Page 1: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

Metrics That Bring Value

Page 2: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

Introduction

Svetlana Mukhina

ICAgile ICP, ICP-ATF, ICP-BVA, PSM I

Agile and Career Coach at Luxoft Agile Practice

Experience: 12+ years in IT, Project and department management, Computer Linguistics, Technical Writing, Quality Assurance

Interests: Project management, Agile transformation, Career and performance coaching, Psychology

Hobbies: Horse riding, music, poker, travelling

Linkedin - https://www.linkedin.com/in/svetlanamukhina

Page 3: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

What Metrics We Gather on Projects

ü  Capacity – number of ideal hours available during next sprint

ü  Velocity – number of story point completed during previous sprint

ü  Requirements stability index – percentage of requirements changed in the current sprint

ü  Burn-down chart – visual representation of story points burned to the given moment

ü  We also log work time on daily basis

Page 4: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

Capacity

Capacity is a number of ideal hours available during next sprint

ü  To understand how many hours we really can do the work, e.g. write code or do testing

Ø  A usual developer don’t work more then 5h per day

ü  To be able to distribute tasks effectively

Ø  No sense to plan tasks for the ones on holiday

Ø  No good to refine or investigate tasks by those who will not take part in the sprint development

ü  To do precise planning

Ø  We estimate sub-tasks in hours and during planning map it to capacity

Page 5: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

Page 6: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

Ideal Hour and Load Factor

§  Read specification §  Discuss specification with BA §  Plan development activities §  Develop DB §  Develop server side §  Develop UI §  Check integration §  Build §  Development testing §  Bug-fixing

§  Unit tests create §  Unit tests running §  Bug-fixing after unit tests run §  Prepare test date §  Run story test §  Prepare and test deployment

procedures §  Deployment on server §  Merging §  Jira task update §  Sanity check §  Bug-fixing after testing §  Knowledge transfer and sharing §  Mentoring and training

Included in ideal hour

Included in load factor

Page 7: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

Velocity

Velocity is a number of story points completed during previous sprint.

ü  To track performance and see area of improvements on a team and individual basis;

ü  To form Sprint scope basing on experience from previous Sprint;

ü  To mitigate hard push from Product Owner/Manager when they would like to do extra in-scoping;

ü  To see that we have technical debt on the project;

Ø  Technical debt does not calculated into velocity, but time is spent on it

²  Using velocity and capacity all together helps to align workload basing on the past experience and future availability of development time, it make planning more accurate and results more expectable

Page 8: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

Velocity Visualization

Page 9: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

Requirements Stability Index

RSI is a percentage of requirements changed in the current sprint ü  To understand how much time was spent on re-work;

ü  To show the re-work time to PO;

Ø  It can be an argument to keep the sprint scope stable

Ø  It can persuade PO to prepare requirements beforehand

Page 10: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

Work Log

ü  To see what types of task are usually underestimated

Ø  Bring it on Retro or lessons learned session

Ø  In such a way one team has found out they always late with UI tasks

Ø  A team got statistics that tasks that done via virtual machines takes 30% more time

Ø  Other guys were able to present bottleneck in testing to the management

ü  To get information on re-opened tasks and investigate the reasons

Ø  One more team found out the necessity of sanity tests

ü  To track personal performance

Ø  Playing table tennis is not about writing code

Page 11: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

44

-15.5 0

23

-6.5

Hours Underestimate (delta >= 10 h)

Overestimate (delta <= -10 h )

Perfect estimate

Small underestimate (0 <delta <10)

Small overestimate (-10 < delta < 0)

2 1

5 6

3

Count

Underestimate (delta >= 10 h)

Overestimate (delta <= -10 h )

Perfect estimate

Small underestimate (0 <delta <10)

Small overestimate (-10 < delta < 0)

Page 12: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

Page 13: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

Burndown Chart

Burn-down is visual representation of story points burned to the given moment

ü  To make forecasting about ability to deliver scope in time;

ü  To see visually in-scoping and delays in order to be able to do de-scoping when it is necessary;

ü  To focus on team, not individual work;

Ø  Draw it as a team, be involved and take responsibility

ü  To discover and remove impediments in time;

Page 14: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

Page 15: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

Page 16: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

Page 17: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

Ideal team

ü  Not over-committing ü  Finished on time ü  Estimated correctly q  No corrections is necessary

Great team

ü  Completed work on time ü  Adapted a scope to complete the sprint ü  At the end can complete additional work

q  Discuss the reasons of late progress in Sprint first half q  Consider the capacity on planning

By Dusan Kocurek, ScrumDesk

Page 18: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

By Dusan Kocurek, ScrumDesk

ü  Complete commitment on time. ü  Adapted the scope or worked harder to complete

the sprint. ü  The team is self-reflecting q  Discuss change of plan immediately as they see

the progress is slowing down q Move a low priority item from next sprint backlog or

to product backlog.

Typical team Let’s have a rest

ü  Committed to less than they are able to complete ü  PO does not provide enough stories for the sprint. ü  Over-estimation of complexity q  Identify this problem earlier q  Ask the product owner to provide more work q  Continue with refined stories from the next

Page 19: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

ü  Didn’t complete the commitment ü  Was late for the entire sprint ü  Didn’t adapt the sprint scope to appropriate level q Move not completed or low priority stories to the

next sprint. q  Lower capacity of the next sprint q  Take corrective actions after a few days when

slower progress is observed.

Boom. It is too late

By Dusan Kocurek, ScrumDesk

Boom. Too early

ü  Finished work sooner than expected ü  Didn’t work on additional stories even it had capacity

to do it. ü  Stories were overestimated ü  The velocity is estimated incorrectly q  Ensure additional refined stories are ready to add

Page 20: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

By Dusan Kocurek, ScrumDesk

ü  Didn’t update progress accordingly ü  PO added the same amount of work that was already

completed ü  Didn’t able to predict the end of the sprint q  Explain why and how it is necessary to track the progress q  Stop the team after two or three days that shows a flat

progress line and should apply corrective actions

ü  Non-functional team on many levels. ü  No coaching of the team ü  PO does not care about development progress q  Cancel the sprint q  Restart the team q  Train the team

Oh, management is coming! Do Your Duties

Page 21: Svetlana Mukhina: Metrics That Bring Value at I T.A.K.E. Unconference 2015

www.luxoft.com

ü  Scope was not estimated ü  Sprint was started q  Arrange a planning meeting q  Estimate the user stories q  Create sprint backlog q  Start working on sprint backlog

By Dusan Kocurek, ScrumDesk

ü  First sprint typically looks like that ü  Scope was added to backlog daily without progress recorded. ü  Tasks were re-estimated constantly during the sprint q  Reevaluate sprint backlog q  Facilitate reevaluation session q  Coach the team

Zero effort

Up to the sky

Bump on the road ü  Sprint is started incorrectly. ü  Scope was added after the sprint start. q  Restart the sprint, even within a shorter timeframe. q  Start sprints with planning session using metrics