Download pdf - RIPE NCC Update

Transcript
Page 1: RIPE NCC Update

RIPE NCC | Moscow | May 2014

RIPE NCC Update

Axel Pawlik Managing Director

Page 2: RIPE NCC Update

ENOG 7 - May 2014

RIPE NCC UpdateOver 10,000 RIPE NCC Members 2

Source: https://labs.ripe.net/statistics

10,309

Page 3: RIPE NCC Update

ENOG 7 - May 2014

RIPE NCC UpdateAnnual Report 2013

• Operational Highlights (end 2013):– Strong growth: 1,139 additional members in 2013– 1,896 /22 IPv4 allocations and 1,724 IPv6 allocations– IPv6 allocation take up is > 66% of membership– 6,400 PI contractual relations processed (2007-01)– 20% of our members have their resources certified– Almost 5,000 active RIPE Atlas probes– 1 Million RIPEstat users (up from 122,000 in 2012)

3

Page 4: RIPE NCC Update

ENOG 7 - May 2014

RIPE NCC UpdateAnnual Report 2013

• Financial Overview-Operational expenses were 3% lower than budget -Staff numbers are steady (3% lower than budget)-Reserves level remains at around one year’s operational expenses

-Cost per member still falling (6% lower than 2012)

4

Page 5: RIPE NCC Update

ENOG 7 - May 2014

RIPE NCC UpdateHealth of the RIPE NCC

• Continually striving to keep the organisation:– Stable, Secure and Resilient– Useful to our members

• RIPE Database: Improved documentation and release processes

• Assisted Registry Check (ARC) initiated• Replacing and improving internal systems• Resiliency project initiated (site in Sweden)• Corporate governance documents in check

5

Page 6: RIPE NCC Update

ENOG 7 - May 2014

RIPE NCC UpdateIncreased Risk for Hijacks

• IPv4 addresses are becoming more valuable• Criminals try very sophisticated methods to obtain

control over unused address blocks- Faking registration and identity papers- Faking entire websites and domains

!

• RIPE NCC has to do more thorough checks- Unfortunately, it can take extra time to process requests- Please cooperate by supplying the required documents

6

Page 7: RIPE NCC Update

ENOG 7 - May 2014

RIPE NCC UpdateHelp Us Protect Your Resources

• Hijacks often target address blocks with outdated contact details

• Make sure your contact persons and company details are up-to-date

- Check the LIR Portal and update contact information- Verify all entries in RIPE Database- Process any changes right away

• RIPE NCC relies on this information to validate any requested changes

- Contact us if you need assistance updating your details

7

Page 8: RIPE NCC Update

ENOG 7 - May 2014

RIPE NCC UpdateIPv6 RIPEness Amongst Members 8

21%

14%

9% 26%

30%

No IPv6 1 star 2 star 3 star 4 star

10,309 Members

Page 9: RIPE NCC Update

ENOG 7 - May 2014

RIPE NCC UpdateIPv6 RIPEness Russian Federation 9

16%

13%

10%

22%

39%

No IPv6 1 star 2 star 3 star 4 star

1,145 Members

Page 10: RIPE NCC Update

ENOG 7 - May 2014

RIPE NCC UpdateIPv6 RIPEness Over Time (RU) 10

0%

25%

50%

75%

100%Ja

n 20

11

Apr 2

011

Jul 2

011

Oct

201

1

Jan

2012

Apr 2

012

Jul 2

012

Oct

201

2

Jan

2013

Apr 2

013

Jul 2

013

Oct

201

3

Jan

2014

Apr 2

014

No IPv6 1 star 2 stars 3 stars 4 stars

Page 11: RIPE NCC Update

ENOG 7 - May 2014

RIPE NCC UpdateIPv6 RIPEness CIS Region (relative) 11

0%

25%

50%

75%

100%

AM AZ BY GE KZ KG MD RU TJ TM UA UZ

No IPv6 1 star 2 stars 3 stars 4 stars

Page 12: RIPE NCC Update

ENOG 7 - May 2014

RIPE NCC UpdateMore Improvements

• Investigating supporting more languages- Provide translations of key documents and information

• More contact with membership- Small-scale events such as dinners and lunch meetings

• Advancing capacity building- Introducing two-day technical IPv6 training- Improving E-learning platform and courses- IPv6 Roadshow material rewritten

• Collecting input on website improvements

12

Page 13: RIPE NCC Update

ENOG 7 - May 2014

RIPE NCC UpdateRIPE NCC General Meeting

• GM held in Warsaw during RIPE 68 on 14 May• 2015 Charging Scheme was adopted

- €1,600 per annum (€150 down on 2014 fee)

• Adoption of implementation process of RIPE NCC services to Legacy Resource Holders

• RIPE NCC Executive Board elections- three vacant seats filled by Maria Häll, Salam Yamout & Christian Kaufmann

13

Page 14: RIPE NCC Update

ENOG 7 - May 2014

RIPE NCC UpdateOur Regional Presence

• The RIPE NCC Survey 2013 results indicated that you wanted us to be more present in all regions

• We have increased the number of regional meetings- SEE 4 in 2015 - Belgrade- Kazakhstan and Iran 2014, Georgia 2015

• Expanding Dubai office- Two new Arab employees hired

• We already have one staff member based in Moscow

- Interviewing for second staff member

14

Page 15: RIPE NCC Update

Questions?

ENOG 7 - May 2014

RIPE NCC Update 15


Recommended