80
i STRIVING FOR EXCELLENCE AND PEACE OF MIND IN STEEL CONSTRUCTION SINCE 1987 BUILDING RELATIONSHIPS THROUGH STEELWORK

BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

i

STRIVING FOR EXCELLENCE AND PEACE OF MIND IN STEEL CONSTRUCTION SINCE 1987

BUILDING RELATIONSHIPS

THROUGH STEELWORK

Page 2: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated
Page 3: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

1

PROJECT TEAM

Client: Pareto Limited

Project Manager: Origin Project

Managers

Architect: BILD Architects

Engineer: Aurecon

Quantity Surveyors: BTKM Quantity

Surveyors

Main Contractor: Murray & Roberts

Steel Contractor: IMBANI/ CADCON

Steel Detailer: Lavula

Tonnage / Estimated Value: >3 500 tons /

R125 Million

Project Information / Year: 2015-2017

2

The CADCON Story

5

Accreditations and Capability Matrix

7

Architectural Projects

13

Commercial Projects

33

Civil, Road and Bridge Projects

39

Industrial and Manufacturing Projects

49

Mining Projects

55

Stadium and Sports Complex Projects

59

Government and Educational Projects

63

Sheeting and Cladding Projects

67

Export Projects

71

Social Development

75

Awards

Contents

Page 4: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

2

Barry Barnard, a former Iscor employee, at

the time studying mechanical engineering

with Gerhard Meiring afterhours, joined

CADCOR. Performing small steelworks and

sundry metalworks, their business moved into

a larger rental premises in Waltloo, Pretoria

(1 000m2 workshop). Turnover of R1m – R2m

per annum.

Richard Butler, working as a student QS

at Schoombie Hartmann meets Gerhard

Meiring on CADCOR 1st major project, BMW

Paintshop build in Rosslyn.

1st project secured by

Richard Butler as QS, the

“Welcome to South Africa”

boards on the Border Posts

of Namibia, Botswana,

Swaziland, Mozambique

and Lesotho. Project value

R2.4m with Department of

Public Works South Africa.

1987 1989 1995 1996 1997 1997

Established CADCOR as Close Corporation –

founded by mechanical engineering student

Gerhard Meiring on a plot in a garage

outside Pretoria (Lynnwood).

Purchased industrial property in Lyttelton

Centurion, well located between Pretoria and

Johannesburg. Construct 1st workshop and

office facility, current Workshop A (2 100m2

with 4 overhead cranes). Turnover of R2m –

R3m per annum.

Richard Butler (passionate about steelwork,

working afterhours making steel furniture from

his parents garage) joined CADCOR to run

the tender and costing department looking to

expand.

Gerhard Meiring, founding member, left

CADCOR after deciding to emigrate to

Australia.

The CADCON Story

Workshops B and D

Richard Butler and

Barry Barnard –

National Annual Overall

Steel Awards Winner

2018.

Page 5: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

3

Established from humble beginnings in 1987 on a plot outside

Pretoria, CADCON (Pty) Ltd is a privately-owned, reputable steel

construction and engineering company which specializes in structural

steelwork solutions in all sectors of the construction and engineering

industries.

With an impressive track record spanning over 30 years, CADCON

has steadily grown their steel and engineering business through

establishing and maintaining good business relationships. Their

commitment to excellence and professionalism has secured ongoing

work in the South African construction industry, as well as export

projects to neighbouring African countries, Europe and Mauritius.

CADCON has proved itself as an expert in structural steelwork for:

•Architecturalprojects

•Commercialprojects- Airports

- Distribution and Logistic Facilities

- Workshop Facilities

- Entertainment

- Corporate Buildings

- Shopping Center and Retail Developments

•Civils,RoadsandBridges

•IndustrialandManufacturingprojects

•MiningProjects

•StadiaandSportComplexes

•GovernmentandEducational

•SheetingandCladding

•ExportProjects

CADCON has 15 100m2 of undercover workshop facilities serviced

by 25 No overhead cranes and deliver excellent workmanship on

all structural and platework products through Quality Standards

maintainedthroughISO9001:2008accreditationandISO3834welding standards. Final finish of steelwork is done at their own

blasting and painting facility covering in excess of 10 000m2.

In2011,inanefforttoadvanceeconomictransformation,CADCONconcludedanempowermentdealinvolving46%ofitsshareholding.This further re-inforced our commitment towards BEE empowerment

milestones. CADCON empower their workforce with expertise, skills

and leadership through management leading by example, providing

a safe working environment and good working relationships.

CADCON has also managed to contain company overheads for

client cost advantages. Our dedicated office staff and satisfied labour

workforce are always willing to put in the extra hours when needed to

expedite projects for clients.

CADCON has earned a reputation for prizing respect and loyalty

in the construction industry by delivering cost-effective solutions,

on-time and going the extra mile for contractors, engineers and

clientsinordertodeliveraqualityproduct.Inanyprojectittakeson,CADCON makes a point of living its maxim “Building relationships

through steelwork”.

After BMW Paintshop experience, awarded

700 ton Mercedes Benz Paintshop in East

London, paving the way for CADCOR and

building on this a formidable CV. Turnover in

2 years up to R15m.

Richard Butler moved to East London for

2 years during Mercedes expansion, while

Barry Barnard managed the Lyttelton works.

Terminated lease at Iscor and consolidated

into self-constructed 2nd Workshop B in

Lyttelton (Workshop B 3 600m2 with 6

overhead cranes).

1998 1999 1999 - 2000 2000 2000 - 2002 2003

Johan Jonker, former Head Structural Engineer

of DLV Engineers, left the consulting engineering

sector to add his experience by joining as the

3rd partner of CADCOR.

Name change initiated through process of

changing from Close Corporation to Pty (Ltd).

CADCOR cc. becomes CADCON (Pty) Ltd.

Increased Lyttelton Shop A workshop capacity

by renting additional Presco Iscor Facility

Pretoria West as 2nd workshop Facility.

Workshops A and C

MISSION: “BUILDING RELATIONSHIPS THROUGH STEELWORK”

Page 6: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

4

Implemented workshop and site management

system – FABTROL.

Invested in workshop automation through

FICEP CNC plate cutting (plasma and gas up

to 100mm thick), FICEP CNC 3-axis Beamline,

FICEP CNC angleline, FICEP CNC 22m in-line

cutting facility.

ISO 9001-2008 Accredited and ISO 3834

Welding.

CADCON entered into a 46% BEE

empowerment deal through Investec.

CADCON management

consolidate with 60%

shareholding and 40%

empowerment shareholding

in CADCON.

30 Year Anniversary.

2006-2008 2008 2009-2010 2011 2015 2017-2018

Expanded into 3rd workshop facility

Workshop C when Medupi ACC steelwork

in JV with A. Leita and Boksan awarded –

26 000 tons in JV (Workshop C 5 200m2 with

10 overhead cranes).

Expanded into 4th workshop facility,

Workshop D when Medupi Ducting

steelwork awarded (Workshop D 4 200m2

with 6 overhead cranes).

Johan Jonker, design engineer retired as

shareholder/Director.

Over the years CADCON has received recognition in the Steel

IndustrythroughSteelAwardsforprojectscompletedwithexcellence including:

•SteelAwards2010CategoryWinnerTubular–MbombelaStadium 2010 in JV with A. Leita Steel

•SteelAwards2011OverallWinner–ProteaCourtRoofinJVwithTass Engineering

•SteelAwards2013CategoryCommendationMiningandIndustrial–IllovoDistributionWarehouseinJVwithA.LeitaSteel

•SteelAwards2015CategoryWinnerMiningandIndustrial–Medupi Air Cooled Condenser in JV with A. Leita and Boksan

Projects

•SteelAwards2016CategoryWinnerMetalCladding–StatisticsSA Head Office

•SteelAwards2017CategoryWinnerMetalCladding–KasaneAirport

•SteelAwards2017CategoryWinnerArchitectural–MenlynTimeSquareDevelopment,GlobeBar/CasinoArch

•SteelAwards2017CategoryWinnerTubular–MenlynTimeSquareDevelopment,GlobeBar/CasinoArch

•SteelAwards2018OverallWinner–TimeSquareSunArena

•SteelAwards2018CategoryWinnerTubular–TimeSquareSunArena

•SteelAwards2018CategoryWinnerCommercial–TimeSquareSun Arena

The CADCON family and staff at the 2018 Annual Steel Awards Ceremony.

Page 7: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

5

Accreditations and Capability Matrix

Speciality/Expertise:

•TurnkeyDesignandSupplyfacility

•ProjectandStructureManagementusingFABTROL

•3DModellingandDetailDraughtinginTEKLA

•Supply,FabricateandErectionofStructuralsteelwork

•Supply,FabricateandErectionofPlatework

•BlastingandPaintingFacilities

Demographic area of operation:

•OperateinSouthAfrica,neighbouringAfrican countries, and internationally.

CAPABILITY MATRIX

ISO9001:2008–QualityManagementSystem

InternationalInstituteof WeldingSANSISO3834

Part 3 Steelwork

Member of the Southern African

InstituteofSteelConstruction (SAISC)

ACCREDITATIONS

Page 8: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

6

Menlyn Maine, Time Square Casino Entrance

Steel Awards 2017 Architectural and Tubular Category Winner

Page 9: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

7

Architectural Projects

Menlyn Maine, Time Square Casino Entrance

Page 10: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

8

ARC

HIT

EC

TURA

L

MENLYN SHOPPING RECONFIGURATION

(PHASE I AND PHASE II)

PROJECT TEAM

Client: Pareto Limited

Project Manager: Origin Project Managers

Architect:BILDArchitects

Engineer: Aurecon

Quantity Surveyor: BTKMQuantitySurveyors

Main Contractor: Murray & Roberts

Steel Contractor:Imbani/CADCON

Steel Detailer: Lavula

Tonnage/Estimated Value:>3500tons/R125Million

Project Information/Year: 2015 - 2017

Page 11: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

9

TIME SQUARE CASINO, ARENA AND HOTEL

DEVELOPMENT, MENLYN MAINE

PROJECT TEAM

Client:SunInternational

Project Manager: Proman

Architect: LYT Architects

Engineer:WSPGroup

Quantity Surveyor: MLC Quantity Surveyors

Main Contractor: WBHO

Steel Contractor:Imbani/CADCON

Shop Detailing: Mondo Cane

Tonnage/Estimated Value:>2500tons/R140Million

Project Information/Year:2016-2017

ARC

HIT

EC

TURA

L

The Time Square Arena was the Steel Awards 2018 Overall Winner as well as the winner of both the Tubular and Commercial Categories.

i

Page 12: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

10

ARC

HIT

EC

TURA

L

FOUNTAIN CIRCLE REDEVELOPMENT 2010

PROJECT TEAM

Client: Tshwane City Council

Project Manager: Responsive Environmental Design

Landscape Architect: Endemic

Engineer: PDesign

Quantity Surveyor: Tshwane City Council

Main Contractor: Wedge Save Joint Venture

Steel Contractor: CADCON

Shop Detailing: Mondo Cane

Tonnage/Estimated Value:<5ton/R950k

Project Information/Year: 2010

Page 13: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

11

TORNADO STRUCTURE EAST RAND MALL

PROJECT TEAM

Client: Redefine & Vukile Property Fund

Project Manager:SIPProjectManagers

Architect: MDS Architecture

Engineer: Sutherland Engineers

Quantity Surveyor: Norval Wentzel Steinberg (NWS)

Main Contractor: NMC

Steel Contractor: CADCON

Shop Detailing: DN Design

Tonnage/Estimated Value: R1.2 Million

Project Information/Year: 2015

ARC

HIT

EC

TURA

L

Page 14: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

12

Kasane International Airport Terminal Building, Botswana

Steel Awards 2017 Metal Cladding Category Winner

Page 15: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

13

Commercial Projects

Kasane International Airport Terminal Building, Botswana

Page 16: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

14

ACSA, CENTRAL TERMINAL BUILDING (CTB),

O.R. TAMBO INTERNATIONAL AIRPORT

PROJECT TEAM

Client: Airports Company South Africa (ACSA)

Project Manager:ARUP/BovellFreemanHolley/DiagonalProjectsJV

Architect:OsmondLangeArchitects/BentelAssociates/SiyakhaArchitects JV

Engineer:Africon/KAYP/Axis/LesileMadingaJV

Quantity Surveyor:DavisLangdonFarrowLaing/BTKM/PentadJV

Main Contractor: CTB JV (WBHO)

Steel Contractor: CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value:>3500tons/R103Million

Project Information/Year: 2007 - 2009

AIR

PO

RT

BU

ILD

ING

S

Page 17: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

15

AIR

PO

RT

BU

ILD

ING

S

ACSA INTERNATIONAL PIER DEVELOPMENT,

O.R. TAMBO INTERNATIONAL AIRPORT

PROJECT TEAM

Client: Airports Company South Africa (ACSA)

Project Manager:SIPinAssociationwithSeloane

Architect: Boogertman & Partners

Engineer:BIGENAfrica

Quantity Surveyor: LDM in Association with Abakali

Main Contractor: CONCOR Trencon Stefanutti JV

Steel Contractor: CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value:750tons/R18Million

Project Information/Year:2006-2007

Page 18: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

16

AIR

PO

RT

BU

ILD

ING

S

ACSA DOMESTIC TERMINAL,

O.R. TAMBO INTERNATIONAL AIRPORT

PROJECT TEAM

Client: Airports Company South Africa (ACSA)

Project Manager:TTA/DEC

Architect: TPC Architects

Engineer: LC Consulting

Quantity Surveyor: CP de Leeuw

Main Contractor:AirportContractors(Concor/Trencon)

Steel Contractor: CADCON

Steel Detailing: SH Services

Tonnage/Estimated Value:2000tons/R100Million

Project Information/Year: 2000 - 2002

Page 19: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

17

DIS

TRIB

UTI

ON

WA

REH

OU

SES

ACKERMANS DISTRIBUTION WAREHOUSE,

HAMMERSDALE, DURBAN

PROJECT TEAM

Client: Steinhoff Property

Developer: Rokwil

Project Manager: Rokwil

Architect: TC Design

Engineer: EDS Engineers

Quantity Surveyor: MHS Consulting

Main Contractor: Abbeydale Building and Civils

Steel Contractor:CADCON/A.LeitaJV

Shop Detailing: Mondo Cane

Tonnage/Estimated Value:2500tons/R75Million

Project Information/Year:2016-2017

Project steelwork of 2 500 tons was erected over a period of 4.5 months.i

Page 20: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

18

DIS

TRIB

UTI

ON

WA

REH

OU

SES

Project steelwork of 2 000 tons was erected in a record time of 3 months, erecting the structures from two sides. This production was also made possible through a joint venture with A. Leita Steel Construction.

i

WOOLWORTHS DISTRIBUTION WAREHOUSE,

MIDRAND

PROJECT TEAM

Client: Woolworths

Project Manager: MDSA Project Management

Architect: R&L Architects

Engineer: Aurecon

Quantity Surveyor: Norval Wentzel Steinberg (NWS)

Main Contractor: WBHO

Steel Contractor:CADCON/A.LeitaJV

Tonnage/Estimated Value:>2000tons/R30Million

Project Information/Year:2006

Page 21: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

19

DIS

TRIB

UTI

ON

WA

REH

OU

SES

ILLOVO DISTRIBUTION WAREHOUSE,

PIETERMARITZBURG

PROJECT TEAM

Client:Illovo

Developer: Collins Property

Project Manager: TC Design

Architect: TC Design

Engineer: EDS Engineers

Quantity Surveyor: MHS Consulting

Main Contractor: Armstrong Construction

Steel Contractor:CADCON/A.LeitaJV

Steel Detailing: Mondo Cane

Tonnage/Estimated Value:>1850tons/R52Million

Project Information/Year: 2013

Page 22: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

20

DIS

TRIB

UTI

ON

WA

REH

OU

SES

KOMATSU DC (PHASE I)

PROJECT TEAM

Client:Investec

Project Manager: Metrum Project Management

Architect:ICMArchitecture

Engineer: Sotiralis Consulting Engineers

Quantity Surveyor: Norval Wentzel Steinberg (NWS)

Main Contractor: Abbeydale Building and Civils

Steel Contractor: CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value:550tons/R18Million

Project Information/Year:2016

Page 23: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

21

DIS

TRIB

UTI

ON

WA

REH

OU

SES

ATLAS COPCO – HEAD OFFICE AND

WORKSHOP BUILDINGS

PROJECT TEAM

Client: Abbeydale Building and Civils

Architect:LeonKrugerArchitects

Engineer: EDS Engineers

Quantity Surveyor: Abbeydale Building and Civils

Main Contractor: Abbeydale Building and Civils

Steel Contractor: CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value:>800tons/R21Million

Project Information/Year:2014

Page 24: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

22

EN

TERTA

INM

EN

T

MENLYN MAINE TIME SQUARE CASINO, HOTEL

& ARENA DEVELOPMENT

PROJECT TEAM

Client:SunInternational

Project Manager: Pro-man

Architect: LYT Architecture

Engineer:WSPGroup

Quantity Surveyor: MLC Quantity Surveyors

Main Contractor: WBHO

Steel Contractor:Imbani/CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value:2600tons/R150Million

Project Information/Year:2016-2017

Globe Bar

Arena

Hotel

Page 25: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

23

CO

RPO

RA

TE B

UIL

DIN

GS

PWC HEAD OFFICE, WATERFALL

PROJECT TEAM

Client: Attacq

Project Manager: LYT Architecture

Architect: LYT Architecture

Engineer: ARUP

Quantity Surveyor: Brian Heineberg & Associates (BHA)

Main Contractor: WBHO

Steel Contractor: CADCON

Steel Detailing:MondoCane/HansSegmuller

Tonnage/Estimated Value:>300tons/R18Million

Project Information/Year: 2015 - 2017

Pho

to c

ourt

esy

of

Aru

p

Pho

to c

ourt

esy

of

Aru

p

Page 26: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

24

CO

RPO

RA

TE B

UIL

DIN

GS

ALICE LANE PHASE III, SANDTON

PROJECT TEAM

Client: Abland

Project Manager: Abland

Architect: Paragon Architects

Engineer: L&S Consulting Engineers

Quantity Surveyor: Quanticost Johannesburg

Main Contractor: WBHO

Steel Contractor: CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value: R7.1 Million

Project Information/Year: 2015

Page 27: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

25

CO

RPO

RA

TE B

UIL

DIN

GS

90 GRAYSTON OFFICES, SANDTON

PROJECT TEAM

Client: Redefine

Project Manager: Betts Townsend

Architect:GLHArchiects

Engineer: Sutherland Engineers

Quantity Surveyor: MLC Quantity Surveyors

Main Contractor: WBHO

Steel Contractor: CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value: R10 Million

Project Information/Year:2014

Page 28: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

26

CO

RPO

RA

TE B

UIL

DIN

GS

SANDTON CITY REPOSITIONING PHASE I –

PROTEA COURT ROOF

PROJECT TEAM

Client:STANLIB

Project Manager:GHCAfrica

Architect: MDS Architecture

Engineer: Aurecon

Quantity Surveyor: MLC Quantity Surveyors

Main Contractor:SJV(AvengGrinaker-LTA/WBHO)

Steel Contractor:Tass/CADCONinJV

Steel Detailing: Tass Engineering

Tonnage/Estimated Value: R7.2m Million

Project Information/Year: 2010

Steel Awards 2011 Overall Winner.i

Page 29: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

27

CO

RPO

RA

TE B

UIL

DIN

GS

SANDTON CITY REPOSITIONING PHASE II –

ATRIUM ON 5th

PROJECT TEAM

Client:STANLIB

Project Manager:GHCAfrica

Architect: MDS Architecture

Engineer: Aurecon

Quantity Surveyor:MLC/CraneQuantitySurveyors

Main Contractor:SJV(AvengGrinaker-LTA/WBHO)

Steel Contractor:Imbani/CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value:R6.8Million

Project Information/Year:2014

Page 30: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

28

SH

OPPIN

G &

RETA

IL

CEN

TRES

CORNUBIA MALL, UMHLANGA

PROJECT TEAM

Client:Investec

Project Manager:SIPProjectManagers

Architect:BentelAssociatesInternational

Engineer: Pure Consulting

Quantity Surveyor: Brian Heineberg and Associates (BHA)

Main Contractor: WBHO

Steel Contractor: CADCON

Steel Detailing:CADCON/Lavula/HansSegmuller/Isdc

Tonnage/Estimated Value:>1200tons/R55Million

Project Information/Year:2016-2017

Aerial view – August 2017

Aerial view – August 2016

Project steelwork of 1 400 tons (light weight) was erected over a period of 9 months.i

Page 31: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

29

SH

OPPIN

G &

RETA

IL

CEN

TRES

Virgin Active

MENLYN SHOPPING RECONFIGURATION

(PHASE I AND PHASE II)

PROJECT TEAM

Client: Pareto Limited

Project Manager: Origin Project Managers

Architect:BILDArchitects

Engineer: Aurecon

Quantity Surveyor:BTKMQuantitySurveyors

Main Contractor: Murray & Roberts

Steel Contractor:Imbani/CADCON

Steel Detailing: Lavula

Tonnage/Estimated Value:>3500tons/R125Million

Project Information/Year: 2015 - 2017

Page 32: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

30

SH

OPPIN

G &

RETA

IL

CEN

TRES

MALL OF AFRICA (WEST MAIN ROOF),

WATERFALL MIDRAND

PROJECT TEAM

Client: Attacq

Project Manager:GHCAfricaProjectManagement

Architect: MDS Architects

Engineer: Aurecon

Quantity Surveyor: Norval Wentzel Steinberg (NWS)

Main Contractor:MallofAfricaJV(WBHO/Group5)

Steel Contractor: CADCON

Steel Detailing:MondoCane/Lavula

Tonnage/Estimated Value:450tons/R13.5Million

Project Information/Year:2014-2015

Page 33: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

31

SH

OPPIN

G &

RETA

IL

CEN

TRES

MALL OF THE SOUTH, ALBERTON

PROJECT TEAM

Client: Zenprop

Project Manager: WT McClatchey Associates

Architect: Vivid

Engineer: Sotiralis

Quantity Surveyor: MLC Quantity Surveyors

Main Contractor:AvengGrinaker-LTA

Steel Contractor: CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value:>1000tons/R35Million

Project Information/Year:2014-2015

Page 34: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

32

N1, Lynnwood Infrastructure and Pedestrian Bridge

Page 35: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

33

Civil, Road and Bridge Projects

N1, Lynnwood Infrastructure and Pedestrian Bridge

Page 36: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

34

CIV

ILS,

RO

AD

S &

BRID

GES

N1, LYNNWOOD INFRASTRUCTURE AND

PEDESTRIAN BRIDGE

PROJECT TEAM

Client: SANRAL

Project Manager:DCA(DEC/CivilConcepts/ARQJV)

Architect:DCA(DEC/CivilConcepts/ARQJV)

Engineer:DCA(DEC/CivilConcepts/ARQJV)

Quantity Surveyor:DCA(DEC/CivilConcepts/ARQJV)

Main Contractor: BRCD JV

Steel Contractor: CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value:150tons/R10Million

Project Information/Year: 2010

Page 37: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

35

CIV

ILS,

RO

AD

S &

BRID

GES

HAZYVIEW PEDESTRIAN BRIDGE

PROJECT TEAM

Client: Twin City

Project Manager: Matla Quantity Surveyor

Architect: Leon Jacobs Architects

Engineer:KBKEngineers

Quantity Surveyor: Matla Quantity Surveyor

Main Contractor:iKotwe

Steel Contractor: CADCON

Steel Detailing: DN Design

Tonnage/Estimated Value: R3.5Million

Project Information/Year:2016

Page 38: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

36

SANRAL OPEN ROAD TOLLING FACILITIES (ORT),

GAUTENG FREEWAY IMPROVEMENT PROJECT

PROJECT TEAM

Client: SANRAL

Project Manager, Architect & Quantity Surveyor: Tolplan

Engineer: PDesign

Main Contractor: Trencon Present Perfect JV

Steel Contractor: CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value:>1500tons/R100Million

Project Information/Year: 2010 - 2011

CIV

ILS,

RO

AD

S &

BRID

GES

The project consisted of 84 gantry structures and was erected over a period of 6 month during the GFIP contract.

i

WILLIAM NICOL ROBOT GANTRY

PROJECT TEAM

Client: SANRAL

Project Manager:SSI

Architect: Boogertman and Partners

Engineer: ARQ

Quantity Surveyor:SSI

Main Contractor:GFIJV(WBHO)

Steel Contractor: CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value:22Tons/R1.5Million

Project Information/Year: 2010

Page 39: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

37

BOABAB TOLL PLAZA

PROJECT TEAM

Client: SANRAL

Architect: Pieter Mathews and Associates

Engineer: PDesign

Consulting Engineer: Tolplan (Pty) Ltd

Main Contractor: Stefanutti & Bressan

Steel Contractor: CADCON

Tonnage/Estimated Value: R1.2 Million

Project Information/Year: 2003

CIV

ILS,

RO

AD

S &

BRID

GES

Page 40: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

38

Medupi Air Cooled Condenser (ACC) Steelwork, Lephalale

Steel Awards 2015 Mining and Industrial Category Winner

Page 41: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

39

Industrial and Manufacturing Projects

Medupi Air Cooled Condensor (ACC) Steelwork, Lephalale

Page 42: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

40

MEDUPI AIR COOLED CONDENSER (ACC)

STEELWORK

PROJECT TEAM

Client:ESKOM

Project Manager:GEAAirCooledSystems

Architect: PB Power

Engineer:GEAAirCooledSystems

Main Contractor:KENTZ

Quantity Surveyor:KENTZ

Steel Contractor:ABCJV(A.Leita/Boksan/CADCON)

Steel Detailing: Mondo Cane

Tonnage/Estimated Value:>26000tons/R800Million

Project Information/Year: 2009 - 2012

IND

USTR

IAL

CADCON supplied, manufactured, galvanized and delivered 26 000 tons of steelwork over a period of 42 months in Joint Venture with A. Leita and Boksan Projects on the Medupi Power Station Project.

i

Page 43: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

41

MEDUPI DUCTING SUPPORTS

PROJECT TEAM

Client:ESKOM

Project Manager:GEAAirCooledSystems

Architect: PB Power

Engineer:GEAAirCooledSystems

Main Contractor:KENTZ

Quantity Surveyor:KENTZ

Main Contractor:KENTZ

Steel Contractor: CADCON

Tonnage/Estimated Value:>1500tons/R70Million

Project Information/Year:2010-2014

IND

USTR

IAL

Page 44: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

42

ILANGA SOLAR 100MW, UPINGTON

PROJECT TEAM

Client:DANKOCOM

Project Manager:DANKOCOM

Architect:DANKOCOM

Engineer: SENER

Quantity Surveyor:DANKOCOM

EPC:DANKOCOM

Steel Contractor: CADCON

Steel Detailing:CADCON/MondoCane/HansSegmuller/

GlenBanks/Lavula

Tonnage/Estimated Value:1600tons/R95Million

Project Information/Year: 2017

IND

USTR

IAL

Page 45: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

43

BMW PAINTSHOP PLANT 6, ROSSLYN

PROJECT TEAM

Client: BMW (SA)

Project Manager: DLV

Architect: DLV

Engineer: DLV

Quantity Surveyor: Schoombie Hartmann

Main Contractor:GrinakerBuilding

Steel Contractor: CADCON

Tonnage/Estimated Value: R10 Million

Project Information/Year: 2002

MA

NU

FACTU

RIN

G

Page 46: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

44

MA

NU

FACTU

RIN

G

SEDIBENG BREWERY (HEINEKEN) – PHASE I

PROJECT TEAM

Client: Heineken

Project Manager:BKS

Architect:BKS

Engineer:BKS

Quantity Surveyor:DeLeeuwGroup

Main Contractor:G-LTABreweryJointVenture

Steel Contractor: ACT JV (A.Leita CADCON Tass)

Tonnage/Estimated Value:450tons/R18Million

Project Information/Year: 2009

Page 47: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

45

ABI LINE 4 (COCA COLA), OLIFANTSFONTEIN

PROJECT TEAM

Client:ABIOlifantsfontein

Main Contractor: Renniks Construction

Steel Contractor: CADCON

Tonnage/Estimated Value:385tons/R7.5Million

Project Information/Year: 2005

MA

NU

FACTU

RIN

G

Page 48: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

46

TWIZZA BOTTLING PLANT, MIDDELBURG

PROJECT TEAM

Client: Twizza

Project Manager:ImbonoFJAArchitects

Architect:ImbonoFJAArchitects

Engineer: CSE Engineers

Quantity Surveyor:FWJKQuantitySureyors

Main Contractor:P.BooysenConstruction/ISG

Steel Contractor: CADCON

Tonnage/Estimated Value:>100tons/R3Million

Project Information/Year:2013-2014

MA

NU

FACTU

RIN

G

Page 49: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

47

CLOTAN MANUFACTURING AND STOCK

FACILITY – PHASE I, VANDERBIJLPARK

PROJECT TEAM

Client: Clotan Steel (Pty) Ltd

Project Manager: Clotan Steel (Pty) Ltd

Architect: Mictec

Engineer: Mictec

Quantity Surveyor: Mictec

Main Contractor: CADCON

Steel Contractor: CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value:1100tons/R19Million

Project Information/Year:2006-2007

MA

NU

FACTU

RIN

G

Page 50: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

48

FLS Bridge Structure

Page 51: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

49

Mining Projects

FLS Bridge Structure

Page 52: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

50

BAKUBUNG - WINDER HOUSE AND ELECTRICAL

STORE, RUSTENBURG

PROJECT TEAM

Client: Wesizwe Platinum

Project Manager: TWP

Architect: TWP

Engineer: TWP

Quantity Surveyor: TWP

Main Contractor: Trencon

Steel Contractor: CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value:>280tons/R12Million

Project Information/Year: 2012

MIN

ING

Page 53: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

51

MIN

ING

FLS BRIDGE STRUCTURE TO THICKENER

PROJECT TEAM

Project Manager: FLS

Engineer: FLS

Quantity Surveyor: FLS

Steel Contractor: CADCON

Tonnage/Estimated Value:300tons/R9Million

Project Information/Year:2014

Page 54: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

52

MIN

ING

FLS SUB-STRUCTURE TO THICKENER

PROJECT TEAM

Project Manager: FLS

Engineer: FLS

Quantity Surveyor: FLS

Steel Contractor: CADCON

Tonnage/Estimated Value:>600tons/R9.6Million

Project Information/Year:2016

Page 55: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

53

MIN

ING

FLS MOATIZE COAL STRUCTURES

PROJECT TEAM

Project Manager: FLS

Engineer: FLS

Quantity Surveyor: FLS

Steel Contractor: CADCON

Tonnage/Estimated Value:>850tons/R22Million

Project Information/Year:2013-2014

Page 56: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

54

2010 FIFA Mbombela Soccer Stadium Roof, Nelspruit

Page 57: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

55

Stadium and Sports Complex Projects

2010 FIFA Mbombela Soccer Stadium Roof, Nelspruit

Page 58: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

56

2010 FIFA MBOMBELA SOCCER STADIUM ROOF,

NELSPRUIT

PROJECT TEAM

Client: Mbombela Local Municipality

Project Manager: Platinum Sport Consulting

Architect: R&L Architects

Engineer:GOBA

Quantity Surveyor: SVR

Main Contractor: Basil Read

Steel Contractor:CADCON/A.LeitaJV

Steel Detailing: Mondo Cane

Tonnage/Estimated Value:>1600Tons/R98Million

Project Information/Year: 2009 - 2010

STA

DIU

M A

ND

SPO

RTS

CO

MPLE

X

Page 59: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

57

2010 FIFA PETER MOKABA SOCCER

STADIUM ROOF, PIETERSBURG

PROJECT TEAM

Client: Polokwane Local Municipality

Project Manager: SECO Construction Project Managers

Architect: Prism Architects

Engineer: Aurecon

Quantity Surveyor:KCMaiwasheQuantitySurveyors

Main Contractor:WBHO/PaulsBuildingJointVenture

Steel Contractor: Omni-Struct CADCON A. Leita in JV

Steel Detailing: Omni-Struct Nkosi

Tonnage/Estimated Value:>800tons/R77Million

Project Information/Year: 2010

STA

DIU

M A

ND

SPO

RTS

CO

MPLE

X

Page 60: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

58

Statistics SA, Tshwane

Steel Awards 2016 Metal Cladding Category Winner

Page 61: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

59

Government and Educational Projects

Statistics SA, Tshwane

Page 62: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

60

GO

VERN

MEN

T A

ND

ED

UCA

TIO

NA

L

STATISTICS SA, TSHWANE

PROJECT TEAM

Client: Dipalopalo

Project Manager:GLHProjectManagers

Architect:GLHArchitecture

Engineer: Pure Consulting

Quantity Surveyor: Pentad Johannesburg

Main Contractor: Stats SA JV (WBHO)

Steel Contractor: CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value:>750Tons/R28Million

Project Information/Year:2015-2016

Page 63: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

61

GO

VERN

MEN

T A

ND

ED

UCA

TIO

NA

L

TSHWANE HOUSE (MUNITORIA), TSHWANE

PROJECT TEAM

Client: Tshwane Local Municipality

Architect: LYT Motsepe JV

Engineer: Pure Consulting

Quantity Surveyor: Brian Heineberg & Associates

Main Contractor: Tsela Tshweu Construction JV

Steel Contractor: CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value: > R10 Million

Project Information/Year: 2015

Page 64: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

62

2010 FIFA Mbombela Soccer Stadium Roof, Nelspruit

Page 65: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

63

Sheeting and Cladding Projects

2010 FIFA Mbombela Stadium Roof

Page 66: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

64

SH

EETI

NG

AN

D C

LAD

DIN

G

2010 FIFA MBOMBELA SOCCER STADIUM

ROOF SHEETING

PROJECT TEAM

Client: Mbombela Local Municipality

Project Manager: Platinum Sport Consulting

Architect: R&L Architects

Engineer:GOBA

Quantity Surveyor: SVR

Main Contractor: Basil Read

Steel Contractor:CADCON/A.LeitaJV

Steel Detailing: Mondo Cane

Area (m2): > 13 000m2 Sheeting > 11 000m2 Soffit Cladding

Project Information/Year: 2009 - 2010

Page 67: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

65

SH

EETI

NG

AN

D C

LAD

DIN

G

ACSA INTERNATIONAL PIER DEVELOPMENT,

O.R. TAMBO INTERNATIONAL AIRPORT

PROJECT TEAM

Client: Airports Company South Africa (ACSA)

Project Manager:SIPinAssociationwithSeloane

Architect: Boogertman & Partners

Engineer: Bigen Africa

Quantity Surveyor: LDM in Association with Abakali

Main Contractor: Concor Trencon Stefanutti JV

Sheeting Contractor: CADCON

Area (m2): 10 200m2

Project Information/Year:2006-2007

Page 68: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

66

Mauritius Commercial Bank, Mauritius

Page 69: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

67

Export Projects

Mauritius Commecial Bank, Mauritius

Page 70: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

68

MAURITIUS COMMERCIAL BANK (MCB), MAURITIUS

PROJECT TEAM

Client: Mauritius Commercial Bank

Project Manager: ARUP

Architect:JeanFrancoisKoenig

Engineer: ARUP

Quantity Surveyor: ARUP

Main Contractor:GCCMauritius

Steel Contractor: CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value:>150tons/R11Million

Project Information/Year: 2011

EXPO

RT

Page 71: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

69

BAGATELLE MALL BRIDGE, MAURITIUS

PROJECT TEAM

Client: Mall of Mauritius, Bagatelle

Project Manager: ARUP

Architect: ARUP

Engineer: ARUP

Quantity Surveyor: EPB Quantity Surveyors

Main Contractor:REHM-Grinaker

Steel Contractor: CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value:13Tons/R1.6Million

Project Information/Year: 2012

EXPO

RT

Page 72: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

70

EXPO

RT

DOUALA GRAND MALL, CAMEROON

PROJECT TEAM

Client: Douala Retail and Convention Centre

Project Manager: Profica

Concept Architect: Benoy

Design Architect: Raubex Renovo

Engineer:WSPGroupAfricaContractor: Raubex Renovo

Steel Contractor: CADCON

Steel Detailing: Mondo Cane

Tonnage/Estimated Value: 1650tonsProject Information/Year: 2018 - 2019

Page 73: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

71

Social Development

Mauritius Commecial Bank, Mauritius

Page 74: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

CADCON making a difference

For more information visit our website www.thecharactercompany.co.za or

contact Jaco v Schalkwyk on 084 777 7114 or [email protected]

72

Page 75: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

73

The Character Company is a non profit organisation doing long

term MENtorship for young boys growing up without positive male

role models. Our beautiful country is plagued by a host of social

challenges that find its root in the lack of attention to the boy child in

particular. There is not sufficient focus by positive male role models

to help establish a value system in the lives of the South African boy

child and the lack of identity that this causes leads to frustration that

ends in violence. We are losing our young people to drugs, gangs,

prisons and death as a result of this and only by taking action, not

talking, will we be able to fix this.

We need a dedicated approach to teach our young men to dream

again, dream of a better tomorrow, a better opportunity for their

children one day and a better South Africa. To quote Mark Batterson

–“every dream is created twice. The first creation is mental.

Every invention, every business, every building, every painting

is conceived in the right-brain imagination first. It is nothing

more than a single-cell idea at that point. The second creation

is physical. You make it happen via blood, sweat and tears.”

WhenIlookattheprecedingpagesofdreamsturnedintoreality,it fills me with such a sense of pride to be associated with an

organisation like CADCON.IfthereisonethingthatRichardandhisteam know how to do, it is taking dreams and making them a reality

through hard work and dedication. That commitment to less talking

and more doing is also reflected in their approach to impact their

community and invest in opportunities and people that can make this

world a better place through the same approach. As an organisation

dealing with social and behavioural change in the lost young men of

our country, we value such partnerships. Too many people just talk

or complain but we understand that by partnering with organisations

that share the value of action, we can get the hard things done.

As a business owner, would you not like to see a more dedicated

work force, better work ethic, a less selfish approach to employment

and the opportunity to raise real men that will not only be better

employeesbutalsobetterfathersandhusbands.Itisonlywhenweunderstand that the development of character and skill must go hand

in hand, no longer can we just teach someone how to do a job if we

cannotatthesametimeteachhimtodothatjobwithpride.Investingin that future has never been easier because The Character Company

isdoingjustthat–raisingboystobegoodmen.

We would like to make use of this opportunity to congratulate each

and every person at CADCON on 30 years well done. The boys

from The Character Company would like to thank you for investing

in their lives, for stepping up and making things happen so that those

less fortunate can get opportunities that shape their lives for the better.

From the spectacular camp at Thakadu you hosted for us, the selfless

support of transport to and from other camps over the years and most

recently the donation and set up of a magnificent outdoor gym at our

campsiteinHartebeespoort–eachoneofthesemadeanimpactfarmore than you can ever imagine.

Jaco v Schalkwyk

Dad & Founder – The Character Company

Page 76: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

74

Time Square Sun Arena

Steel Awards 2018 Overall Winner

Page 77: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

75

Awards

Mauritius Commecial Bank, Mauritius

Page 78: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

76

Awards

STEEL AWARDS 2011

OVERALL WINNER Protea Court Roof in JV with Tass Engineering

STEEL AWARDS 2010

CATEGORY WINNER TUBULAR 2010FIFAMbombelaSoccerStadiuminJVwithA.LeitaSteel

STEEL AWARDS 2016

CATEGORY WINNER METAL CLADDING Statistics SA Head Office

STEEL AWARDS 2017

CATEGORY WINNER METAL CLADDING KasaneAirport

STEEL AWARDS 2015

CATEGORY WINNER MINING AND INDUSTRIALMedupi Air Cooled Condenser in JV with A. Leita and Boksan Projects

STEEL AWARDS 2013

CATEGORY COMMENDATION MINING AND INDUSTRIALIllovoDistributionWarehouseinJVwithA.LeitaSteel

Page 79: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

77

Awards

STEEL AWARDS 2017

CATEGORY WINNER ARCHITECTURAL Time Square Casino and Hotel Development, Menlyn Maine

STEEL AWARDS 2017

CATEGORY WINNER TUBULAR Time Square Casino and Hotel Development, Menlyn Maine

STEEL AWARDS 2018

CATEGORY WINNER TUBULAR Time Square Sun Arena

STEEL AWARDS 2018

CATEGORY WINNER COMMERCIAL Time Square Sun Arena

STEEL AWARDS 2018 OVERALL WINNERTime Square Sun Arena

Page 80: BUILDING RELATIONSHIPS THROUGH STEELWORK · of DLV Engineers, left the consulting engineering sector to add his experience by joining as the 3rd partner of CADCOR. Name change initiated

CONTACT DETAILS:

1027 Ergon Street, Lyttelton, Ext. 6, 0157 South Africa • Box 35042, Menlo Park, 0102 South Africa

Tel: +27 (0)12 664 6134 • Fax: +27 (0)12 664 6166 • Email: [email protected] • Website: www.cadcon.co.za