25
Innovative, faster and safer access solutions for jack-up-rig leg works Benji George Business Unit Manager Middle East 1

Innovative, faster and safer access solutions for jack-up-rig leg works - OJME 2015 Speaker Benji George - Business Unit Manager Middle East, Palfinger Systems

Embed Size (px)

Citation preview

Folie 1

Innovative, faster and safer access solutions for jack-up-rig leg works

Benji GeorgeBusiness Unit Manager Middle East

1

Good Morning everyone. It is good to see you all. I am Benji George, and on behalf of Palfinger Systems, Palfinger Group and Megarme, I would like to extend a warm welcome to you.

IntroductionOffshore systemsInnovative, faster, safer jack up leg climbing unitsProject solutions Lamprell Seafox MOS AhmedDamen - Rowan VikingJUMP LiftQuestionsTable of Contents

2

We start with an introduction to Palfinger Systems. Then we move to the offshore systems with focus on the leg climbing product family providing innovative, faster, safer access to jack up legs with a very interesting video. We will look at the Lamprell Project utilizing Inspection Platform IP-11 for Close visual inspection by DNV GL Class surveyor, followed by a video on Damen Project utilizing JUMP on Rowan Viking modifications.

Introduction3

Introduction

Established in 2000 Engaged in the development and manufacture of innovative access and maintenance systems for the shipping and offshore industriesProviding proven game changing technologies for vessels hull treatment, as well as easy, safe and fast access during the inspection, repair and maintenance of offshore jack-up legs, underdecks and vessel cargo holdsFlexible standard solutions as well as customized applications to the highest level, available for purchase or rental, depending on the productIntroduction

4

Palfinger Systems has 2 Divisions - Ship Systems with Internal and external hull treatment systems which lead automation of shipyards and Offshore Systems for Jackup rigs and Platforms.

Growing Presence

Salzburg AustriaHeadquarterWengAustriaAssemblySingaporePalfinger Entraco System SolutionShanghai / Dalian / ShenzhenKS Distribution

RioTop Access Engenharia

Dubai / Abu Dhabi / Doha / BahrainMegarmeHamburgPalfinger systemsIstanbulMarsisViborg / BergenGardit A/S5

HQ is in Salzburg and factory in Weng, Austria. We work in Denmark, Germany, Turkey, China, Brazil & Singapore. In Middle East, we work with Megarme, which is a Palfinger Group company

Some of our esteemed Customers

6

A list of our esteemed clients from the offshore jack up contractors to shipyards

Offshore systems7

Offshore Systems - DC Deck Crane

8

The Deck Crane is for small lifts on board, quay side and warehouses. It is a diesel-powered, portable crane with jacking legs and is operated by one man with remote control. Can handle loads of [email protected] and [email protected]. The dead weight of the crane is below 10T

Offshore Systems AP Aerial Platform9

The Aerial Platform is 2 man basket with hydraulic arm and increases productivity by eliminating man-riding. Easily stowed when not in use, has minimal maintenance requirements with small foot print and can be used access tasks requiring 14m (46ft) vertical reach and 11m (36ft) horizontal reach. 3170Kg weight, with cable remote control. Ideal for inspections, maintenance of areas around the diverter, BOP stack, areas below the drill floor

Offshore Systems UPA Under Platform Access

10

The Under Platform Access can provide reach of 33m with 2 man basket. Weight varies from 9T to 19T depending on the depth of hull. Installed on offshore wind farms HVDC platforms Germany. SylWin (March 2014), BorWin (August 2013) and will be suitable for offshore oil & gas platform complexes which require UPA

The Product Family

IP Inspection PlatformRC Rack Crane JUMP Jack Up Maintenance Platform 11

The product family of jack up leg climbing units which provide safe and efficient access during newbuilding, inspection, repair and maintenance of offshore jack up leg structures. The main features are modular design which enables easy transportation, assembly and installation within hours. Adaptable to different leg designs and rack profiles. Spacious and solid work platform. Self powered and propelled. Access all levels above jack house. Fast and independent transfer of personnel and materials. Includes cranes, access arm, enclosures

Ideal work position on stable platform

12

A quick look at work done by rope access compared to our systems. Rope access specialists will have to maneuver themselves to ideal work position. On IP/RC/JUMP they can work safely at ideal work position on a stable platform which can be contained by full or partial enclosure.

IP - Inspection Platform

13

Inspection of the leg prior to yard visit. Non destructive testing (NDT),Changing anodes, Small repairs.Vertical speed up-to 12 m/min. Horizontal reachability 11 m Payload platform 420 kg + 300 kg in workmen basket. 1.5T payload in CT/MT mode of operation Max. persons: 4 (2 in workman basket) Diesel driven Power supply for tools 21 kW Max. weight of single component 300 kg Total weight approx. 9 t Deployable even offshore Installation time ~1 hr

RC - Rack Crane

14

Checking and repairing of rack teeth, ladders, position lights, brace exchange, anode replacement Steel repair works with higher lifting capacity Can have multiple specialists working on platform. Installation time ~3 hrs Vertical speed up-to 2.5 m/minMax. payload 4 5 t (350 kg in workman basket) Diesel driven Power supply 80kw (45 kW for drive unit and crane, 35 kW for tools)

JUMP - Jack Up Maintenance Platform

15

For large steel replacements and for works requiring an enclosure (blasting and painting) Installation time 10 - 20 hrs (depending on JUMP type) 40 - 50% saving in worktime for surface treatments like UHP blasting and painting, up-to 80% saving for steel works. Max. weight of single component 1,000 kg Configuration can include telescopic crane, aerial platform, crew transport, material transport, ancillary power + enclosure for containment during painting / blasting. Air conditioned environment. Zero discharge. Increases blasting and painting performance due to direct and stable positions. Reduction of overspray. Ensure quality paint coating. Safe and proper welding position

Video - Innovative, faster and safer access solutions for jack-up-rig leg works16

Corporate Video on Innovative, faster and safer access solutions for jack-up-rig leg works

Design

APin-wheel-drive (PWD)EGuiding opposal rackJWidth-adapterBPWD-housingFSupport-unit single rackKDepth-adapterCGearGSupport-unit opposal rackDGuiding single rackHCorner-module

17

Modular Design. Main Drive Unit which can be single rack or opposal rack depending on the rack teeth on leg chord

Configuration

18

Platform modules corner modules, adapter modules, access arm / crane mounting module, compensation module

Features 19

1919Onboard equipment like AP-14 basket arm 14m (46ft) vertical reach and 11m (36ft) horizontal reach, 3170Kg weight, hydraulic power requirement of 300 bar @45l/min, and payload of 350Kg (2 man basket) PK15500M Crane. 10m reach, 1T@10m Full or partial enclosures. Material: Tarpaulin, 900 g/m, B1, antistatic. Frame made of steel / aluminum construction up-to 160 km/h wind speed. Enclosures for containment is something rope access cannot provide.

Project solutions 20

Project Solutions

Lamprell Project Seafox MOS Ahmed

21

5th April 2015 was the date of this Innovative Project on Seafox MOS Rig Ahmed at Khalid Port Sharjah. For the first time in Middle East Close visual inspection at all levels of jack up leg was done by the DNV GL Surveyor Mr. Piotr Belka. 3 hours set up. 1 hour to install using 10T crane. 40 liters per 10 hour shift.

Damen Project - Rowan Viking Video22

Special Periodic Survey (certification extension); Acknowledgement of Compliance Scope (safety modifications) in accordance with Petroleum Safety Authority Norway (PSA) Leg Extension Scope (the 170-meter legs will have to be extended to 180 metres to be able to work in the deeper Norwegian waters).

JUMP-Lift with main craneJUMP-Shelf2. Leg extension lifted1. Leg extension on shelfAccess platformProject solutions - JUMP Lift

Concept for leg extension weight up-to 44T to substantially reduce down-time and high costs for heavy load cranes23

Will not require a special crane to reach up to the top of the leg for extensions or removals.

Questions24

Benji George Business Unit Manager Middle East

Mobile:+971 (0)56 409 7702Email: [email protected] #320, European Business Center, Dubai Investment Park, Dubai, UAEwww.palfingersystems.com