for Destin8 transactions DRV, TRX and IEQ have been
appended in Section 4 of this High Level Specification.
The following is a brief outline description of the other prototypes developed and released as part
of the wider A2 i8 pilot carried out at Destin8 locations during 2015:
DES-5606 - Destin8 notification service prototype/trial and Prototype Destin8 Tracker Notifications
– this initial prototype service was developed to allow customers to select from Customs Status,
Port Health and/or Local Holds status by device i.e. SMS or email. Following successful completion,
the prototype was superseded by a more cost effective option of selecting dynamic outputs (DMS01,
DMS02, and DMS03) from within the new prototype tracker transaction (TRX) detailed above.
DES-5927 - Prototype Empty Equipment Release by ISO type - additional functionality has been
added to the Export Release Update (ERU) function with an option to release X number of units by
ISO type through a notification to the wharfinger/terminal operator and releasee where applicable.
This intended release will not be applied against any actual empty stock UCN/Unit id - it is only a
Activity 2 Report
Page 18
notification to the wharfinger who will subsequently select units by stack availability at the time of
collection and then outgate accordingly.
DES-5902 - Prototype On-Carriage Option on intended transhipments and/or rail/barge movements
- the Transhipment Port Update (TPU) function was modified to cater for an optional wharfinger
notification of intended UK/EU on-carriage for transhipments (Transhipment type RTX in free
circulation only) and/or UK rail movements where the terminal has agreed to this. The intended RTX
transhipment option uses 5a UNLocodes whereas the intended rail move use pre-defined 5a Rail
Depot codes (available in TVW). Outputs to wharfingers/terminal operators have been applied to
the manifest create/amendment messages where additional fields have been added to the end of
the manifest create and amendment (ISL) messages respectively.
DES-5923 - Prototype Vessel Voyage Number and Repeat port call functions - VRG/VNU/VAM - in
order to avoid potential Terminal rejection of vessel registrations the lead agents import and export
voyage number must now be unique for the port of call, repeated use of a voyage number at the
working port will no longer be permitted. Feeder services or other vessels calling at two or more
Destin8 ports as part of a single voyage can however be registered with the same voyage numbers
in those ports. As part of this change, we have also extended the Repeat Details option in VRG by
adding a Working Port drop down facility, which, if used, will repeat the vessel characteristics and
other elements of a previous call at the working port as opposed to the last registered vessel/voyage
call in any Destin8 port.
3.5 LIST OF USERS AND ROLE OF USERS INVOLVED IN THE TESTS AND PILOTS
Destin8 Drive (DRV) Test Companies:
Hauliers: Searon Logistics Ltd, Hemisphere Freight Services Ltd, Logistics Planning Services Ltd,
James Kemball Haulage Contractors Ltd, 3rd Party Logistics Ltd, Coggins Haulage Ltd, Port Express
Ltd, Wincanton Container Logistics, Maritime Transport, Multimodal Logistics.
Destin8 Tracker (TRX) Test Companies: A significant number of non-Desti8 customers e.g. importers,
exporters, and other inland operators have expressed interest in using the tracker and notification
functions as a stand-alone module.
Destin8 Import Enquiry (IEQ) Test Companies:
Customs and OGAs: Environment Agency, Animal & Plant Health Agency, Bedfordshire Police
Corporation Of London, Forestry Commission, Mersey Port Health Authority, Office of the Police &
Activity 2 Report
Page 19
Crime, River Tees Port Health Authority, South Tyneside Council, Suffolk CC Trading Standards and
Suffolk Coastal Port Health Authority.
Ports and Terminal Operators: Clydeport Operations Ltd, Forth Ports Limited, North Tyneside Port,
PD Teesport, Port Of Tilbury London Ltd, The Bristol Port Company.
Shipping lines & Agents: K Line(Europe) Ltd, Maersk Company Ltd, Mediterranean Shipping Co (UK)
Ltd, ICL Agencies UK Ltd, Containerships (UK) Ltd and China Shipping (UK) Agency Co Ltd.
Freight Forwarders: Advanced Forwarding Ltd, Allport Cargo Services Limited, Aramex (UK) Limited,
Asia Freight Solutions Ltd, CML Ltd, Damco, EUF (Felixstowe) Ltd, Expeditors International UK Ltd,
GP Global Logistics Limited, Hine Freight Services Ltd, Interfreight UK Ltd, John Good & Sons (GCB)
Ltd, Karl King Transport Ltd, Kuehne & Nagel Ltd, KWL Logistics Ltd, Newell & Wright ,Octain Ltd,
Pentalver Transport Limited, R Bugg Trading Ltd, Seabourne Forwarding Ltd, Seaport Freight
Services Ltd, Velta International Ltd and WS Logistics Ltd.
3.6 TESTS RESULTS
Destin8 Drive (DRV) Pilot Company Feedback:
The purpose of obtaining initial feedback during the trial implementation was primarily to ensure
the transaction delivered what it was designed to do. This was to offer a complete and rounded
resource to the Destin8 haulier community, while also gauging system response and performance
during the pilot period.
The feedback we have received has provided confidence in the
assumptions we made during development and further solutions
and enhancements have been drawn from this feedback in
preparation for wider deployment. Consideration should be given to
the fact that once you enter this transaction, you need not logout
due to the background auto refresh, therefore 36178 hits during
initial implementation meets expectation.
Use of the DRV transaction progressively rises (adjacent graphic
quantifies over an 8 month period the number of hits).
Fig. 7 – Destin8 DRV Pilot Transactions
Activity 2 Report
Page 20
Typical findings and average response to a qualitative customer survey included:
Feedback indicates that the overall system performance of the Transaction is ‘Very Good’.
The trial was mainly carried out using both IE 8/9 and Google Chrome 39/46.
The majority of the piloting companies have been using the DMS notification function.
They prefer these notifications in email form and do not see the need for an SMS format of
the notifications.
Companies are utilising the Pre-Exec column to check the status via the indicator. However,
they are not entering their Haulier Code in the field provided. Responses as to why they are
choosing not to do has highlights that they are unsure of the benefits.
In addition, common themes were found when the piloting companies listed their initial ‘Pros and
Cons’.
The most common of these were the opinion that DRV is ‘quick and easy to use’ and users
found the traffic light indicators to be a clear and a concise way of displaying statuses. Users
noted that the particular layout of the screen gives clear visibility across each of their
consignments.
“We do really like the idea of having all of our information in one screen” Andy Lewis –
Transport Manager, James Kemball Road Haulage Contractors Limited.
“For us, it’s just the quick access to pertinent information” Darren Walne – General Manager,
Searon Logistics Ltd.
“Can I just say the new functionality of DRV is absolutely amazing, thank you” Mark Lyons -
Key Account Manager, Wincanton.
“That is magical. Thank you!!! Didn't think it could get better but you pulled it out the bag”
Mark Lyons - Key Account Manager, Wincanton. (in a separate response to a question
Dangerous Goods visibility)
From analysing the response, we have been able draw together an improvements JIRA which, where
practical and scalable, have been included. A few points, such as column filtering and hazardous
implications were dealt with during onward training.
Activity 2 Report
Page 21
The Destin8 Import Enquiry (IEQ) and Destin8 Tracker (TRX) user feedback were tested throughout
the B2MoS Demonstration Days and Training Seminars undertaken as part of Activity 4. These took
place as follows:
Leicester: 20 October: Number of attendees: 11 (The area concerned is a very large inland
distribution hub). Felixstowe Port: 19 October: Number of Attendees: 9. Birmingham: 30
September: Number of Attendees: 10. Liverpool: 15 October: Number of Attendees: 29 (two
sessions). Bristol: 01 October: Number of Attendees: 9. Grangemouth: 06 October: Number of
Attendees: 9. Port of Tyne: 07 October: Number of Attendees: 6. Tilbury: 13 October: Number of
Attendees: 16. Glasgow (Grangemouth/Greenock Ports): 28 October: Number of Attendees: 28,
Felixstowe: 30 October: Number of Attendees: 15
All the activities detailed above were presented and were very well received, although we often had
more interaction from smaller audiences than larger ones. As part of Activity 4, the B2MoS Survey
Monkey link was distributed by e-mail to a nominated person at each company following the
presentations.
3.7 MAIN PROBLEMS ENCOUNTERED DURING THE TESTS
Other than some minor data quality issues, no other significant problems were encountered during
the pilots of this initiative.
3.8 FURTHER WORK NECESSARY FOR THE IMPLEMENTATION OF THE PROTOTYPE
Following further consultation with a range of stakeholders a number of enhancements have been
collated which, where practical and scalable, will be developed during 2016.
With the exception of DES-5606, which has been superseded, all seven pilots as described in this
high-level report will continue to be available, as prototype functionality and our pilot period have
already been extended until the end of December 2015. We remain confident that all of them will
be made a permanent feature within the Destin8 production system once the B2MoS project has
been completed.
Activity 2 Report
Page 36
4 REPORT FOR THE PROTOTYPE AND PILOT “MOBILE SERVICE FOR ROAD TRANSPORT
OPERATORS” – PARTNER(S) RESPONSIBLE FOR THIS REPORT: “Port of Bilbao
Authority (PBA)”
4.1 INTRODUCTION: MAIN PROBLEM IDENTIFIED AT THE BEGINNING OF THE
PROJECT
e-puertobilbao is an electronic commerce platform whose aim is to maximize communications and
facilitate interaction among the different companies in the Bilbao maritime-port community. Its
fundamental goal is to achieve greater speed and efficiency in the passage of vessels and goods
through the Port, in such a way that companies and Port as a whole will be more competitive. More
than 300 companies are currently using e-puertobilbao services, among them, Ship Agents, Terminal
Operators, Customs Agents, Forwarders, Customs authorities, Port Authority, Inspection Services
(Health, Veterinary…), Road Transport operators and Rail Transport Operators Companies (160
companies).
In this Activity 2 the aim is to facilitate to mobile users of e-puertobilbao with an access to specific
services throught mobile applications. Mainly for Road Transport Companies operating in the Port
of Bilbao. In other words, how to address the transition from e-services to m-services. In the case of
road transport operators there are some facilities/services we have to provide them mobile
otherwise they will not be able to fulfil/use.
The pre-entry notification to port/terminals in the Port of Bilbao is being implemented since
beginning of 2014. Most of Container cargo related road transport operators are sending the
information from their offices. From traffic control department or from traffic managers.
However, due to the variety of road transport companies, we have identified specific service
requirements for companies working in a different way. Main tool for these companies are smart
phones and they work on demand basis, last minute transport orders and so on.
For them, it is important to send the pre-entry information from a mobile device and to check if the
cargo is released and it is ready for transportation or has been accepted in the terminals for
embarkment.
Activity 2 Report
Page 37
4.2 MAIN OBJECTIVE OF THE PROTOTYPE
The aim is to build a prototype and running a pilot for a range of new specific mobile services or
upgrading of some available services for mobile customers of the Port. It is intended that these
prototypes will only be partial implementations of the full transactions available in e-puertobilbao.
In this prototype we will focuss in the mobile service for pre-entry information to the
Port/Terminals. In short, it will cover the pre-entry requirements for general cargo, contenerized
cargo, dry bulk and liquid bulk.
4.3 SCOPE OF THE PILOTS
The scope will cover all functionalities of the e-service for an android App totally integrated with the
Transport order service and the container release/admittance service. It will include the
requirements for port access control, terminal access control and in the containers case it will be
linked with the release/acceptance information.
4.4 TECHNICAL DESCRIPTION OF THE PROTOTYPE AND PILOTS CARRIED OUT
Service functionalities:
Pre-entry mobile notification
Pre-entry mobile notification from a Release order or from an Acceptance order
Main features
App, first version for android platform (80% market share)
Second version iOS platform
Online and offline capabilities
User/password validation
Authentication
Activity 2 Report
Page 40
4.5 LIST OF USERS AND ROLE OF USERS INVOLVED IN THE TESTS AND PILOTS
The companies participating in the test and pilots are:
CECOTRANS BIZ / Road Transport Operator
Activity 2 Report
Page 41
TPS / Road Transport Operator
PBA-e-puertobilbao / Port of Bilbao Authority Security Division / PCS
NCTB / Container Terminal
4.6 TESTS RESULTS
By sending the pre-entry information they will be able to use the fast line access to the port and to
the terminals. That is to say, they wil have benefits as:
• Avoid queueing, reduction of waiting times
• Better management of port facilities
• Safer port area
• Optimization of port operations
So far we are in an initial testing phase, therefore we have still not data about time and cost saved.
We have a special entry line for those trucks with pre-entry information but still we have not got
the same in the container terminal. They are saving time at the gate control mainly because all the
information needed is being provided but still is not quantified.
4.7 MAIN PROBLEMS ENCOUNTERED DURING THE TESTS
Main problems encountered were the usability of the App, the lack of quality of information,
training, integration of information flows between the PCS and the Container Terminal.
4.8 FURTHER WORK NECESSARY FOR THE IMPLEMENTATION OF THE PROTOTYPE
The prototype is very close to the final solution. The aim is to develop the same App for Ios platform
with the same functionalities, data model and so on. Besides that there will be a need for a better
physical lay out of the container terminal gates in order to have a specific fast lane but this is out of
the scope of the project.
Recommended