PRODUCT CHECKLIST

Project name insert project name

Release Draft/Final

Date:

PRINCE2

Author:

Owner:

Client:

Document Number:

Page 2: Prince 2: project managment Document Product checklist

document.doc insert project name Date:

Document History

Document Location

This document is only valid on the day it was printed.The source of the document will be found in the appropriate Plans section.

Revision History

Date of next revision:

Revision date

Previous revision date

Summary of Changes Changes marked

Approvals This document requires the following approvals.

Signed approval forms are filed in the project files.

Name Signature Title Date of Issue

Version

Distribution This document has been distributed to:

Name Title Date of Issue

Version

Page 1

Page 3: Prince 2: project managment Document Product checklist

document.doc insert project name Date:

Purpose

To list the products to be produced within a Stage Plan, together with key status dates.

Contents This publication contains the following topics:

Topic See PagePlan identificationProduct namesPlanned and actual dates

Plan identification

Key dates:

Product Draft Ready Quality Check Approval

Plan Actual Plan Actual Plan Actual

Page 2