11
BIS C Series RFID Tool Holder Tag Installation

Tool Holder Tag Installation 6 2009

Embed Size (px)

DESCRIPTION

Download this presentation if you are interested in installing tags in your own tool holders. For information on Balluff tool ID check our website at http://www.balluff.com/Balluff/us/ProductsChannel/Overview/en/Tool+ID.htm

Citation preview

Page 1: Tool Holder Tag Installation 6 2009

BIS C Series RFIDTool Holder Tag Installation

Page 2: Tool Holder Tag Installation 6 2009

www.balluff.com

Industrial Identification

Installation Procedure

• Drill Tag Hole• Clean Install Surface• Tag Installation• Curing Note• Installation Protection and Safety

Page 3: Tool Holder Tag Installation 6 2009

www.balluff.com

Industrial Identification

Drill Tag Hole

• Always fixture tool holder• Bore hole based on tool holder type

and tag dimensions• Always reference recommendations for

tag location

Tool Holder

Example

Page 4: Tool Holder Tag Installation 6 2009

www.balluff.com

Industrial Identification

Drill Tag Hole

• Drill location and bore dimensions for BIS C-122-04/L tags accordingly– Use DIN 69893 for HSK type A – F holders

• Example:– Data carrier dim.: 10 X 4.5mm

– Bore dim.: 10mm +.09/-0 Dia. x 4.6mm +.2/-0 depth

Page 5: Tool Holder Tag Installation 6 2009

www.balluff.com

Industrial Identification

Cleaning

• Clean surface of metal chips, dust and grease.

• Acetone or thinner for nitrocellulose lacquer can be used.

• Same solvents can be used to clean excess adhesive before hardening.

Page 6: Tool Holder Tag Installation 6 2009

www.balluff.com

Industrial Identification

Tag Installation

• Recommended bonding material• Use two component Loctite Hysol 1C

– Balluff Part number: • Loctite Hysol 1C

• Roughen smooth side surfaces of data carrier (tag).

• Roughen sides of drilled hole.• Mix ratio is 2.5:1.0 or 250 parts

hardener to 100 parts adhesive.

Page 7: Tool Holder Tag Installation 6 2009

www.balluff.com

Industrial Identification

Tag Installation

• Apply Adhesive to both data carrier and hold.

• Place data carrier completely in hole.• Be sure part number of data carrier

can be read.

Page 8: Tool Holder Tag Installation 6 2009

www.balluff.com

Industrial Identification

Installation Curing

• 72 hours approx. curing time at room temp. (Depends on temp and mixture. Follow epoxy directions.)

• Applying heat can increase final bond strength.• Curing at 60° C for 2 hours improves bond to 12.1 N/mm²

Page 9: Tool Holder Tag Installation 6 2009

www.balluff.com

Industrial Identification

Epoxy Warnings

• Follow warnings on Loctite datasheet!• Protect against direct contact with skin.• Solvents should not be used for cleaning epoxy skin contact.• Perform work in well ventilated area.• Read Loctite technical datasheet!

Page 10: Tool Holder Tag Installation 6 2009

www.balluff.com

Industrial Identification

Any Questions?

Page 11: Tool Holder Tag Installation 6 2009

www.balluff.com

Industrial Identification

Thank you!