1
Chapter 6System Engineering
Chapter 6System Engineering
Software Engineering: A Practitioner’s Approach, 6th editionby Roger S. Pressman
2
System EngineeringSystem Engineering Elements of a computer-based
system Software Hardware People Database Documentation Procedures
Systems A hierarchy of macro-elements
Elements of a computer-based system Software Hardware People Database Documentation Procedures
Systems A hierarchy of macro-elements
3
The HierarchyWorld view
Business orProduct Domain
Domain of interest
Domain view
System element
Element view
Detailed view
4
System ModelingSystem Modeling
define the processes that serve the needs of the view under consideration.
represent the behavior of the processes and the assumptions on which the behavior is based.
explicitly define both exogenous and endogenous input to the model. exogenous inputs link one constituent of a given view with other
constituents at the same level of other levels; endogenous input links individual components of a constituent at a particular view.
represent all linkages (including output) that will enable the engineer to better understand the view.
define the processes that serve the needs of the view under consideration.
represent the behavior of the processes and the assumptions on which the behavior is based.
explicitly define both exogenous and endogenous input to the model. exogenous inputs link one constituent of a given view with other
constituents at the same level of other levels; endogenous input links individual components of a constituent at a particular view.
represent all linkages (including output) that will enable the engineer to better understand the view.
5
Business Process Engineering
uses an integrated set of procedures, uses an integrated set of procedures, methods, and tools to identify how methods, and tools to identify how information systems can best meet the information systems can best meet the strategic goals of an enterprisestrategic goals of an enterprise
focuses first on the enterprise and then focuses first on the enterprise and then on the business areaon the business area
creates enterprise models, data models creates enterprise models, data models and process modelsand process models
creates a framework for better creates a framework for better information management distribution, information management distribution, and controland control
6
System ArchitecturesSystem Architectures
Three different architectures must be analyzed and designed within the context of business objectives and goals:
data architecture applications architecture technology infrastructure
data architecture provides a framework for the information needs of a business or business function
application architecture encompasses those elements of a system that transform objects within the data architecture for some business purpose
technology infrastructure provides the foundation for the data and application architectures
Three different architectures must be analyzed and designed within the context of business objectives and goals:
data architecture applications architecture technology infrastructure
data architecture provides a framework for the information needs of a business or business function
application architecture encompasses those elements of a system that transform objects within the data architecture for some business purpose
technology infrastructure provides the foundation for the data and application architectures
7
The BPE Hierarchy Information strategy planning (ISP)
strategic goals defined success factors/business rules identified enterprise model created
Business area analysis (BAA) processes/services modeled interrelationships of processes and data
Application Engineering a.k.a ... software engineering modeling applications/procedures that
address (BAA) and constraints of ISP Construction and delivery
using CASE and 4GTs, testing
8
Information Strategy Planning Management issues
define strategic business goals/objectives
isolate critical success factors conduct analysis of technology impact perform analysis of strategic systems
Technical issues create a top-level data model cluster by business/organizational area refine model and clustering
9
Defining Objectives and Goals Objective—general statement of direction
Goal—defines measurable objective: “reduce manufactured cost of our product”Subgoals:
decrease reject rate by 20% in first 6 monthsgain 10% price concessions from suppliersre-engineer 30% of components for ease of
manufacture during first year Objectives tend to be strategic while
goals tend to be tactical
10
Business Area Analysis
define “naturally cohesive groupings of business functions and data” (Martin)
perform many of the same activities as ISP, but narrow scope to individual business area
identify existing (old) information systems / determine compatibility with new ISP model define systems that are problematic defining systems that are incompatible with new
information model begin to establish re-engineering priorities
11
The BAA Process
salesacct
manufacturing
QC
eng’ring
distribution
admin.
DataModel
ProcessDecomposition
DiagramMatrices
e.g.,entity/process
matrix
Process Flow
Models
12
Product EngineeringSystem analysis
(World view)
The completeproduct
capabilities
Componentengineering
(Domain view)
Processing requirement
Analysis & DesignModeling
(Element view)
Construction&
Integration(Detailed view)
software
function
SoftwareEngineering
programcomponent
hardware
data behavior
13
Product Architecture Template
user interface processing
inputprocessing
outputprocessing
maintenance and self-test
process and controlfunctions
14
Architecture Flow Diagram
bar codereader
subsystem
bar codedecoding
subsystem
data baseaccess
subsystem
shuntcontrol
subsystem
reportformating
subsystem
diagnosticssubsystem
operatorinterface
subsystem
shuntcontroller
mainframecommunications
driver
operator requests CLSS queries, reports, displays
shunt control statusbar code acquisition request
bar code
pulse tach input
linespeed
bar codereader status
sensor status
raw barcode data
partnumber
reportrequests
binlocation
key
sort records
formatedreporting data
sorting reports
shunt commands
CLSS reports
BCR statusshunt status
communications status
timing/location data
operatorinterface
data acquisitioninterface diagnostic interface output interface
CLSS processing & control
sensor dataacquisitionsubsystem
15
System Modeling with UMLSystem Modeling with UML Deployment diagrams
Each 3-D box depicts a hardware element that is part of the physical architecture of the system
Activity diagrams Represent procedural aspects of a system element
Class diagrams Represent system level elements in terms of the
data that describe the element and the operations that manipulate the data
These and other UML models will be discussed later
Deployment diagrams Each 3-D box depicts a hardware element that is
part of the physical architecture of the system Activity diagrams
Represent procedural aspects of a system element Class diagrams
Represent system level elements in terms of the data that describe the element and the operations that manipulate the data
These and other UML models will be discussed later
16
Deployment DiagramDeployment DiagramCLSS processor
Sorting subsystem
Sensor dataacquisition subsystem
Operator display
shunt controller
Conveyor Pulse tach
Bar code reader Shunt actuator
17
Activity DiagramActivity Diagram
get conveyor speed
send shunt
control data
get shunt status read bar code
start conveyor line
determine bin location
valid bar code
set for reject bin
conveyor in motion
read bar code
get conveyor status
produce report entry
conveyor stopped
invalid bar code
18
Class DiagramClass Diagram
Box
barcode forwardSpeed conveyorLocation height width depth weight contents
readBarcode() updateSpeed() readSpeed() updateLocation() readLocation() getDimensions() getWeight() checkContents()
class name
attributes note use of capital letter for multi-word attribute names
operations (parentheses at endof name indicate the list of attributes that theoperation requires)
19
System EngineeringSystem Engineering A system view of a product encompasses more than just the software.
Elements of a computer-based system: Software Hardware People Database Documentation Procedures Other computer-based systems
A system view of a product encompasses more than just the software.
Elements of a computer-based system: Software Hardware People Database Documentation Procedures Other computer-based systems
20
Chapter 7Requirements Engineering
Chapter 7Requirements Engineering
Software Engineering: A Practitioner’s Approach, 6th editionby Roger S. Pressman
21
Requirements EngineeringRequirements Engineering Inception—Establish a basic understanding of the problem
and the nature of the solution. Elicitation—Draw out the requirements from stakeholders. Elaboration—Create an analysis model that represents
information, functional, and behavioral aspects of the requirements.
Negotiation—Agree on a deliverable system that is realistic for developers and customers.
Specification—Describe the requirements formally or informally.
Validation—Review the requirement specification for errors, ambiguities, omissions, and conflicts.
Requirements management—Manage changing requirements.
Inception—Establish a basic understanding of the problem and the nature of the solution.
Elicitation—Draw out the requirements from stakeholders. Elaboration—Create an analysis model that represents
information, functional, and behavioral aspects of the requirements.
Negotiation—Agree on a deliverable system that is realistic for developers and customers.
Specification—Describe the requirements formally or informally.
Validation—Review the requirement specification for errors, ambiguities, omissions, and conflicts.
Requirements management—Manage changing requirements.
22
InceptionInception Ask “context-free” questions
Who is behind the request for this work? Who will use the solution (product/system)? What will be the economic benefits?
How would you characterize “good” output from the system? What problems does this solution address? What environment will the product be used in?
Are you the right person to answer these questions? Are these question relevant? Can anyone else provide additional information? Should I be asking you anything else?
Ask “context-free” questions Who is behind the request for this work? Who will use the solution (product/system)? What will be the economic benefits?
How would you characterize “good” output from the system? What problems does this solution address? What environment will the product be used in?
Are you the right person to answer these questions? Are these question relevant? Can anyone else provide additional information? Should I be asking you anything else?
23
Getting Requirements RightGetting Requirements Right “ The hardest single part of building a software system is deciding
what to build. No part of the work so cripples the resulting system if done wrong. No other part is more difficult to rectify later.”
—Fred Brooks
“The seeds of major software disasters are usually sown within the first three months of commencing the software project.”
—Capers Jones
“We spend a lot of time—the majority of project effort—not implementing or testing, but trying to decide what to build.”
—Brian Lawrence
“ The hardest single part of building a software system is deciding what to build. No part of the work so cripples the resulting system if done wrong. No other part is more difficult to rectify later.”
—Fred Brooks
“The seeds of major software disasters are usually sown within the first three months of commencing the software project.”
—Capers Jones
“We spend a lot of time—the majority of project effort—not implementing or testing, but trying to decide what to build.”
—Brian Lawrence
24
Eliciting RequirementsEliciting Requirements
Why is it so difficult to clearly understand what the customer wants? Scope
The boundary of the system is ill-defined. Customers/users specify unnecessary technical detail that may confuse rather
than clarify objectives. Understanding
Customers are not completely sure of what is needed. Customers have a poor understanding of the capabilities and limitations of the
computing environment. Customers don’t have a full understanding of their problem domain. Customers have trouble communicating needs to the system engineer. Customers omit detail that is believed to be obvious. Customers specify requirements that conflict with other requirements. Customers specify requirements that are ambiguous or untestable.
Volatility Requirements change over time.
Why is it so difficult to clearly understand what the customer wants? Scope
The boundary of the system is ill-defined. Customers/users specify unnecessary technical detail that may confuse rather
than clarify objectives. Understanding
Customers are not completely sure of what is needed. Customers have a poor understanding of the capabilities and limitations of the
computing environment. Customers don’t have a full understanding of their problem domain. Customers have trouble communicating needs to the system engineer. Customers omit detail that is believed to be obvious. Customers specify requirements that conflict with other requirements. Customers specify requirements that are ambiguous or untestable.
Volatility Requirements change over time.
25
Collaborative Requirements GatheringCollaborative Requirements Gathering
Meetings are attended by all interested stakeholders. Rules established for preparation and participation. Agenda should be formal enough to cover all important points, but
informal enough to encourage the free flow of ideas. A facilitator controls the meeting. A definition mechanism (blackboard, flip charts, etc.) is used. During the meeting:
The problem is identified. Elements of the solution are proposed. Different approaches are negotiated. A preliminary set of solution requirements are obtained. The atmosphere is collaborative and non-threatening.
Meetings are attended by all interested stakeholders. Rules established for preparation and participation. Agenda should be formal enough to cover all important points, but
informal enough to encourage the free flow of ideas. A facilitator controls the meeting. A definition mechanism (blackboard, flip charts, etc.) is used. During the meeting:
The problem is identified. Elements of the solution are proposed. Different approaches are negotiated. A preliminary set of solution requirements are obtained. The atmosphere is collaborative and non-threatening.
26
Quality Function DeploymentQuality Function Deployment
Function deployment determines the “value” (to the customer) of each function required of the system.
Information deployment identifies data objects and events.
Task deployment examines the behavior of the system. Value analysis determines the priority of requirements.
Function deployment determines the “value” (to the customer) of each function required of the system.
Information deployment identifies data objects and events.
Task deployment examines the behavior of the system. Value analysis determines the priority of requirements.
27
Elicitation Work ProductsElicitation Work Products Statement of need and feasibility.
Statement of scope. List of participants in requirements elicitation. Description of the system’s technical environment. List of requirements and associated domain
constraints. List of usage scenarios. Any prototypes developed to refine requirements.
Statement of need and feasibility. Statement of scope. List of participants in requirements elicitation. Description of the system’s technical environment. List of requirements and associated domain
constraints. List of usage scenarios. Any prototypes developed to refine requirements.
28
Use-CasesUse-Cases A use-case scenario is a story about how someone or
something external to the software (known as an actor) interacts with the system.
Each scenario answers the following questions: Who is the primary actor, the secondary actor(s)?
What are the actor’s goals? What preconditions should exist before the story begins? What main tasks or functions are performed by the actor? What exceptions might be considered as the story is described? What variations in the actor’s interaction are possible? What system information will the actor acquire, produce, or change? Will the actor have to inform the system about changes in the
external environment? What information does the actor desire from the system? Does the actor wish to be informed about unexpected changes?
A use-case scenario is a story about how someone or something external to the software (known as an actor) interacts with the system.
Each scenario answers the following questions: Who is the primary actor, the secondary actor(s)?
What are the actor’s goals? What preconditions should exist before the story begins? What main tasks or functions are performed by the actor? What exceptions might be considered as the story is described? What variations in the actor’s interaction are possible? What system information will the actor acquire, produce, or change? Will the actor have to inform the system about changes in the
external environment? What information does the actor desire from the system? Does the actor wish to be informed about unexpected changes?
29
Elements of the Analysis ModelElements of the Analysis Model
Scenario-based elements Use-case—How external actors interact with the system
(use-case diagrams; detailed templates) Functional—How software functions are processed in the
system (flow charts; activity diagrams) Class-based elements
The various system objects (obtained from scenarios) including their attributes and functions (class diagram)
Behavioral elements How the system behaves in response to different events
(state diagram) Flow-oriented elements
How information is transformed as if flows through the system (data flow diagram)
Scenario-based elements Use-case—How external actors interact with the system
(use-case diagrams; detailed templates) Functional—How software functions are processed in the
system (flow charts; activity diagrams) Class-based elements
The various system objects (obtained from scenarios) including their attributes and functions (class diagram)
Behavioral elements How the system behaves in response to different events
(state diagram) Flow-oriented elements
How information is transformed as if flows through the system (data flow diagram)
30
Use-Case DiagramUse-Case Diagram
31
Activity Diagram for REActivity Diagram for RE
32
Class DiagramClass Diagram
33
State DiagramState Diagram
34
Analysis PatternsAnalysis PatternsPattern name:Pattern name: Captures the essence of the pattern. Captures the essence of the pattern.
Intent:Intent: What the pattern accomplishes or represents. What the pattern accomplishes or represents.
Motivation:Motivation: A scenario that illustrates how the pattern solves a problem. A scenario that illustrates how the pattern solves a problem.
Forces and context:Forces and context: External issues (forces) that affect how the pattern is External issues (forces) that affect how the pattern is used, and external issues resolved when the pattern is applied. used, and external issues resolved when the pattern is applied.
Solution:Solution: How the pattern is applied to solve the problem; emphasizes How the pattern is applied to solve the problem; emphasizes structural and behavioral issues.structural and behavioral issues.
ConsequencesConsequences: What happens when the pattern is applied; what trade-: What happens when the pattern is applied; what trade-offs exist during its application.offs exist during its application.
DesignDesign: How the pattern can be achieved via known design patterns.: How the pattern can be achieved via known design patterns.
Known usesKnown uses: Examples of uses within actual systems.: Examples of uses within actual systems.
Related patternsRelated patterns: Patterns related to the named pattern because: Patterns related to the named pattern because
(1)(1) they are commonly used with the named pattern;they are commonly used with the named pattern;
(2)(2) they are structurally similar to the named pattern;they are structurally similar to the named pattern;
(3)(3) they are a variation of the named pattern.they are a variation of the named pattern.
35
Negotiating RequirementsNegotiating Requirements
Identify the key stakeholders These are the people who will be involved in the
negotiation Determine each of the stakeholders “win
conditions” Win conditions are not always obvious
Negotiate Work toward a set of requirements that lead to “win-win”
Identify the key stakeholders These are the people who will be involved in the
negotiation Determine each of the stakeholders “win
conditions” Win conditions are not always obvious
Negotiate Work toward a set of requirements that lead to “win-win”
36
Validating RequirementsValidating Requirements Is each requirement consistent with the objective of the system? Have all requirements been specified at the proper level of abstraction? Is the requirement really necessary? Is each requirement bounded and unambiguous? Does each requirement have attribution? Do any requirements conflict with other requirements? Is each requirement achievable in the system’s technical environment? Is each requirement testable, once implemented? Does the model reflect the system’s information, function and behavior? Has the model been appropriately “partitioned”? Have appropriate requirements patterns been used?
Is each requirement consistent with the objective of the system? Have all requirements been specified at the proper level of abstraction? Is the requirement really necessary? Is each requirement bounded and unambiguous? Does each requirement have attribution? Do any requirements conflict with other requirements? Is each requirement achievable in the system’s technical environment? Is each requirement testable, once implemented? Does the model reflect the system’s information, function and behavior? Has the model been appropriately “partitioned”? Have appropriate requirements patterns been used?
37
Example CRG MeetingExample CRG Meeting
First CRG meeting of the SafeHome project. After Q&A session (inception meeting), stakeholders write a
two page product request, which is delivered to those attending the first CRG meeting.
Attendees are asked to make a rough list of objects, services, constraints, and performance criteria for the product.
At the meeting, a combined list is created in each topic. Subgroups write mini-specifications for each list item. Relevant features in mini-specifications are added to the list.
First CRG meeting of the SafeHome project. After Q&A session (inception meeting), stakeholders write a
two page product request, which is delivered to those attending the first CRG meeting.
Attendees are asked to make a rough list of objects, services, constraints, and performance criteria for the product.
At the meeting, a combined list is created in each topic. Subgroups write mini-specifications for each list item. Relevant features in mini-specifications are added to the list.
38
Example CRG MeetingExample CRG Meeting Our research indicates that the market for home management
systems is growing at a rate of 40 percent per year. The first SafeHome function we bring to market should be the home security function. Most people are familiar with “alarm systems” so this would be an easy sell.
The home security function would protect against and/or recognize a variety of undesirable “situations” such as illegal entry, fire, flooding, carbon monoxide levels, and others. It’ll use our wireless sensors to detect each situation, can be programmed by the homeowner, and will automatically telephone a monitoring agency when a situation is detected.
Our research indicates that the market for home management systems is growing at a rate of 40 percent per year. The first SafeHome function we bring to market should be the home security function. Most people are familiar with “alarm systems” so this would be an easy sell.
The home security function would protect against and/or recognize a variety of undesirable “situations” such as illegal entry, fire, flooding, carbon monoxide levels, and others. It’ll use our wireless sensors to detect each situation, can be programmed by the homeowner, and will automatically telephone a monitoring agency when a situation is detected.
39
Example CRG MeetingExample CRG Meeting Objects – control panel, smoke detectors, window and door
sensors, motion detectors, an alarm, an event (sensor has been activated), a display, a PC, telephone numbers, a telephone call, …
Services – configuring the system, setting the alarm, monitoring the sensors, dialing the phone, programming the control panel, reading the display, …
Constraints – System must recognize when sensors are not operating, must be user friendly, must interface directly to a standard phone line, …
Performance criteria – Sensor event should be recognized within one second, an event priority scheme should be implemented, …
Objects – control panel, smoke detectors, window and door sensors, motion detectors, an alarm, an event (sensor has been activated), a display, a PC, telephone numbers, a telephone call, …
Services – configuring the system, setting the alarm, monitoring the sensors, dialing the phone, programming the control panel, reading the display, …
Constraints – System must recognize when sensors are not operating, must be user friendly, must interface directly to a standard phone line, …
Performance criteria – Sensor event should be recognized within one second, an event priority scheme should be implemented, …
40
Example CRG MeetingExample CRG Meeting
Mini-specification for Control Panel
The Control Panel is a wall-mounted unit that is approximately 9 x 5 inches in size. The control panel has wireless connectivity to sensors and a PC. User interaction occurs through a keypad containing 12 keys. A 2 x 2 inch LCD display provides user feedback. Software provides interactive prompts, echo, and similar functions.
Mini-specification for Control Panel
The Control Panel is a wall-mounted unit that is approximately 9 x 5 inches in size. The control panel has wireless connectivity to sensors and a PC. User interaction occurs through a keypad containing 12 keys. A 2 x 2 inch LCD display provides user feedback. Software provides interactive prompts, echo, and similar functions.