33
OWI Application Lab Launch-event Antwerp, 24/01/2012 Marc Van Peel Alderman for port and personnel, City of Antwerp & chairman of the board, Antwerp Port Authority

Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

  • Upload
    sirris

  • View
    441

  • Download
    0

Embed Size (px)

DESCRIPTION

Launch of the Offshore Wind Infrastructure Application Lab - Sirris.

Citation preview

Page 1: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

OWI Application LabLaunch-event

Antwerp, 24/01/2012

Marc Van Peel

Alderman for port and personnel, City of Antwerp & chairman of the board, Antwerp Port Authority

Page 2: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

OWI Application LabLaunch-event

Antwerp, 24/01/2012

Albert Pegg

Senior Advisor – Marketing, Promotion & Commercial RelationsAntwerp Port Authority

Page 3: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

0

50

100

150

200

97 98 99 0 1 2 3 4 5 6 7 8 9 10

Mill

ion

tonn

es

totalunloadedloaded

Maritime cargo transport 2011: 187 million tonnes

Page 4: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Breakbulk :European market shares excl. rolling stock 2010 (except for Bremen* & Hamburg* incl. rolling stock)

0% 10% 20% 30%

Amsterdam

Antwerp

Bremen*

Dunkirk

Ghent

Hamburg*

Rotterdam

Zeebrugge

Zeeland Seaports

Page 5: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Antwerp: Europe’s n 1 breakbulk port

Roro

Project cargoFruit

Project cargo

Steel

3rd

Forest products 1st

1st1st

1st

Page 6: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Project cargo

– Main European port for project cargo

– Handling > 2 million freight tons/year

– Oversize dimension cargo or heavy loads:

– locomotives & wagons– wind turbines– machinery– Industrial installations– cranes– etc.

Page 7: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

1. Excellent connectivity

Antwerp, project cargo hub: the survey…

2. State of the art infrastructure & equipment

4. Sustainable port with highly skilled labour force

3. Advanced added value services

Page 8: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

1. Excellent connectivity

Antwerp, project cargo hub: the survey…

2. State of the art infrastructure & equipment

4. Sustainable port with highly skilled labour force

3. Advanced added value services

Page 9: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

– Direct services to over 500 ports– 300 of which are called at weekly– The Antwerp arrival and departure

list: www.portofantwerp.com

10

Maritime connections

Shortsea regional container traffic

18%

12% 23%

47%North SeaAtlanticBaltic/Scandin/RussiaUK/Ireland

Spain/Portugal

Page 10: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Well connected to the European hinterland

All berths are fully trimodal: barge/feeder, rail and truck

Trimodal port

Page 11: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

200+ trains leave the port every day in all directions

Antwerp: directly linked to all major European motorways

Barge connections to Germany, Austria, France,…

Page 12: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

1. Excellent connectivity

Antwerp, project cargo hub: the survey…

2. State of the art infrastructure & equipment

4. Sustainable port with highly skilled labour force

3. Advanced added value services

Page 13: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Cranes

Floating crane ‘Brabo’

800 ton lifting capacity

Page 14: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Cranes

Tandem lift

Page 15: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Rolling EquipmentForkliftsReach StackersFlatbed trailer or MAFI’s

Lifting gearSpreader beams & framesSlings - chains

- wire rope- synthetic

Hooks and shackles

Page 16: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Modern technology

Vacuum

Page 17: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Modern technology

Magnets

Page 18: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

1. Excellent connectivity

Antwerp, project cargo hub: the survey…

2. State of the art infrastructure & equipment

4. Sustainable port with highly skilled labour force

3. Advanced added value services

Page 19: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Handling & storage area

•5,6 millions m² covered warehouses•Covered (un)loading installations for breakbulk, incl. overhead gantry crane with 50 MT capacity•Direct transshipment seagoing vessel-barge possible•Delivery on truck/rail under cover

Page 20: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Experience to handle oversized cargo

Page 21: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Experience to handle oversized cargo

Page 22: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Stuffing & stripping

Page 23: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

– Packaging of industrial loads in accordance with international maritime standards

– Special cargo protection: vaportight, shock absorbing, waterproof, imo, fumigation

– Consolidation and project management, ...

Packaging

Page 24: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Service centres

Decoiling Laser cutting

Page 25: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Direct transshipment

Page 26: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Lashing and securing

Page 27: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

1. Excellent connectivity

Antwerp, project cargo hub: the survey…

2. State of the art infrastructure & equipment

4. Sustainable port with highly skilled labour force

3. Advanced added value services

Page 28: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Experienced stevedores and operators

Location of the breakbulkterminals

Page 29: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen
Page 30: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Safeguarding the future:refurbishment of terminals

Page 31: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Experienced labour force

Page 32: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Safeguarding the future:training & development

– continued investments in human capital

by using innovating handling techniques

training in handling the equipment safety training

Trainees

Efficiency = Productivity + Quality

zero damages = no costszero accidents = zero downtime

Page 33: Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Haven van Antwerpen

Wind Logistics

Antwerp… your port to the Wind Energy sector

Thank you for your attention

CONTACT DETAILS:Antwerp Port Authority

Albert PeggSenior Advisor

[email protected]