2013

BelEnergoProjectTURNING SOLUTIONS INTO SUCCESS

DESIGNING SUCCESS FOR THE FIUTURE

SURE ABOUT THE PRESENT

PROUD OF THE PAST

BelEnergoProject

About our company

ldquoBelEnergoProjectrdquo is a Russian-Belarussian engineering company originated from Minsk that

provides services to medium and large industrial and infrastructure customers in the field of

engineering consulting and design in heat and power engineering sector BelEnergoProject has its

offices both in Moscow and Minsk The main features of the company are broad geography of

projects in the CIS area

The main task of BelEnergoProject is a leadership in high quality solutions for customers in

distributed power industry Qualitative solutions allow our clients to be successful and confident in

the long term effectiveness of offered decision

Our target for the nearest future is the design of heat-and- electrical power engineering complexes

with a total generating capacity more than 1 GWe in distributed power sector

Officially authorized by SRO in Russian Federationhttpsrosporubelenergoproect

Offices and Project expansion

4

Companys authorized fund- 10 mil RUB

The Front-office is located in Minsk

Total number of employees - 60 people

Our Structure

5

ED

Project Director

Project ManagersAssistant

Mechanical Dep

Electrical Dep

Construction Dep Surveyors

Compliance and

Standartisation DepEngineering Dep

Support teamRampDTechnical solutions

Dep

GM

Specialists of BelEnergoProject are experienced professionals and have the necessary

qualification level in matters of heat and electric power generation More than 50 employees are

involved directly in design and preconstruction works 100 of conceptual and feasibility study

works and about 85 of the Front to End Engineering Design are performed by our specialists

6

BelEnergoProject performs energy audits preconstruction works (Justification of

Investments Feasibility Studies) and design and exploration works on various objects

of energy sector

bull thermal power plants operating on various types of fuels natural gas coal wood

fuel

bull wind and solar power plants

bull industrial energo-technological complexes power plants constructing on the base

of heat and electrical load of industrial enterprises of different branch of economy

bull boiler houses operating on various types of fuels

bull heat network sector heat pipes networks pumping equipment central and

individual heat supply station etc

bull heating system on the base of different heat pumps

bull automated control and energy accounting systems of all kind of energy flows

bull power grid construction from 04 kV to 110 kV

Our core business

Our specialization

7

The main activity of BelEnergoProject is designing of power plants and

energo-technological complexes

The main power generation equipment

bull Gas gensets MWM Jenbacher Caterpillar Cummins

bull Gas turbine units Siemens Turbomach Zorya-Mashproekt etc

bull Steam turbine units Kaluga Turbine Works Siemens etc

Features

bull Close integration into existing heat consuming technology of enterprise

bull Improving the reliability of electricity and heat supply systems of

enterprises

Focus on customer

8

During the last 5 years the number of projects with a total installed electrical

generation capacity more than 4000 MW was developed by the specialists of

BelEnergoProjectrdquo

bull 15 projects (160 MWe) - in a distributed power sector based on gas

fuel operated in mode of in parallel with the grid among them

bull 11 projects (87 MWe) - based on gas gensets operating on natural

gas casing-head gas and process gas

bull 4 project (73 MWe) - based on gas turbine and steam turbines (including

combined cycle implementation)

BelEnergoProject offers an integrated approach to meet the challenges of increasing

energy and economic efficiency of enterprises We perform all kind of works we could

start from energy audits and design solutions and provide the turnkey solution of

CHP construction

Based on long-term strategic agreements with partner companies with the financing for

EPC BOT BOO terms

Our experience

The major references from the last 5 years

9

The Customer and locationNominal power

MWe

The producer of the

Equipment

1 Belarus БЦЗ г Костюковичи ГТУ 320 laquoЗоря-Машпроектraquo

2Belarus РУП laquoБелоруснефтьraquo Когенерационная

установка на попутном газе60 GE Jenbaher

3 Belarus ОАО laquoПолимирraquo Когенерационная установка 90GE Jenbaher

4 Belarus ОАО laquoКрасносельскстройматериалыraquo ГТУ 150 Turbomach

5Belarus ОАО laquoСлуцкий сахарорафинадный комбинатraquo

Реконструкция ТЭЦ75

ОАО Калужский

турбинный завод

6Russia ОАО laquoСУМ3raquo Строительство мини-ТЭЦ и

реконструкция электрических сетей ОАО laquoСУМ3raquo215 MWM

7Belarus РК-3 в г Могилеве Реконструкция с установкой

электрогенерирующего оборудования185

Siemens

Qindao Steam

Turbines

8

Russia laquoГайский ГОКraquo г Гай Оренбургская обл

Реконструкция с установкой электрогенерирующего

оборудования620 Siemens Wartsila

10

Energy service CHP project laquoSUMZraquo

In the beginning of 2014 itrsquos

estimated the commissioning

and start of operation of the

first CHP (215 MW) based on

long- term energy service

contract for UGMK-holding

Contacts of laquoBelEnergoProjectraquo LLC

Tikhomirov Ivan

Managing Director

Mateiko Andrey

Executive Director

Landline MinskMoscow +7 (495) 215-21-98

Email infobelprojectorg

wwwbelprojectorg

11

The link to our site

Page 2: Bel energoproject_Eng

DESIGNING SUCCESS FOR THE FIUTURE

SURE ABOUT THE PRESENT

PROUD OF THE PAST

BelEnergoProject

About our company

ldquoBelEnergoProjectrdquo is a Russian-Belarussian engineering company originated from Minsk that

provides services to medium and large industrial and infrastructure customers in the field of

engineering consulting and design in heat and power engineering sector BelEnergoProject has its

offices both in Moscow and Minsk The main features of the company are broad geography of

projects in the CIS area

The main task of BelEnergoProject is a leadership in high quality solutions for customers in

distributed power industry Qualitative solutions allow our clients to be successful and confident in

the long term effectiveness of offered decision

Our target for the nearest future is the design of heat-and- electrical power engineering complexes

with a total generating capacity more than 1 GWe in distributed power sector

Officially authorized by SRO in Russian Federationhttpsrosporubelenergoproect

Offices and Project expansion

4

Companys authorized fund- 10 mil RUB

The Front-office is located in Minsk

Total number of employees - 60 people

Our Structure

5

ED

Project Director

Project ManagersAssistant

Mechanical Dep

Electrical Dep

Construction Dep Surveyors

Compliance and

Standartisation DepEngineering Dep

Support teamRampDTechnical solutions

Dep

GM

Specialists of BelEnergoProject are experienced professionals and have the necessary

qualification level in matters of heat and electric power generation More than 50 employees are

involved directly in design and preconstruction works 100 of conceptual and feasibility study

works and about 85 of the Front to End Engineering Design are performed by our specialists

6

BelEnergoProject performs energy audits preconstruction works (Justification of

Investments Feasibility Studies) and design and exploration works on various objects

of energy sector

bull thermal power plants operating on various types of fuels natural gas coal wood

fuel

bull wind and solar power plants

bull industrial energo-technological complexes power plants constructing on the base

of heat and electrical load of industrial enterprises of different branch of economy

bull boiler houses operating on various types of fuels

bull heat network sector heat pipes networks pumping equipment central and

individual heat supply station etc

bull heating system on the base of different heat pumps

bull automated control and energy accounting systems of all kind of energy flows

bull power grid construction from 04 kV to 110 kV

Our core business

Our specialization

7

The main activity of BelEnergoProject is designing of power plants and

energo-technological complexes

The main power generation equipment

bull Gas gensets MWM Jenbacher Caterpillar Cummins

bull Gas turbine units Siemens Turbomach Zorya-Mashproekt etc

bull Steam turbine units Kaluga Turbine Works Siemens etc

Features

bull Close integration into existing heat consuming technology of enterprise

bull Improving the reliability of electricity and heat supply systems of

enterprises

Focus on customer

8

During the last 5 years the number of projects with a total installed electrical

generation capacity more than 4000 MW was developed by the specialists of

BelEnergoProjectrdquo

bull 15 projects (160 MWe) - in a distributed power sector based on gas

fuel operated in mode of in parallel with the grid among them

bull 11 projects (87 MWe) - based on gas gensets operating on natural

gas casing-head gas and process gas

bull 4 project (73 MWe) - based on gas turbine and steam turbines (including

combined cycle implementation)

BelEnergoProject offers an integrated approach to meet the challenges of increasing

energy and economic efficiency of enterprises We perform all kind of works we could

start from energy audits and design solutions and provide the turnkey solution of

CHP construction

Based on long-term strategic agreements with partner companies with the financing for

EPC BOT BOO terms

Our experience

The major references from the last 5 years

9

The Customer and locationNominal power

MWe

The producer of the

Equipment

1 Belarus БЦЗ г Костюковичи ГТУ 320 laquoЗоря-Машпроектraquo

2Belarus РУП laquoБелоруснефтьraquo Когенерационная

установка на попутном газе60 GE Jenbaher

3 Belarus ОАО laquoПолимирraquo Когенерационная установка 90GE Jenbaher

4 Belarus ОАО laquoКрасносельскстройматериалыraquo ГТУ 150 Turbomach

5Belarus ОАО laquoСлуцкий сахарорафинадный комбинатraquo

Реконструкция ТЭЦ75

ОАО Калужский

турбинный завод

6Russia ОАО laquoСУМ3raquo Строительство мини-ТЭЦ и

реконструкция электрических сетей ОАО laquoСУМ3raquo215 MWM

7Belarus РК-3 в г Могилеве Реконструкция с установкой

электрогенерирующего оборудования185

Siemens

Qindao Steam

Turbines

8

Russia laquoГайский ГОКraquo г Гай Оренбургская обл

Реконструкция с установкой электрогенерирующего

оборудования620 Siemens Wartsila

10

Energy service CHP project laquoSUMZraquo

In the beginning of 2014 itrsquos

estimated the commissioning

and start of operation of the

first CHP (215 MW) based on

long- term energy service

contract for UGMK-holding

Contacts of laquoBelEnergoProjectraquo LLC

Tikhomirov Ivan

Managing Director

Mateiko Andrey

Executive Director

Landline MinskMoscow +7 (495) 215-21-98

Email infobelprojectorg

wwwbelprojectorg

11

The link to our site

Page 3: Bel energoproject_Eng

About our company

ldquoBelEnergoProjectrdquo is a Russian-Belarussian engineering company originated from Minsk that

provides services to medium and large industrial and infrastructure customers in the field of

engineering consulting and design in heat and power engineering sector BelEnergoProject has its

offices both in Moscow and Minsk The main features of the company are broad geography of

projects in the CIS area

The main task of BelEnergoProject is a leadership in high quality solutions for customers in

distributed power industry Qualitative solutions allow our clients to be successful and confident in

the long term effectiveness of offered decision

Our target for the nearest future is the design of heat-and- electrical power engineering complexes

with a total generating capacity more than 1 GWe in distributed power sector

Officially authorized by SRO in Russian Federationhttpsrosporubelenergoproect

Offices and Project expansion

4

Companys authorized fund- 10 mil RUB

The Front-office is located in Minsk

Total number of employees - 60 people

Our Structure

5

ED

Project Director

Project ManagersAssistant

Mechanical Dep

Electrical Dep

Construction Dep Surveyors

Compliance and

Standartisation DepEngineering Dep

Support teamRampDTechnical solutions

Dep

GM

Specialists of BelEnergoProject are experienced professionals and have the necessary

qualification level in matters of heat and electric power generation More than 50 employees are

involved directly in design and preconstruction works 100 of conceptual and feasibility study

works and about 85 of the Front to End Engineering Design are performed by our specialists

6

BelEnergoProject performs energy audits preconstruction works (Justification of

Investments Feasibility Studies) and design and exploration works on various objects

of energy sector

bull thermal power plants operating on various types of fuels natural gas coal wood

fuel

bull wind and solar power plants

bull industrial energo-technological complexes power plants constructing on the base

of heat and electrical load of industrial enterprises of different branch of economy

bull boiler houses operating on various types of fuels

bull heat network sector heat pipes networks pumping equipment central and

individual heat supply station etc

bull heating system on the base of different heat pumps

bull automated control and energy accounting systems of all kind of energy flows

bull power grid construction from 04 kV to 110 kV

Our core business

Our specialization

7

The main activity of BelEnergoProject is designing of power plants and

energo-technological complexes

The main power generation equipment

bull Gas gensets MWM Jenbacher Caterpillar Cummins

bull Gas turbine units Siemens Turbomach Zorya-Mashproekt etc

bull Steam turbine units Kaluga Turbine Works Siemens etc

Features

bull Close integration into existing heat consuming technology of enterprise

bull Improving the reliability of electricity and heat supply systems of

enterprises

Focus on customer

8

During the last 5 years the number of projects with a total installed electrical

generation capacity more than 4000 MW was developed by the specialists of

BelEnergoProjectrdquo

bull 15 projects (160 MWe) - in a distributed power sector based on gas

fuel operated in mode of in parallel with the grid among them

bull 11 projects (87 MWe) - based on gas gensets operating on natural

gas casing-head gas and process gas

bull 4 project (73 MWe) - based on gas turbine and steam turbines (including

combined cycle implementation)

BelEnergoProject offers an integrated approach to meet the challenges of increasing

energy and economic efficiency of enterprises We perform all kind of works we could

start from energy audits and design solutions and provide the turnkey solution of

CHP construction

Based on long-term strategic agreements with partner companies with the financing for

EPC BOT BOO terms

Our experience

The major references from the last 5 years

9

The Customer and locationNominal power

MWe

The producer of the

Equipment

1 Belarus БЦЗ г Костюковичи ГТУ 320 laquoЗоря-Машпроектraquo

2Belarus РУП laquoБелоруснефтьraquo Когенерационная

установка на попутном газе60 GE Jenbaher

3 Belarus ОАО laquoПолимирraquo Когенерационная установка 90GE Jenbaher

4 Belarus ОАО laquoКрасносельскстройматериалыraquo ГТУ 150 Turbomach

5Belarus ОАО laquoСлуцкий сахарорафинадный комбинатraquo

Реконструкция ТЭЦ75

ОАО Калужский

турбинный завод

6Russia ОАО laquoСУМ3raquo Строительство мини-ТЭЦ и

реконструкция электрических сетей ОАО laquoСУМ3raquo215 MWM

7Belarus РК-3 в г Могилеве Реконструкция с установкой

электрогенерирующего оборудования185

Siemens

Qindao Steam

Turbines

8

Russia laquoГайский ГОКraquo г Гай Оренбургская обл

Реконструкция с установкой электрогенерирующего

оборудования620 Siemens Wartsila

10

Energy service CHP project laquoSUMZraquo

In the beginning of 2014 itrsquos

estimated the commissioning

and start of operation of the

first CHP (215 MW) based on

long- term energy service

contract for UGMK-holding

Contacts of laquoBelEnergoProjectraquo LLC

Tikhomirov Ivan

Managing Director

Mateiko Andrey

Executive Director

Landline MinskMoscow +7 (495) 215-21-98

Email infobelprojectorg

wwwbelprojectorg

11

The link to our site

Page 4: Bel energoproject_Eng

Offices and Project expansion

4

Companys authorized fund- 10 mil RUB

The Front-office is located in Minsk

Total number of employees - 60 people

Our Structure

5

ED

Project Director

Project ManagersAssistant

Mechanical Dep

Electrical Dep

Construction Dep Surveyors

Compliance and

Standartisation DepEngineering Dep

Support teamRampDTechnical solutions

Dep

GM

Specialists of BelEnergoProject are experienced professionals and have the necessary

qualification level in matters of heat and electric power generation More than 50 employees are

involved directly in design and preconstruction works 100 of conceptual and feasibility study

works and about 85 of the Front to End Engineering Design are performed by our specialists

6

BelEnergoProject performs energy audits preconstruction works (Justification of

Investments Feasibility Studies) and design and exploration works on various objects

of energy sector

bull thermal power plants operating on various types of fuels natural gas coal wood

fuel

bull wind and solar power plants

bull industrial energo-technological complexes power plants constructing on the base

of heat and electrical load of industrial enterprises of different branch of economy

bull boiler houses operating on various types of fuels

bull heat network sector heat pipes networks pumping equipment central and

individual heat supply station etc

bull heating system on the base of different heat pumps

bull automated control and energy accounting systems of all kind of energy flows

bull power grid construction from 04 kV to 110 kV

Our core business

Our specialization

7

The main activity of BelEnergoProject is designing of power plants and

energo-technological complexes

The main power generation equipment

bull Gas gensets MWM Jenbacher Caterpillar Cummins

bull Gas turbine units Siemens Turbomach Zorya-Mashproekt etc

bull Steam turbine units Kaluga Turbine Works Siemens etc

Features

bull Close integration into existing heat consuming technology of enterprise

bull Improving the reliability of electricity and heat supply systems of

enterprises

Focus on customer

8

During the last 5 years the number of projects with a total installed electrical

generation capacity more than 4000 MW was developed by the specialists of

BelEnergoProjectrdquo

bull 15 projects (160 MWe) - in a distributed power sector based on gas

fuel operated in mode of in parallel with the grid among them

bull 11 projects (87 MWe) - based on gas gensets operating on natural

gas casing-head gas and process gas

bull 4 project (73 MWe) - based on gas turbine and steam turbines (including

combined cycle implementation)

BelEnergoProject offers an integrated approach to meet the challenges of increasing

energy and economic efficiency of enterprises We perform all kind of works we could

start from energy audits and design solutions and provide the turnkey solution of

CHP construction

Based on long-term strategic agreements with partner companies with the financing for

EPC BOT BOO terms

Our experience

The major references from the last 5 years

9

The Customer and locationNominal power

MWe

The producer of the

Equipment

1 Belarus БЦЗ г Костюковичи ГТУ 320 laquoЗоря-Машпроектraquo

2Belarus РУП laquoБелоруснефтьraquo Когенерационная

установка на попутном газе60 GE Jenbaher

3 Belarus ОАО laquoПолимирraquo Когенерационная установка 90GE Jenbaher

4 Belarus ОАО laquoКрасносельскстройматериалыraquo ГТУ 150 Turbomach

5Belarus ОАО laquoСлуцкий сахарорафинадный комбинатraquo

Реконструкция ТЭЦ75

ОАО Калужский

турбинный завод

6Russia ОАО laquoСУМ3raquo Строительство мини-ТЭЦ и

реконструкция электрических сетей ОАО laquoСУМ3raquo215 MWM

7Belarus РК-3 в г Могилеве Реконструкция с установкой

электрогенерирующего оборудования185

Siemens

Qindao Steam

Turbines

8

Russia laquoГайский ГОКraquo г Гай Оренбургская обл

Реконструкция с установкой электрогенерирующего

оборудования620 Siemens Wartsila

10

Energy service CHP project laquoSUMZraquo

In the beginning of 2014 itrsquos

estimated the commissioning

and start of operation of the

first CHP (215 MW) based on

long- term energy service

contract for UGMK-holding

Contacts of laquoBelEnergoProjectraquo LLC

Tikhomirov Ivan

Managing Director

Mateiko Andrey

Executive Director

Landline MinskMoscow +7 (495) 215-21-98

Email infobelprojectorg

wwwbelprojectorg

11

The link to our site

Page 5: Bel energoproject_Eng

Our Structure

5

ED

Project Director

Project ManagersAssistant

Mechanical Dep

Electrical Dep

Construction Dep Surveyors

Compliance and

Standartisation DepEngineering Dep

Support teamRampDTechnical solutions

Dep

GM

Specialists of BelEnergoProject are experienced professionals and have the necessary

qualification level in matters of heat and electric power generation More than 50 employees are

involved directly in design and preconstruction works 100 of conceptual and feasibility study

works and about 85 of the Front to End Engineering Design are performed by our specialists

6

BelEnergoProject performs energy audits preconstruction works (Justification of

Investments Feasibility Studies) and design and exploration works on various objects

of energy sector

bull thermal power plants operating on various types of fuels natural gas coal wood

fuel

bull wind and solar power plants

bull industrial energo-technological complexes power plants constructing on the base

of heat and electrical load of industrial enterprises of different branch of economy

bull boiler houses operating on various types of fuels

bull heat network sector heat pipes networks pumping equipment central and

individual heat supply station etc

bull heating system on the base of different heat pumps

bull automated control and energy accounting systems of all kind of energy flows

bull power grid construction from 04 kV to 110 kV

Our core business

Our specialization

7

The main activity of BelEnergoProject is designing of power plants and

energo-technological complexes

The main power generation equipment

bull Gas gensets MWM Jenbacher Caterpillar Cummins

bull Gas turbine units Siemens Turbomach Zorya-Mashproekt etc

bull Steam turbine units Kaluga Turbine Works Siemens etc

Features

bull Close integration into existing heat consuming technology of enterprise

bull Improving the reliability of electricity and heat supply systems of

enterprises

Focus on customer

8

During the last 5 years the number of projects with a total installed electrical

generation capacity more than 4000 MW was developed by the specialists of

BelEnergoProjectrdquo

bull 15 projects (160 MWe) - in a distributed power sector based on gas

fuel operated in mode of in parallel with the grid among them

bull 11 projects (87 MWe) - based on gas gensets operating on natural

gas casing-head gas and process gas

bull 4 project (73 MWe) - based on gas turbine and steam turbines (including

combined cycle implementation)

BelEnergoProject offers an integrated approach to meet the challenges of increasing

energy and economic efficiency of enterprises We perform all kind of works we could

start from energy audits and design solutions and provide the turnkey solution of

CHP construction

Based on long-term strategic agreements with partner companies with the financing for

EPC BOT BOO terms

Our experience

The major references from the last 5 years

9

The Customer and locationNominal power

MWe

The producer of the

Equipment

1 Belarus БЦЗ г Костюковичи ГТУ 320 laquoЗоря-Машпроектraquo

2Belarus РУП laquoБелоруснефтьraquo Когенерационная

установка на попутном газе60 GE Jenbaher

3 Belarus ОАО laquoПолимирraquo Когенерационная установка 90GE Jenbaher

4 Belarus ОАО laquoКрасносельскстройматериалыraquo ГТУ 150 Turbomach

5Belarus ОАО laquoСлуцкий сахарорафинадный комбинатraquo

Реконструкция ТЭЦ75

ОАО Калужский

турбинный завод

6Russia ОАО laquoСУМ3raquo Строительство мини-ТЭЦ и

реконструкция электрических сетей ОАО laquoСУМ3raquo215 MWM

7Belarus РК-3 в г Могилеве Реконструкция с установкой

электрогенерирующего оборудования185

Siemens

Qindao Steam

Turbines

8

Russia laquoГайский ГОКraquo г Гай Оренбургская обл

Реконструкция с установкой электрогенерирующего

оборудования620 Siemens Wartsila

10

Energy service CHP project laquoSUMZraquo

In the beginning of 2014 itrsquos

estimated the commissioning

and start of operation of the

first CHP (215 MW) based on

long- term energy service

contract for UGMK-holding

Contacts of laquoBelEnergoProjectraquo LLC

Tikhomirov Ivan

Managing Director

Mateiko Andrey

Executive Director

Landline MinskMoscow +7 (495) 215-21-98

Email infobelprojectorg

wwwbelprojectorg

11

The link to our site

Page 6: Bel energoproject_Eng

6

BelEnergoProject performs energy audits preconstruction works (Justification of

Investments Feasibility Studies) and design and exploration works on various objects

of energy sector

bull thermal power plants operating on various types of fuels natural gas coal wood

fuel

bull wind and solar power plants

bull industrial energo-technological complexes power plants constructing on the base

of heat and electrical load of industrial enterprises of different branch of economy

bull boiler houses operating on various types of fuels

bull heat network sector heat pipes networks pumping equipment central and

individual heat supply station etc

bull heating system on the base of different heat pumps

bull automated control and energy accounting systems of all kind of energy flows

bull power grid construction from 04 kV to 110 kV

Our core business

Our specialization

7

The main activity of BelEnergoProject is designing of power plants and

energo-technological complexes

The main power generation equipment

bull Gas gensets MWM Jenbacher Caterpillar Cummins

bull Gas turbine units Siemens Turbomach Zorya-Mashproekt etc

bull Steam turbine units Kaluga Turbine Works Siemens etc

Features

bull Close integration into existing heat consuming technology of enterprise

bull Improving the reliability of electricity and heat supply systems of

enterprises

Focus on customer

8

During the last 5 years the number of projects with a total installed electrical

generation capacity more than 4000 MW was developed by the specialists of

BelEnergoProjectrdquo

bull 15 projects (160 MWe) - in a distributed power sector based on gas

fuel operated in mode of in parallel with the grid among them

bull 11 projects (87 MWe) - based on gas gensets operating on natural

gas casing-head gas and process gas

bull 4 project (73 MWe) - based on gas turbine and steam turbines (including

combined cycle implementation)

BelEnergoProject offers an integrated approach to meet the challenges of increasing

energy and economic efficiency of enterprises We perform all kind of works we could

start from energy audits and design solutions and provide the turnkey solution of

CHP construction

Based on long-term strategic agreements with partner companies with the financing for

EPC BOT BOO terms

Our experience

The major references from the last 5 years

9

The Customer and locationNominal power

MWe

The producer of the

Equipment

1 Belarus БЦЗ г Костюковичи ГТУ 320 laquoЗоря-Машпроектraquo

2Belarus РУП laquoБелоруснефтьraquo Когенерационная

установка на попутном газе60 GE Jenbaher

3 Belarus ОАО laquoПолимирraquo Когенерационная установка 90GE Jenbaher

4 Belarus ОАО laquoКрасносельскстройматериалыraquo ГТУ 150 Turbomach

5Belarus ОАО laquoСлуцкий сахарорафинадный комбинатraquo

Реконструкция ТЭЦ75

ОАО Калужский

турбинный завод

6Russia ОАО laquoСУМ3raquo Строительство мини-ТЭЦ и

реконструкция электрических сетей ОАО laquoСУМ3raquo215 MWM

7Belarus РК-3 в г Могилеве Реконструкция с установкой

электрогенерирующего оборудования185

Siemens

Qindao Steam

Turbines

8

Russia laquoГайский ГОКraquo г Гай Оренбургская обл

Реконструкция с установкой электрогенерирующего

оборудования620 Siemens Wartsila

10

Energy service CHP project laquoSUMZraquo

In the beginning of 2014 itrsquos

estimated the commissioning

and start of operation of the

first CHP (215 MW) based on

long- term energy service

contract for UGMK-holding

Contacts of laquoBelEnergoProjectraquo LLC

Tikhomirov Ivan

Managing Director

Mateiko Andrey

Executive Director

Landline MinskMoscow +7 (495) 215-21-98

Email infobelprojectorg

wwwbelprojectorg

11

The link to our site

Page 7: Bel energoproject_Eng

Our specialization

7

The main activity of BelEnergoProject is designing of power plants and

energo-technological complexes

The main power generation equipment

bull Gas gensets MWM Jenbacher Caterpillar Cummins

bull Gas turbine units Siemens Turbomach Zorya-Mashproekt etc

bull Steam turbine units Kaluga Turbine Works Siemens etc

Features

bull Close integration into existing heat consuming technology of enterprise

bull Improving the reliability of electricity and heat supply systems of

enterprises

Focus on customer

8

During the last 5 years the number of projects with a total installed electrical

generation capacity more than 4000 MW was developed by the specialists of

BelEnergoProjectrdquo

bull 15 projects (160 MWe) - in a distributed power sector based on gas

fuel operated in mode of in parallel with the grid among them

bull 11 projects (87 MWe) - based on gas gensets operating on natural

gas casing-head gas and process gas

bull 4 project (73 MWe) - based on gas turbine and steam turbines (including

combined cycle implementation)

BelEnergoProject offers an integrated approach to meet the challenges of increasing

energy and economic efficiency of enterprises We perform all kind of works we could

start from energy audits and design solutions and provide the turnkey solution of

CHP construction

Based on long-term strategic agreements with partner companies with the financing for

EPC BOT BOO terms

Our experience

The major references from the last 5 years

9

The Customer and locationNominal power

MWe

The producer of the

Equipment

1 Belarus БЦЗ г Костюковичи ГТУ 320 laquoЗоря-Машпроектraquo

2Belarus РУП laquoБелоруснефтьraquo Когенерационная

установка на попутном газе60 GE Jenbaher

3 Belarus ОАО laquoПолимирraquo Когенерационная установка 90GE Jenbaher

4 Belarus ОАО laquoКрасносельскстройматериалыraquo ГТУ 150 Turbomach

5Belarus ОАО laquoСлуцкий сахарорафинадный комбинатraquo

Реконструкция ТЭЦ75

ОАО Калужский

турбинный завод

6Russia ОАО laquoСУМ3raquo Строительство мини-ТЭЦ и

реконструкция электрических сетей ОАО laquoСУМ3raquo215 MWM

7Belarus РК-3 в г Могилеве Реконструкция с установкой

электрогенерирующего оборудования185

Siemens

Qindao Steam

Turbines

8

Russia laquoГайский ГОКraquo г Гай Оренбургская обл

Реконструкция с установкой электрогенерирующего

оборудования620 Siemens Wartsila

10

Energy service CHP project laquoSUMZraquo

In the beginning of 2014 itrsquos

estimated the commissioning

and start of operation of the

first CHP (215 MW) based on

long- term energy service

contract for UGMK-holding

Contacts of laquoBelEnergoProjectraquo LLC

Tikhomirov Ivan

Managing Director

Mateiko Andrey

Executive Director

Landline MinskMoscow +7 (495) 215-21-98

Email infobelprojectorg

wwwbelprojectorg

11

The link to our site

Page 8: Bel energoproject_Eng

Focus on customer

8

During the last 5 years the number of projects with a total installed electrical

generation capacity more than 4000 MW was developed by the specialists of

BelEnergoProjectrdquo

bull 15 projects (160 MWe) - in a distributed power sector based on gas

fuel operated in mode of in parallel with the grid among them

bull 11 projects (87 MWe) - based on gas gensets operating on natural

gas casing-head gas and process gas

bull 4 project (73 MWe) - based on gas turbine and steam turbines (including

combined cycle implementation)

BelEnergoProject offers an integrated approach to meet the challenges of increasing

energy and economic efficiency of enterprises We perform all kind of works we could

start from energy audits and design solutions and provide the turnkey solution of

CHP construction

Based on long-term strategic agreements with partner companies with the financing for

EPC BOT BOO terms

Our experience

The major references from the last 5 years

9

The Customer and locationNominal power

MWe

The producer of the

Equipment

1 Belarus БЦЗ г Костюковичи ГТУ 320 laquoЗоря-Машпроектraquo

2Belarus РУП laquoБелоруснефтьraquo Когенерационная

установка на попутном газе60 GE Jenbaher

3 Belarus ОАО laquoПолимирraquo Когенерационная установка 90GE Jenbaher

4 Belarus ОАО laquoКрасносельскстройматериалыraquo ГТУ 150 Turbomach

5Belarus ОАО laquoСлуцкий сахарорафинадный комбинатraquo

Реконструкция ТЭЦ75

ОАО Калужский

турбинный завод

6Russia ОАО laquoСУМ3raquo Строительство мини-ТЭЦ и

реконструкция электрических сетей ОАО laquoСУМ3raquo215 MWM

7Belarus РК-3 в г Могилеве Реконструкция с установкой

электрогенерирующего оборудования185

Siemens

Qindao Steam

Turbines

8

Russia laquoГайский ГОКraquo г Гай Оренбургская обл

Реконструкция с установкой электрогенерирующего

оборудования620 Siemens Wartsila

10

Energy service CHP project laquoSUMZraquo

In the beginning of 2014 itrsquos

estimated the commissioning

and start of operation of the

first CHP (215 MW) based on

long- term energy service

contract for UGMK-holding

Contacts of laquoBelEnergoProjectraquo LLC

Tikhomirov Ivan

Managing Director

Mateiko Andrey

Executive Director

Landline MinskMoscow +7 (495) 215-21-98

Email infobelprojectorg

wwwbelprojectorg

11

The link to our site

Page 9: Bel energoproject_Eng

The major references from the last 5 years

9

The Customer and locationNominal power

MWe

The producer of the

Equipment

1 Belarus БЦЗ г Костюковичи ГТУ 320 laquoЗоря-Машпроектraquo

2Belarus РУП laquoБелоруснефтьraquo Когенерационная

установка на попутном газе60 GE Jenbaher

3 Belarus ОАО laquoПолимирraquo Когенерационная установка 90GE Jenbaher

4 Belarus ОАО laquoКрасносельскстройматериалыraquo ГТУ 150 Turbomach

5Belarus ОАО laquoСлуцкий сахарорафинадный комбинатraquo

Реконструкция ТЭЦ75

ОАО Калужский

турбинный завод

6Russia ОАО laquoСУМ3raquo Строительство мини-ТЭЦ и

реконструкция электрических сетей ОАО laquoСУМ3raquo215 MWM

7Belarus РК-3 в г Могилеве Реконструкция с установкой

электрогенерирующего оборудования185

Siemens

Qindao Steam

Turbines

8

Russia laquoГайский ГОКraquo г Гай Оренбургская обл

Реконструкция с установкой электрогенерирующего

оборудования620 Siemens Wartsila

10

Energy service CHP project laquoSUMZraquo

In the beginning of 2014 itrsquos

estimated the commissioning

and start of operation of the

first CHP (215 MW) based on

long- term energy service

contract for UGMK-holding

Contacts of laquoBelEnergoProjectraquo LLC

Tikhomirov Ivan

Managing Director

Mateiko Andrey

Executive Director

Landline MinskMoscow +7 (495) 215-21-98

Email infobelprojectorg

wwwbelprojectorg

11

The link to our site

Page 10: Bel energoproject_Eng

10

Energy service CHP project laquoSUMZraquo

In the beginning of 2014 itrsquos

estimated the commissioning

and start of operation of the

first CHP (215 MW) based on

long- term energy service

contract for UGMK-holding

Contacts of laquoBelEnergoProjectraquo LLC

Tikhomirov Ivan

Managing Director

Mateiko Andrey

Executive Director

Landline MinskMoscow +7 (495) 215-21-98

Email infobelprojectorg

wwwbelprojectorg

11

The link to our site

Page 11: Bel energoproject_Eng

Contacts of laquoBelEnergoProjectraquo LLC

Tikhomirov Ivan

Managing Director

Mateiko Andrey

Executive Director

Landline MinskMoscow +7 (495) 215-21-98

Email infobelprojectorg

wwwbelprojectorg