The lifting crane hydraulic system leak is how
• When there are many components of the hydraulic system relative motion gap seal part Q Q exist , the gap due to the processing and assembly errors , pillar slewing jib crane deformation and uneven wear occurs in the working element results in friction and wear generated by gradually increasing the pressure oil flows through the gap , will cause leakage.
•
• The main hydraulic system gap can be attributed to the following: ① wedge gap between the two main parallel with the surface low , uneven wear or improper assembly . ② the annular gap between the plunger and the main piston bore , and between the valve body and the valve spool of the hydraulic cylinder between the piston and the cylinder with the other . ③ annular plane gap , such as axial piston pump oil in boots Department. ④ parallel plane gap , such as gear pumps and pump body gap between the holes , side and side gear such as asking the gap .
Removing the tower crane electrical system installation technical
requirements• Remove the mounting tower crane electrical system is installed with steel cross conducted . Mainly
for the electrical connection of external components .•
• First, the agencies have not yet put on the lifting motor , brakes, cable stopper all connected, the other end of the cable wiring to wait until well after the lifting of the institution , so good the first cable bundle tied to the organization , to facilitate lifting body without damaging the cable. When cable wiring, cable end part of the use of plastic insulating tape wrapped , rubber cable outer insulation must be ' stuffed into the junction box , 5 ton overhead crane can not be no outer insulating rubber , only the inner layer of rubber insulated cables exposed ends of the outer connector .
•
• After lifting the cab to be connected to ground power distribution cabinet and the cab main cable. Connection with the cabinet cab console cable .
•
• With the installation of steel components , the cable can be connected , each connected.•
• Due to the different forms of tower cranes , electrical systems installation sequence is different , the general principle is to try and steel components to install cross, but also consider the cabinet is turned on as soon as possible , semi gantry crane because in the steel installation requires lifting mechanism and slewing mechanism with the operation . If conditions are not met, you can consider taking a temporary line.