Upload
ripe-ncc
View
47
Download
0
Embed Size (px)
DESCRIPTION
Presentation given by Axel Pawlik at ENOG 7, Moscow, Russia on 26 May 2014
Citation preview
RIPE NCC | Moscow | May 2014
RIPE NCC Update
Axel Pawlik Managing Director
ENOG 7 - May 2014
RIPE NCC UpdateOver 10,000 RIPE NCC Members 2
Source: https://labs.ripe.net/statistics
10,309
ENOG 7 - May 2014
RIPE NCC UpdateAnnual Report 2013
• Operational Highlights (end 2013):– Strong growth: 1,139 additional members in 2013– 1,896 /22 IPv4 allocations and 1,724 IPv6 allocations– IPv6 allocation take up is > 66% of membership– 6,400 PI contractual relations processed (2007-01)– 20% of our members have their resources certified– Almost 5,000 active RIPE Atlas probes– 1 Million RIPEstat users (up from 122,000 in 2012)
3
ENOG 7 - May 2014
RIPE NCC UpdateAnnual Report 2013
• Financial Overview-Operational expenses were 3% lower than budget -Staff numbers are steady (3% lower than budget)-Reserves level remains at around one year’s operational expenses
-Cost per member still falling (6% lower than 2012)
4
ENOG 7 - May 2014
RIPE NCC UpdateHealth of the RIPE NCC
• Continually striving to keep the organisation:– Stable, Secure and Resilient– Useful to our members
• RIPE Database: Improved documentation and release processes
• Assisted Registry Check (ARC) initiated• Replacing and improving internal systems• Resiliency project initiated (site in Sweden)• Corporate governance documents in check
5
ENOG 7 - May 2014
RIPE NCC UpdateIncreased Risk for Hijacks
• IPv4 addresses are becoming more valuable• Criminals try very sophisticated methods to obtain
control over unused address blocks- Faking registration and identity papers- Faking entire websites and domains
!
• RIPE NCC has to do more thorough checks- Unfortunately, it can take extra time to process requests- Please cooperate by supplying the required documents
6
ENOG 7 - May 2014
RIPE NCC UpdateHelp Us Protect Your Resources
• Hijacks often target address blocks with outdated contact details
• Make sure your contact persons and company details are up-to-date
- Check the LIR Portal and update contact information- Verify all entries in RIPE Database- Process any changes right away
• RIPE NCC relies on this information to validate any requested changes
- Contact us if you need assistance updating your details
7
ENOG 7 - May 2014
RIPE NCC UpdateIPv6 RIPEness Amongst Members 8
21%
14%
9% 26%
30%
No IPv6 1 star 2 star 3 star 4 star
10,309 Members
ENOG 7 - May 2014
RIPE NCC UpdateIPv6 RIPEness Russian Federation 9
16%
13%
10%
22%
39%
No IPv6 1 star 2 star 3 star 4 star
1,145 Members
ENOG 7 - May 2014
RIPE NCC UpdateIPv6 RIPEness Over Time (RU) 10
0%
25%
50%
75%
100%Ja
n 20
11
Apr 2
011
Jul 2
011
Oct
201
1
Jan
2012
Apr 2
012
Jul 2
012
Oct
201
2
Jan
2013
Apr 2
013
Jul 2
013
Oct
201
3
Jan
2014
Apr 2
014
No IPv6 1 star 2 stars 3 stars 4 stars
ENOG 7 - May 2014
RIPE NCC UpdateIPv6 RIPEness CIS Region (relative) 11
0%
25%
50%
75%
100%
AM AZ BY GE KZ KG MD RU TJ TM UA UZ
No IPv6 1 star 2 stars 3 stars 4 stars
ENOG 7 - May 2014
RIPE NCC UpdateMore Improvements
• Investigating supporting more languages- Provide translations of key documents and information
• More contact with membership- Small-scale events such as dinners and lunch meetings
• Advancing capacity building- Introducing two-day technical IPv6 training- Improving E-learning platform and courses- IPv6 Roadshow material rewritten
• Collecting input on website improvements
12
ENOG 7 - May 2014
RIPE NCC UpdateRIPE NCC General Meeting
• GM held in Warsaw during RIPE 68 on 14 May• 2015 Charging Scheme was adopted
- €1,600 per annum (€150 down on 2014 fee)
• Adoption of implementation process of RIPE NCC services to Legacy Resource Holders
• RIPE NCC Executive Board elections- three vacant seats filled by Maria Häll, Salam Yamout & Christian Kaufmann
13
ENOG 7 - May 2014
RIPE NCC UpdateOur Regional Presence
• The RIPE NCC Survey 2013 results indicated that you wanted us to be more present in all regions
• We have increased the number of regional meetings- SEE 4 in 2015 - Belgrade- Kazakhstan and Iran 2014, Georgia 2015
• Expanding Dubai office- Two new Arab employees hired
• We already have one staff member based in Moscow
- Interviewing for second staff member
14
Questions?
ENOG 7 - May 2014
RIPE NCC Update 15