View
2
Download
0
Category
Preview:
Citation preview
i
STRIVING FOR EXCELLENCE AND PEACE OF MIND IN STEEL CONSTRUCTION SINCE 1987
BUILDING RELATIONSHIPS
THROUGH STEELWORK
1
PROJECT TEAM
Client: Pareto Limited
Project Manager: Origin Project
Managers
Architect: BILD Architects
Engineer: Aurecon
Quantity Surveyors: BTKM Quantity
Surveyors
Main Contractor: Murray & Roberts
Steel Contractor: IMBANI/ CADCON
Steel Detailer: Lavula
Tonnage / Estimated Value: >3 500 tons /
R125 Million
Project Information / Year: 2015-2017
2
The CADCON Story
5
Accreditations and Capability Matrix
7
Architectural Projects
13
Commercial Projects
33
Civil, Road and Bridge Projects
39
Industrial and Manufacturing Projects
49
Mining Projects
55
Stadium and Sports Complex Projects
59
Government and Educational Projects
63
Sheeting and Cladding Projects
67
Export Projects
71
Social Development
75
Awards
Contents
2
Barry Barnard, a former Iscor employee, at
the time studying mechanical engineering
with Gerhard Meiring afterhours, joined
CADCOR. Performing small steelworks and
sundry metalworks, their business moved into
a larger rental premises in Waltloo, Pretoria
(1 000m2 workshop). Turnover of R1m – R2m
per annum.
Richard Butler, working as a student QS
at Schoombie Hartmann meets Gerhard
Meiring on CADCOR 1st major project, BMW
Paintshop build in Rosslyn.
1st project secured by
Richard Butler as QS, the
“Welcome to South Africa”
boards on the Border Posts
of Namibia, Botswana,
Swaziland, Mozambique
and Lesotho. Project value
R2.4m with Department of
Public Works South Africa.
1987 1989 1995 1996 1997 1997
Established CADCOR as Close Corporation –
founded by mechanical engineering student
Gerhard Meiring on a plot in a garage
outside Pretoria (Lynnwood).
Purchased industrial property in Lyttelton
Centurion, well located between Pretoria and
Johannesburg. Construct 1st workshop and
office facility, current Workshop A (2 100m2
with 4 overhead cranes). Turnover of R2m –
R3m per annum.
Richard Butler (passionate about steelwork,
working afterhours making steel furniture from
his parents garage) joined CADCOR to run
the tender and costing department looking to
expand.
Gerhard Meiring, founding member, left
CADCOR after deciding to emigrate to
Australia.
The CADCON Story
Workshops B and D
Richard Butler and
Barry Barnard –
National Annual Overall
Steel Awards Winner
2018.
3
Established from humble beginnings in 1987 on a plot outside
Pretoria, CADCON (Pty) Ltd is a privately-owned, reputable steel
construction and engineering company which specializes in structural
steelwork solutions in all sectors of the construction and engineering
industries.
With an impressive track record spanning over 30 years, CADCON
has steadily grown their steel and engineering business through
establishing and maintaining good business relationships. Their
commitment to excellence and professionalism has secured ongoing
work in the South African construction industry, as well as export
projects to neighbouring African countries, Europe and Mauritius.
CADCON has proved itself as an expert in structural steelwork for:
•Architecturalprojects
•Commercialprojects- Airports
- Distribution and Logistic Facilities
- Workshop Facilities
- Entertainment
- Corporate Buildings
- Shopping Center and Retail Developments
•Civils,RoadsandBridges
•IndustrialandManufacturingprojects
•MiningProjects
•StadiaandSportComplexes
•GovernmentandEducational
•SheetingandCladding
•ExportProjects
CADCON has 15 100m2 of undercover workshop facilities serviced
by 25 No overhead cranes and deliver excellent workmanship on
all structural and platework products through Quality Standards
maintainedthroughISO9001:2008accreditationandISO3834welding standards. Final finish of steelwork is done at their own
blasting and painting facility covering in excess of 10 000m2.
In2011,inanefforttoadvanceeconomictransformation,CADCONconcludedanempowermentdealinvolving46%ofitsshareholding.This further re-inforced our commitment towards BEE empowerment
milestones. CADCON empower their workforce with expertise, skills
and leadership through management leading by example, providing
a safe working environment and good working relationships.
CADCON has also managed to contain company overheads for
client cost advantages. Our dedicated office staff and satisfied labour
workforce are always willing to put in the extra hours when needed to
expedite projects for clients.
CADCON has earned a reputation for prizing respect and loyalty
in the construction industry by delivering cost-effective solutions,
on-time and going the extra mile for contractors, engineers and
clientsinordertodeliveraqualityproduct.Inanyprojectittakeson,CADCON makes a point of living its maxim “Building relationships
through steelwork”.
After BMW Paintshop experience, awarded
700 ton Mercedes Benz Paintshop in East
London, paving the way for CADCOR and
building on this a formidable CV. Turnover in
2 years up to R15m.
Richard Butler moved to East London for
2 years during Mercedes expansion, while
Barry Barnard managed the Lyttelton works.
Terminated lease at Iscor and consolidated
into self-constructed 2nd Workshop B in
Lyttelton (Workshop B 3 600m2 with 6
overhead cranes).
1998 1999 1999 - 2000 2000 2000 - 2002 2003
Johan Jonker, former Head Structural Engineer
of DLV Engineers, left the consulting engineering
sector to add his experience by joining as the
3rd partner of CADCOR.
Name change initiated through process of
changing from Close Corporation to Pty (Ltd).
CADCOR cc. becomes CADCON (Pty) Ltd.
Increased Lyttelton Shop A workshop capacity
by renting additional Presco Iscor Facility
Pretoria West as 2nd workshop Facility.
Workshops A and C
MISSION: “BUILDING RELATIONSHIPS THROUGH STEELWORK”
4
Implemented workshop and site management
system – FABTROL.
Invested in workshop automation through
FICEP CNC plate cutting (plasma and gas up
to 100mm thick), FICEP CNC 3-axis Beamline,
FICEP CNC angleline, FICEP CNC 22m in-line
cutting facility.
ISO 9001-2008 Accredited and ISO 3834
Welding.
CADCON entered into a 46% BEE
empowerment deal through Investec.
CADCON management
consolidate with 60%
shareholding and 40%
empowerment shareholding
in CADCON.
30 Year Anniversary.
2006-2008 2008 2009-2010 2011 2015 2017-2018
Expanded into 3rd workshop facility
Workshop C when Medupi ACC steelwork
in JV with A. Leita and Boksan awarded –
26 000 tons in JV (Workshop C 5 200m2 with
10 overhead cranes).
Expanded into 4th workshop facility,
Workshop D when Medupi Ducting
steelwork awarded (Workshop D 4 200m2
with 6 overhead cranes).
Johan Jonker, design engineer retired as
shareholder/Director.
Over the years CADCON has received recognition in the Steel
IndustrythroughSteelAwardsforprojectscompletedwithexcellence including:
•SteelAwards2010CategoryWinnerTubular–MbombelaStadium 2010 in JV with A. Leita Steel
•SteelAwards2011OverallWinner–ProteaCourtRoofinJVwithTass Engineering
•SteelAwards2013CategoryCommendationMiningandIndustrial–IllovoDistributionWarehouseinJVwithA.LeitaSteel
•SteelAwards2015CategoryWinnerMiningandIndustrial–Medupi Air Cooled Condenser in JV with A. Leita and Boksan
Projects
•SteelAwards2016CategoryWinnerMetalCladding–StatisticsSA Head Office
•SteelAwards2017CategoryWinnerMetalCladding–KasaneAirport
•SteelAwards2017CategoryWinnerArchitectural–MenlynTimeSquareDevelopment,GlobeBar/CasinoArch
•SteelAwards2017CategoryWinnerTubular–MenlynTimeSquareDevelopment,GlobeBar/CasinoArch
•SteelAwards2018OverallWinner–TimeSquareSunArena
•SteelAwards2018CategoryWinnerTubular–TimeSquareSunArena
•SteelAwards2018CategoryWinnerCommercial–TimeSquareSun Arena
The CADCON family and staff at the 2018 Annual Steel Awards Ceremony.
5
Accreditations and Capability Matrix
Speciality/Expertise:
•TurnkeyDesignandSupplyfacility
•ProjectandStructureManagementusingFABTROL
•3DModellingandDetailDraughtinginTEKLA
•Supply,FabricateandErectionofStructuralsteelwork
•Supply,FabricateandErectionofPlatework
•BlastingandPaintingFacilities
Demographic area of operation:
•OperateinSouthAfrica,neighbouringAfrican countries, and internationally.
CAPABILITY MATRIX
ISO9001:2008–QualityManagementSystem
InternationalInstituteof WeldingSANSISO3834
Part 3 Steelwork
Member of the Southern African
InstituteofSteelConstruction (SAISC)
ACCREDITATIONS
6
Menlyn Maine, Time Square Casino Entrance
Steel Awards 2017 Architectural and Tubular Category Winner
7
Architectural Projects
Menlyn Maine, Time Square Casino Entrance
8
ARC
HIT
EC
TURA
L
MENLYN SHOPPING RECONFIGURATION
(PHASE I AND PHASE II)
PROJECT TEAM
Client: Pareto Limited
Project Manager: Origin Project Managers
Architect:BILDArchitects
Engineer: Aurecon
Quantity Surveyor: BTKMQuantitySurveyors
Main Contractor: Murray & Roberts
Steel Contractor:Imbani/CADCON
Steel Detailer: Lavula
Tonnage/Estimated Value:>3500tons/R125Million
Project Information/Year: 2015 - 2017
9
TIME SQUARE CASINO, ARENA AND HOTEL
DEVELOPMENT, MENLYN MAINE
PROJECT TEAM
Client:SunInternational
Project Manager: Proman
Architect: LYT Architects
Engineer:WSPGroup
Quantity Surveyor: MLC Quantity Surveyors
Main Contractor: WBHO
Steel Contractor:Imbani/CADCON
Shop Detailing: Mondo Cane
Tonnage/Estimated Value:>2500tons/R140Million
Project Information/Year:2016-2017
ARC
HIT
EC
TURA
L
The Time Square Arena was the Steel Awards 2018 Overall Winner as well as the winner of both the Tubular and Commercial Categories.
i
10
ARC
HIT
EC
TURA
L
FOUNTAIN CIRCLE REDEVELOPMENT 2010
PROJECT TEAM
Client: Tshwane City Council
Project Manager: Responsive Environmental Design
Landscape Architect: Endemic
Engineer: PDesign
Quantity Surveyor: Tshwane City Council
Main Contractor: Wedge Save Joint Venture
Steel Contractor: CADCON
Shop Detailing: Mondo Cane
Tonnage/Estimated Value:<5ton/R950k
Project Information/Year: 2010
11
TORNADO STRUCTURE EAST RAND MALL
PROJECT TEAM
Client: Redefine & Vukile Property Fund
Project Manager:SIPProjectManagers
Architect: MDS Architecture
Engineer: Sutherland Engineers
Quantity Surveyor: Norval Wentzel Steinberg (NWS)
Main Contractor: NMC
Steel Contractor: CADCON
Shop Detailing: DN Design
Tonnage/Estimated Value: R1.2 Million
Project Information/Year: 2015
ARC
HIT
EC
TURA
L
12
Kasane International Airport Terminal Building, Botswana
Steel Awards 2017 Metal Cladding Category Winner
13
Commercial Projects
Kasane International Airport Terminal Building, Botswana
14
ACSA, CENTRAL TERMINAL BUILDING (CTB),
O.R. TAMBO INTERNATIONAL AIRPORT
PROJECT TEAM
Client: Airports Company South Africa (ACSA)
Project Manager:ARUP/BovellFreemanHolley/DiagonalProjectsJV
Architect:OsmondLangeArchitects/BentelAssociates/SiyakhaArchitects JV
Engineer:Africon/KAYP/Axis/LesileMadingaJV
Quantity Surveyor:DavisLangdonFarrowLaing/BTKM/PentadJV
Main Contractor: CTB JV (WBHO)
Steel Contractor: CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value:>3500tons/R103Million
Project Information/Year: 2007 - 2009
AIR
PO
RT
BU
ILD
ING
S
15
AIR
PO
RT
BU
ILD
ING
S
ACSA INTERNATIONAL PIER DEVELOPMENT,
O.R. TAMBO INTERNATIONAL AIRPORT
PROJECT TEAM
Client: Airports Company South Africa (ACSA)
Project Manager:SIPinAssociationwithSeloane
Architect: Boogertman & Partners
Engineer:BIGENAfrica
Quantity Surveyor: LDM in Association with Abakali
Main Contractor: CONCOR Trencon Stefanutti JV
Steel Contractor: CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value:750tons/R18Million
Project Information/Year:2006-2007
16
AIR
PO
RT
BU
ILD
ING
S
ACSA DOMESTIC TERMINAL,
O.R. TAMBO INTERNATIONAL AIRPORT
PROJECT TEAM
Client: Airports Company South Africa (ACSA)
Project Manager:TTA/DEC
Architect: TPC Architects
Engineer: LC Consulting
Quantity Surveyor: CP de Leeuw
Main Contractor:AirportContractors(Concor/Trencon)
Steel Contractor: CADCON
Steel Detailing: SH Services
Tonnage/Estimated Value:2000tons/R100Million
Project Information/Year: 2000 - 2002
17
DIS
TRIB
UTI
ON
WA
REH
OU
SES
ACKERMANS DISTRIBUTION WAREHOUSE,
HAMMERSDALE, DURBAN
PROJECT TEAM
Client: Steinhoff Property
Developer: Rokwil
Project Manager: Rokwil
Architect: TC Design
Engineer: EDS Engineers
Quantity Surveyor: MHS Consulting
Main Contractor: Abbeydale Building and Civils
Steel Contractor:CADCON/A.LeitaJV
Shop Detailing: Mondo Cane
Tonnage/Estimated Value:2500tons/R75Million
Project Information/Year:2016-2017
Project steelwork of 2 500 tons was erected over a period of 4.5 months.i
18
DIS
TRIB
UTI
ON
WA
REH
OU
SES
Project steelwork of 2 000 tons was erected in a record time of 3 months, erecting the structures from two sides. This production was also made possible through a joint venture with A. Leita Steel Construction.
i
WOOLWORTHS DISTRIBUTION WAREHOUSE,
MIDRAND
PROJECT TEAM
Client: Woolworths
Project Manager: MDSA Project Management
Architect: R&L Architects
Engineer: Aurecon
Quantity Surveyor: Norval Wentzel Steinberg (NWS)
Main Contractor: WBHO
Steel Contractor:CADCON/A.LeitaJV
Tonnage/Estimated Value:>2000tons/R30Million
Project Information/Year:2006
19
DIS
TRIB
UTI
ON
WA
REH
OU
SES
ILLOVO DISTRIBUTION WAREHOUSE,
PIETERMARITZBURG
PROJECT TEAM
Client:Illovo
Developer: Collins Property
Project Manager: TC Design
Architect: TC Design
Engineer: EDS Engineers
Quantity Surveyor: MHS Consulting
Main Contractor: Armstrong Construction
Steel Contractor:CADCON/A.LeitaJV
Steel Detailing: Mondo Cane
Tonnage/Estimated Value:>1850tons/R52Million
Project Information/Year: 2013
20
DIS
TRIB
UTI
ON
WA
REH
OU
SES
KOMATSU DC (PHASE I)
PROJECT TEAM
Client:Investec
Project Manager: Metrum Project Management
Architect:ICMArchitecture
Engineer: Sotiralis Consulting Engineers
Quantity Surveyor: Norval Wentzel Steinberg (NWS)
Main Contractor: Abbeydale Building and Civils
Steel Contractor: CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value:550tons/R18Million
Project Information/Year:2016
21
DIS
TRIB
UTI
ON
WA
REH
OU
SES
ATLAS COPCO – HEAD OFFICE AND
WORKSHOP BUILDINGS
PROJECT TEAM
Client: Abbeydale Building and Civils
Architect:LeonKrugerArchitects
Engineer: EDS Engineers
Quantity Surveyor: Abbeydale Building and Civils
Main Contractor: Abbeydale Building and Civils
Steel Contractor: CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value:>800tons/R21Million
Project Information/Year:2014
22
EN
TERTA
INM
EN
T
MENLYN MAINE TIME SQUARE CASINO, HOTEL
& ARENA DEVELOPMENT
PROJECT TEAM
Client:SunInternational
Project Manager: Pro-man
Architect: LYT Architecture
Engineer:WSPGroup
Quantity Surveyor: MLC Quantity Surveyors
Main Contractor: WBHO
Steel Contractor:Imbani/CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value:2600tons/R150Million
Project Information/Year:2016-2017
Globe Bar
Arena
Hotel
23
CO
RPO
RA
TE B
UIL
DIN
GS
PWC HEAD OFFICE, WATERFALL
PROJECT TEAM
Client: Attacq
Project Manager: LYT Architecture
Architect: LYT Architecture
Engineer: ARUP
Quantity Surveyor: Brian Heineberg & Associates (BHA)
Main Contractor: WBHO
Steel Contractor: CADCON
Steel Detailing:MondoCane/HansSegmuller
Tonnage/Estimated Value:>300tons/R18Million
Project Information/Year: 2015 - 2017
Pho
to c
ourt
esy
of
Aru
p
Pho
to c
ourt
esy
of
Aru
p
24
CO
RPO
RA
TE B
UIL
DIN
GS
ALICE LANE PHASE III, SANDTON
PROJECT TEAM
Client: Abland
Project Manager: Abland
Architect: Paragon Architects
Engineer: L&S Consulting Engineers
Quantity Surveyor: Quanticost Johannesburg
Main Contractor: WBHO
Steel Contractor: CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value: R7.1 Million
Project Information/Year: 2015
25
CO
RPO
RA
TE B
UIL
DIN
GS
90 GRAYSTON OFFICES, SANDTON
PROJECT TEAM
Client: Redefine
Project Manager: Betts Townsend
Architect:GLHArchiects
Engineer: Sutherland Engineers
Quantity Surveyor: MLC Quantity Surveyors
Main Contractor: WBHO
Steel Contractor: CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value: R10 Million
Project Information/Year:2014
26
CO
RPO
RA
TE B
UIL
DIN
GS
SANDTON CITY REPOSITIONING PHASE I –
PROTEA COURT ROOF
PROJECT TEAM
Client:STANLIB
Project Manager:GHCAfrica
Architect: MDS Architecture
Engineer: Aurecon
Quantity Surveyor: MLC Quantity Surveyors
Main Contractor:SJV(AvengGrinaker-LTA/WBHO)
Steel Contractor:Tass/CADCONinJV
Steel Detailing: Tass Engineering
Tonnage/Estimated Value: R7.2m Million
Project Information/Year: 2010
Steel Awards 2011 Overall Winner.i
27
CO
RPO
RA
TE B
UIL
DIN
GS
SANDTON CITY REPOSITIONING PHASE II –
ATRIUM ON 5th
PROJECT TEAM
Client:STANLIB
Project Manager:GHCAfrica
Architect: MDS Architecture
Engineer: Aurecon
Quantity Surveyor:MLC/CraneQuantitySurveyors
Main Contractor:SJV(AvengGrinaker-LTA/WBHO)
Steel Contractor:Imbani/CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value:R6.8Million
Project Information/Year:2014
28
SH
OPPIN
G &
RETA
IL
CEN
TRES
CORNUBIA MALL, UMHLANGA
PROJECT TEAM
Client:Investec
Project Manager:SIPProjectManagers
Architect:BentelAssociatesInternational
Engineer: Pure Consulting
Quantity Surveyor: Brian Heineberg and Associates (BHA)
Main Contractor: WBHO
Steel Contractor: CADCON
Steel Detailing:CADCON/Lavula/HansSegmuller/Isdc
Tonnage/Estimated Value:>1200tons/R55Million
Project Information/Year:2016-2017
Aerial view – August 2017
Aerial view – August 2016
Project steelwork of 1 400 tons (light weight) was erected over a period of 9 months.i
29
SH
OPPIN
G &
RETA
IL
CEN
TRES
Virgin Active
MENLYN SHOPPING RECONFIGURATION
(PHASE I AND PHASE II)
PROJECT TEAM
Client: Pareto Limited
Project Manager: Origin Project Managers
Architect:BILDArchitects
Engineer: Aurecon
Quantity Surveyor:BTKMQuantitySurveyors
Main Contractor: Murray & Roberts
Steel Contractor:Imbani/CADCON
Steel Detailing: Lavula
Tonnage/Estimated Value:>3500tons/R125Million
Project Information/Year: 2015 - 2017
30
SH
OPPIN
G &
RETA
IL
CEN
TRES
MALL OF AFRICA (WEST MAIN ROOF),
WATERFALL MIDRAND
PROJECT TEAM
Client: Attacq
Project Manager:GHCAfricaProjectManagement
Architect: MDS Architects
Engineer: Aurecon
Quantity Surveyor: Norval Wentzel Steinberg (NWS)
Main Contractor:MallofAfricaJV(WBHO/Group5)
Steel Contractor: CADCON
Steel Detailing:MondoCane/Lavula
Tonnage/Estimated Value:450tons/R13.5Million
Project Information/Year:2014-2015
31
SH
OPPIN
G &
RETA
IL
CEN
TRES
MALL OF THE SOUTH, ALBERTON
PROJECT TEAM
Client: Zenprop
Project Manager: WT McClatchey Associates
Architect: Vivid
Engineer: Sotiralis
Quantity Surveyor: MLC Quantity Surveyors
Main Contractor:AvengGrinaker-LTA
Steel Contractor: CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value:>1000tons/R35Million
Project Information/Year:2014-2015
32
N1, Lynnwood Infrastructure and Pedestrian Bridge
33
Civil, Road and Bridge Projects
N1, Lynnwood Infrastructure and Pedestrian Bridge
34
CIV
ILS,
RO
AD
S &
BRID
GES
N1, LYNNWOOD INFRASTRUCTURE AND
PEDESTRIAN BRIDGE
PROJECT TEAM
Client: SANRAL
Project Manager:DCA(DEC/CivilConcepts/ARQJV)
Architect:DCA(DEC/CivilConcepts/ARQJV)
Engineer:DCA(DEC/CivilConcepts/ARQJV)
Quantity Surveyor:DCA(DEC/CivilConcepts/ARQJV)
Main Contractor: BRCD JV
Steel Contractor: CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value:150tons/R10Million
Project Information/Year: 2010
35
CIV
ILS,
RO
AD
S &
BRID
GES
HAZYVIEW PEDESTRIAN BRIDGE
PROJECT TEAM
Client: Twin City
Project Manager: Matla Quantity Surveyor
Architect: Leon Jacobs Architects
Engineer:KBKEngineers
Quantity Surveyor: Matla Quantity Surveyor
Main Contractor:iKotwe
Steel Contractor: CADCON
Steel Detailing: DN Design
Tonnage/Estimated Value: R3.5Million
Project Information/Year:2016
36
SANRAL OPEN ROAD TOLLING FACILITIES (ORT),
GAUTENG FREEWAY IMPROVEMENT PROJECT
PROJECT TEAM
Client: SANRAL
Project Manager, Architect & Quantity Surveyor: Tolplan
Engineer: PDesign
Main Contractor: Trencon Present Perfect JV
Steel Contractor: CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value:>1500tons/R100Million
Project Information/Year: 2010 - 2011
CIV
ILS,
RO
AD
S &
BRID
GES
The project consisted of 84 gantry structures and was erected over a period of 6 month during the GFIP contract.
i
WILLIAM NICOL ROBOT GANTRY
PROJECT TEAM
Client: SANRAL
Project Manager:SSI
Architect: Boogertman and Partners
Engineer: ARQ
Quantity Surveyor:SSI
Main Contractor:GFIJV(WBHO)
Steel Contractor: CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value:22Tons/R1.5Million
Project Information/Year: 2010
37
BOABAB TOLL PLAZA
PROJECT TEAM
Client: SANRAL
Architect: Pieter Mathews and Associates
Engineer: PDesign
Consulting Engineer: Tolplan (Pty) Ltd
Main Contractor: Stefanutti & Bressan
Steel Contractor: CADCON
Tonnage/Estimated Value: R1.2 Million
Project Information/Year: 2003
CIV
ILS,
RO
AD
S &
BRID
GES
38
Medupi Air Cooled Condenser (ACC) Steelwork, Lephalale
Steel Awards 2015 Mining and Industrial Category Winner
39
Industrial and Manufacturing Projects
Medupi Air Cooled Condensor (ACC) Steelwork, Lephalale
40
MEDUPI AIR COOLED CONDENSER (ACC)
STEELWORK
PROJECT TEAM
Client:ESKOM
Project Manager:GEAAirCooledSystems
Architect: PB Power
Engineer:GEAAirCooledSystems
Main Contractor:KENTZ
Quantity Surveyor:KENTZ
Steel Contractor:ABCJV(A.Leita/Boksan/CADCON)
Steel Detailing: Mondo Cane
Tonnage/Estimated Value:>26000tons/R800Million
Project Information/Year: 2009 - 2012
IND
USTR
IAL
CADCON supplied, manufactured, galvanized and delivered 26 000 tons of steelwork over a period of 42 months in Joint Venture with A. Leita and Boksan Projects on the Medupi Power Station Project.
i
41
MEDUPI DUCTING SUPPORTS
PROJECT TEAM
Client:ESKOM
Project Manager:GEAAirCooledSystems
Architect: PB Power
Engineer:GEAAirCooledSystems
Main Contractor:KENTZ
Quantity Surveyor:KENTZ
Main Contractor:KENTZ
Steel Contractor: CADCON
Tonnage/Estimated Value:>1500tons/R70Million
Project Information/Year:2010-2014
IND
USTR
IAL
42
ILANGA SOLAR 100MW, UPINGTON
PROJECT TEAM
Client:DANKOCOM
Project Manager:DANKOCOM
Architect:DANKOCOM
Engineer: SENER
Quantity Surveyor:DANKOCOM
EPC:DANKOCOM
Steel Contractor: CADCON
Steel Detailing:CADCON/MondoCane/HansSegmuller/
GlenBanks/Lavula
Tonnage/Estimated Value:1600tons/R95Million
Project Information/Year: 2017
IND
USTR
IAL
43
BMW PAINTSHOP PLANT 6, ROSSLYN
PROJECT TEAM
Client: BMW (SA)
Project Manager: DLV
Architect: DLV
Engineer: DLV
Quantity Surveyor: Schoombie Hartmann
Main Contractor:GrinakerBuilding
Steel Contractor: CADCON
Tonnage/Estimated Value: R10 Million
Project Information/Year: 2002
MA
NU
FACTU
RIN
G
44
MA
NU
FACTU
RIN
G
SEDIBENG BREWERY (HEINEKEN) – PHASE I
PROJECT TEAM
Client: Heineken
Project Manager:BKS
Architect:BKS
Engineer:BKS
Quantity Surveyor:DeLeeuwGroup
Main Contractor:G-LTABreweryJointVenture
Steel Contractor: ACT JV (A.Leita CADCON Tass)
Tonnage/Estimated Value:450tons/R18Million
Project Information/Year: 2009
45
ABI LINE 4 (COCA COLA), OLIFANTSFONTEIN
PROJECT TEAM
Client:ABIOlifantsfontein
Main Contractor: Renniks Construction
Steel Contractor: CADCON
Tonnage/Estimated Value:385tons/R7.5Million
Project Information/Year: 2005
MA
NU
FACTU
RIN
G
46
TWIZZA BOTTLING PLANT, MIDDELBURG
PROJECT TEAM
Client: Twizza
Project Manager:ImbonoFJAArchitects
Architect:ImbonoFJAArchitects
Engineer: CSE Engineers
Quantity Surveyor:FWJKQuantitySureyors
Main Contractor:P.BooysenConstruction/ISG
Steel Contractor: CADCON
Tonnage/Estimated Value:>100tons/R3Million
Project Information/Year:2013-2014
MA
NU
FACTU
RIN
G
47
CLOTAN MANUFACTURING AND STOCK
FACILITY – PHASE I, VANDERBIJLPARK
PROJECT TEAM
Client: Clotan Steel (Pty) Ltd
Project Manager: Clotan Steel (Pty) Ltd
Architect: Mictec
Engineer: Mictec
Quantity Surveyor: Mictec
Main Contractor: CADCON
Steel Contractor: CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value:1100tons/R19Million
Project Information/Year:2006-2007
MA
NU
FACTU
RIN
G
48
FLS Bridge Structure
49
Mining Projects
FLS Bridge Structure
50
BAKUBUNG - WINDER HOUSE AND ELECTRICAL
STORE, RUSTENBURG
PROJECT TEAM
Client: Wesizwe Platinum
Project Manager: TWP
Architect: TWP
Engineer: TWP
Quantity Surveyor: TWP
Main Contractor: Trencon
Steel Contractor: CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value:>280tons/R12Million
Project Information/Year: 2012
MIN
ING
51
MIN
ING
FLS BRIDGE STRUCTURE TO THICKENER
PROJECT TEAM
Project Manager: FLS
Engineer: FLS
Quantity Surveyor: FLS
Steel Contractor: CADCON
Tonnage/Estimated Value:300tons/R9Million
Project Information/Year:2014
52
MIN
ING
FLS SUB-STRUCTURE TO THICKENER
PROJECT TEAM
Project Manager: FLS
Engineer: FLS
Quantity Surveyor: FLS
Steel Contractor: CADCON
Tonnage/Estimated Value:>600tons/R9.6Million
Project Information/Year:2016
53
MIN
ING
FLS MOATIZE COAL STRUCTURES
PROJECT TEAM
Project Manager: FLS
Engineer: FLS
Quantity Surveyor: FLS
Steel Contractor: CADCON
Tonnage/Estimated Value:>850tons/R22Million
Project Information/Year:2013-2014
54
2010 FIFA Mbombela Soccer Stadium Roof, Nelspruit
55
Stadium and Sports Complex Projects
2010 FIFA Mbombela Soccer Stadium Roof, Nelspruit
56
2010 FIFA MBOMBELA SOCCER STADIUM ROOF,
NELSPRUIT
PROJECT TEAM
Client: Mbombela Local Municipality
Project Manager: Platinum Sport Consulting
Architect: R&L Architects
Engineer:GOBA
Quantity Surveyor: SVR
Main Contractor: Basil Read
Steel Contractor:CADCON/A.LeitaJV
Steel Detailing: Mondo Cane
Tonnage/Estimated Value:>1600Tons/R98Million
Project Information/Year: 2009 - 2010
STA
DIU
M A
ND
SPO
RTS
CO
MPLE
X
57
2010 FIFA PETER MOKABA SOCCER
STADIUM ROOF, PIETERSBURG
PROJECT TEAM
Client: Polokwane Local Municipality
Project Manager: SECO Construction Project Managers
Architect: Prism Architects
Engineer: Aurecon
Quantity Surveyor:KCMaiwasheQuantitySurveyors
Main Contractor:WBHO/PaulsBuildingJointVenture
Steel Contractor: Omni-Struct CADCON A. Leita in JV
Steel Detailing: Omni-Struct Nkosi
Tonnage/Estimated Value:>800tons/R77Million
Project Information/Year: 2010
STA
DIU
M A
ND
SPO
RTS
CO
MPLE
X
58
Statistics SA, Tshwane
Steel Awards 2016 Metal Cladding Category Winner
59
Government and Educational Projects
Statistics SA, Tshwane
60
GO
VERN
MEN
T A
ND
ED
UCA
TIO
NA
L
STATISTICS SA, TSHWANE
PROJECT TEAM
Client: Dipalopalo
Project Manager:GLHProjectManagers
Architect:GLHArchitecture
Engineer: Pure Consulting
Quantity Surveyor: Pentad Johannesburg
Main Contractor: Stats SA JV (WBHO)
Steel Contractor: CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value:>750Tons/R28Million
Project Information/Year:2015-2016
61
GO
VERN
MEN
T A
ND
ED
UCA
TIO
NA
L
TSHWANE HOUSE (MUNITORIA), TSHWANE
PROJECT TEAM
Client: Tshwane Local Municipality
Architect: LYT Motsepe JV
Engineer: Pure Consulting
Quantity Surveyor: Brian Heineberg & Associates
Main Contractor: Tsela Tshweu Construction JV
Steel Contractor: CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value: > R10 Million
Project Information/Year: 2015
62
2010 FIFA Mbombela Soccer Stadium Roof, Nelspruit
63
Sheeting and Cladding Projects
2010 FIFA Mbombela Stadium Roof
64
SH
EETI
NG
AN
D C
LAD
DIN
G
2010 FIFA MBOMBELA SOCCER STADIUM
ROOF SHEETING
PROJECT TEAM
Client: Mbombela Local Municipality
Project Manager: Platinum Sport Consulting
Architect: R&L Architects
Engineer:GOBA
Quantity Surveyor: SVR
Main Contractor: Basil Read
Steel Contractor:CADCON/A.LeitaJV
Steel Detailing: Mondo Cane
Area (m2): > 13 000m2 Sheeting > 11 000m2 Soffit Cladding
Project Information/Year: 2009 - 2010
65
SH
EETI
NG
AN
D C
LAD
DIN
G
ACSA INTERNATIONAL PIER DEVELOPMENT,
O.R. TAMBO INTERNATIONAL AIRPORT
PROJECT TEAM
Client: Airports Company South Africa (ACSA)
Project Manager:SIPinAssociationwithSeloane
Architect: Boogertman & Partners
Engineer: Bigen Africa
Quantity Surveyor: LDM in Association with Abakali
Main Contractor: Concor Trencon Stefanutti JV
Sheeting Contractor: CADCON
Area (m2): 10 200m2
Project Information/Year:2006-2007
66
Mauritius Commercial Bank, Mauritius
67
Export Projects
Mauritius Commecial Bank, Mauritius
68
MAURITIUS COMMERCIAL BANK (MCB), MAURITIUS
PROJECT TEAM
Client: Mauritius Commercial Bank
Project Manager: ARUP
Architect:JeanFrancoisKoenig
Engineer: ARUP
Quantity Surveyor: ARUP
Main Contractor:GCCMauritius
Steel Contractor: CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value:>150tons/R11Million
Project Information/Year: 2011
EXPO
RT
69
BAGATELLE MALL BRIDGE, MAURITIUS
PROJECT TEAM
Client: Mall of Mauritius, Bagatelle
Project Manager: ARUP
Architect: ARUP
Engineer: ARUP
Quantity Surveyor: EPB Quantity Surveyors
Main Contractor:REHM-Grinaker
Steel Contractor: CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value:13Tons/R1.6Million
Project Information/Year: 2012
EXPO
RT
70
EXPO
RT
DOUALA GRAND MALL, CAMEROON
PROJECT TEAM
Client: Douala Retail and Convention Centre
Project Manager: Profica
Concept Architect: Benoy
Design Architect: Raubex Renovo
Engineer:WSPGroupAfricaContractor: Raubex Renovo
Steel Contractor: CADCON
Steel Detailing: Mondo Cane
Tonnage/Estimated Value: 1650tonsProject Information/Year: 2018 - 2019
71
Social Development
Mauritius Commecial Bank, Mauritius
CADCON making a difference
For more information visit our website www.thecharactercompany.co.za or
contact Jaco v Schalkwyk on 084 777 7114 or jaco.ch@racter.co.za
72
73
The Character Company is a non profit organisation doing long
term MENtorship for young boys growing up without positive male
role models. Our beautiful country is plagued by a host of social
challenges that find its root in the lack of attention to the boy child in
particular. There is not sufficient focus by positive male role models
to help establish a value system in the lives of the South African boy
child and the lack of identity that this causes leads to frustration that
ends in violence. We are losing our young people to drugs, gangs,
prisons and death as a result of this and only by taking action, not
talking, will we be able to fix this.
We need a dedicated approach to teach our young men to dream
again, dream of a better tomorrow, a better opportunity for their
children one day and a better South Africa. To quote Mark Batterson
–“every dream is created twice. The first creation is mental.
Every invention, every business, every building, every painting
is conceived in the right-brain imagination first. It is nothing
more than a single-cell idea at that point. The second creation
is physical. You make it happen via blood, sweat and tears.”
WhenIlookattheprecedingpagesofdreamsturnedintoreality,it fills me with such a sense of pride to be associated with an
organisation like CADCON.IfthereisonethingthatRichardandhisteam know how to do, it is taking dreams and making them a reality
through hard work and dedication. That commitment to less talking
and more doing is also reflected in their approach to impact their
community and invest in opportunities and people that can make this
world a better place through the same approach. As an organisation
dealing with social and behavioural change in the lost young men of
our country, we value such partnerships. Too many people just talk
or complain but we understand that by partnering with organisations
that share the value of action, we can get the hard things done.
As a business owner, would you not like to see a more dedicated
work force, better work ethic, a less selfish approach to employment
and the opportunity to raise real men that will not only be better
employeesbutalsobetterfathersandhusbands.Itisonlywhenweunderstand that the development of character and skill must go hand
in hand, no longer can we just teach someone how to do a job if we
cannotatthesametimeteachhimtodothatjobwithpride.Investingin that future has never been easier because The Character Company
isdoingjustthat–raisingboystobegoodmen.
We would like to make use of this opportunity to congratulate each
and every person at CADCON on 30 years well done. The boys
from The Character Company would like to thank you for investing
in their lives, for stepping up and making things happen so that those
less fortunate can get opportunities that shape their lives for the better.
From the spectacular camp at Thakadu you hosted for us, the selfless
support of transport to and from other camps over the years and most
recently the donation and set up of a magnificent outdoor gym at our
campsiteinHartebeespoort–eachoneofthesemadeanimpactfarmore than you can ever imagine.
Jaco v Schalkwyk
Dad & Founder – The Character Company
74
Time Square Sun Arena
Steel Awards 2018 Overall Winner
75
Awards
Mauritius Commecial Bank, Mauritius
76
Awards
STEEL AWARDS 2011
OVERALL WINNER Protea Court Roof in JV with Tass Engineering
STEEL AWARDS 2010
CATEGORY WINNER TUBULAR 2010FIFAMbombelaSoccerStadiuminJVwithA.LeitaSteel
STEEL AWARDS 2016
CATEGORY WINNER METAL CLADDING Statistics SA Head Office
STEEL AWARDS 2017
CATEGORY WINNER METAL CLADDING KasaneAirport
STEEL AWARDS 2015
CATEGORY WINNER MINING AND INDUSTRIALMedupi Air Cooled Condenser in JV with A. Leita and Boksan Projects
STEEL AWARDS 2013
CATEGORY COMMENDATION MINING AND INDUSTRIALIllovoDistributionWarehouseinJVwithA.LeitaSteel
77
Awards
STEEL AWARDS 2017
CATEGORY WINNER ARCHITECTURAL Time Square Casino and Hotel Development, Menlyn Maine
STEEL AWARDS 2017
CATEGORY WINNER TUBULAR Time Square Casino and Hotel Development, Menlyn Maine
STEEL AWARDS 2018
CATEGORY WINNER TUBULAR Time Square Sun Arena
STEEL AWARDS 2018
CATEGORY WINNER COMMERCIAL Time Square Sun Arena
STEEL AWARDS 2018 OVERALL WINNERTime Square Sun Arena
CONTACT DETAILS:
1027 Ergon Street, Lyttelton, Ext. 6, 0157 South Africa • Box 35042, Menlo Park, 0102 South Africa
Tel: +27 (0)12 664 6134 • Fax: +27 (0)12 664 6166 • Email: info@cadcon.co.za • Website: www.cadcon.co.za
Recommended