All users of an electrical power system expect that the frequency and voltages are maintained within acceptable boundaries at all times. Some participants, mainly generating units, provide the necessary frequency and voltage control services, called ancillary services. Since these participants are entitled to receive a payment for the services provided, markets for ancillary services have been developed along with the liberalisation of electricity markets. However, current arrangements vary widely from a power system to another. This thesis provides a comprehensive assessment of markets for frequency and voltage control ancillary services along three axes: (a) defining the needs for frequency and voltages, as well as specifying the ancillary services that can fulfil these needs; (b) assessing the cost of ancillary services for a producer; and (c) discussing the market design of an efficient procurement of ancillary services. Such a comprehensive assessment exhibits several advantages: (a) stakeholders can quickly grasp the issues related to ancillary services; (b) participants benefit from a standardised method to assess their system; (c) solutions are proposed to improve current arrangements; and (d) theoretical limitations that need future work are identified.
Citation preview
Assessment of Markets for Frequency and Voltage Control Ancillary ServicesAncillary ServicesLeonardo Energy webinar2 October 2009
Yann ReboursEDF R&[email protected]
Introduction
2 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
Why controlling frequency and voltages?
All power system stakeholders need f and U within boundaries for:Security of supply (e.g., by avoiding load shedding)Behaviour and efficiency of equipments (e.g., by avoiding vibrations, overheating, flickers…)Security of equipments (e.g., by avoiding over-voltages or over-speeds)
3 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
Frequency example
Lost of a nuclear unit (1300 MW) within the UCTE system (disturbance from normal operation)
4 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
50 mHz
Fundamentals of frequency control (f/P)
PP
PmaxLmax
PL
5 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
0Producers
0Consumers
f
50 Hz51 Hz49 Hz
Voltage example
Voltage map in French Guyana
ELA-CSG Malouin Suzini
93,9 kV 91,8 kV91,7 kV
6 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
Dégrad des Canes
Petit Saut
Kourou
TDFBalata
Etoile
St Laurent
Piquage
95,5 kV
93,3 kV
94,6 kV93,5 kV 92 kV91,9 kV
93,5 kV
Fundamentals of voltage control (U/Q)
Udistance
voltage
7 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
Q1 Q2 Q3 Q4
Who can provide f / U control services?
Generating unitsLoadsNetwork assets:
LinesTransformers, …
Purpose-built devices:
8 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
Purpose-built devices:Capacitor bankFACTSSynchronous compensatorInertia wheel, …
These controls are calledancillary services
System services vs ancillary services
Power system
Ancillary servicesAS
System servicesSS
(e.g., f and U within boundaries)
(e.g., real-time adaptation of P
and Q)
9 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
(private goods) (public goods)
Some users The other users
boundaries)and Q)
Rationale for the thesis
Final goal: improve efficiency & maximise global welfare
Formulate and structure the AS issue from a global point of view (3 axes)Illustrate the theory by comparing systems
10 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
Increase knowledge relative to AS cost (de-optimisation cost)Give the tools to improve current systems (e.g., give methods and checklists)Feed in the research: propose future work
This presentation : only an overview
Summary
1. Introduction
2. Delivery of ancillary services
3. Cost of ancillary services
11 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
4. Procurement
Delivery of ancillary services
1. Quality2. Quantity3. Location
12 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
1. Specify the quality of AS
A perfect specification does not existFour definition levels are possible:
ElementaryFunctionalPracticalStandardized
General
Precise
13 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
secondary f/P
TSO Producer
PSignal
primaryf/P
1. Functional definition
14 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
tertiary f/PInstructions
operator
secondary U/Q
TSO Producer
tertiary U/Q
SignalQ
primaryU/Q
1. Survey with the functional definition
Help for a common vocabulary
15 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
1. Practical definition
AS are technical products: they need more specs than energy onlyThe identification of the important parameters allows an inter-system comparisonIn Europe, standardisation is necessary (same recommendation but different applications)
16 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
1. Standardised definition
Helps a practical and universal definition:Does not rely on the input signalTake into account dynamics Does not depend on the type of provider (e.g. load or generating unit)
17 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
2. Define the quantity of AS
SS are a public good � only the TSO can define the needsA cost / benefit approach should be preferred
But difficult to estimate the value because SS have a triple objective:
Security (e.g., avoid blackouts)
18 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
Security (e.g., avoid blackouts)Quality (e.g., avoid over-voltages)System utilisation (e.g., reduce losses)
In practice:Inelastic demandMinimizing provision cost (rational buyer)
Research:Generally focused on VOLLBut VOLL does not consider quality + system utilisation
2. AS quantities in practice
Indicators have been proposed to compare systemsGive incentives to improve practices
19 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
2. Instantaneous frequency characteristic
Quality + quantity = frequency characteristic
Proposed definition
20 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
Current definition
3. Define the location of AS
Location is important because:Congestions can make impossible AS deliveryAn uniform distribution is desirable (in case of network islanding)Regulation at the transmission level is more critical (meshed network)
For an optimal repartition:
21 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
For an optimal repartition:Incentives to develop AS at the appropriate locationsExchange systems to allow short term arbitrage between areasCoordination at the owner boundaries (e.g., between distribution and transmission)
Cost of ancillary services
1. Cost components of ancillary services2. Method to estimate the de-optimisation cost3. Results on EDF Producer’s portfolio
22 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
1. Main cost components for a producer
Fixed costsInvestments in extra generating capacitiesWorkforce
Capacity reservation costDe-optimisationOpportunity cost
23 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
Utilisation costMore fuel is usedIncreased wear-and-tear
Very difficult to calculate precisely the AS costMany componentsInterdependent time horizonsHard to separate energy-only and AS costsCosts very different from one country to another (energy-mix dependent)
2. Method to estimate the de-optimisation cost
Proposed method: easy & standardApplied to EDF Producer over 879 days with operational data & algorithm (from 09/2004 to 08/2007)
De-optimisation cost = CostD-1 dispatch with reserves– Cost
24 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
– CostD-1 dispatch without reserves
G1
without reserves(cheaper dispatch)
G2 G1 G2 G3
energy for loads
frequency controlnon-used capacity
with reserves(more expensive dispatch)
2. The method in practice
1. APOGEE dataset with initial constraints
2. APOGEE dataset with reserve demand = 0 MW
APOGEE(EDF’s short-term dispatch algorithm)
OTESS
25 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
APOGEE dispatching 1 APOGEE dispatching 2
Database
Web-based interface
OTESS(Data management tool developed during the thesis)
Other data for correlation
2. Advantages and limits of the method for EDF
Advantages of our study vs previous literature:APOGEE takes into account many constraints (dynamics, hydro, thermal…)Actual day-ahead operational data as input
However, some limits in our study:If hydro energy is provided, reserve is provided as well (historical constraint)Water saving was not taken into account (days are considered as independent)
26 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
Water saving was not taken into account (days are considered as independent)The precise management of hydro valleys was not considered (only a global constraint for each reservoir)Obviously, manual day-ahead re-dispatch is not modelledOnly short-term variable costs are considered
Therefore, the method gives a minimum cost (real cost is higher)Further studies will be completed in 2009 to remove some limits
3. Results: the cost is not negligible
Up to 7,8 % of the dispatching costTherefore:
The reserve should be remunerated in order to avoid distortion of energy pricesAn efficient procurement is essential
27 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
3. The de-optimisation cost is variable
During 54 % of the time, the cost changed by more than 20 % from one day to the followingAllowing short-term arbitrage is thus essential
28 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
3. The cost is not seasonal
Low values from the PACFIt is difficult to apply the results over one period to another
29 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
4. Synchronous time control costs money
Because of time control, the reserve was modified by the French TSO up to January 2009 (±150 MW)This policy cost millions of euros/year in de-optimisationDoes the value of time control justify its cost? [Rebours et al (2009)]
30 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
f target = 50.01 Hz (27 days over 01/2005 - 07/2007) f target = 49.99 Hz (175 days over 01/2005 - 07/2007)
Procurement of ancillary services
1. Responsible entity for procurement2. Matching supply and demand3. Procurement methods4. Structure of remuneration5. Market clearing
31 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
5.6. Price caps7. Give appropriate incentives8. Metrics for market evaluation
Eight fundamental features
Why a market is necessary?AS are externalities (e.g., energy, transmission)Cost is non negligible
So what design?
The thesis highlights eight fundamental features
32 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
The thesis highlights eight fundamental featuresMarket designers (legislator, regulator, TSO…) should explain the current choices regarding these features
1. Responsible entity for procurement
Only the TSO should be the responsible entity for procurement:Knows the value of ASHas enough incentive to optimize its demandNo barrier for new entrants
But :Cost recovery problem
33 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
TSO is both consumer and provider of system servicesNot necessarily enough incentives to optimize the procurement
2. Matching supply and demand
Over the long run:Connecting conditions: not optimal, but it worksHowever, it is still linked to the security of supply issue (enough generating units)How can we optimize this demand over the long run?
Over the short run:An elastic demand is necessaryIncitation for participants to propose their capacities (e.g., with an attractive price)
34 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
Incitation for participants to propose their capacities (e.g., with an attractive price)
3. Procurement methods
Use several methods in parallel is necessaryTrend: f/P: competition – U/Q: regulated
35 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
4. Structure of remuneration
Depends on the services because cost structures are differentAn asymmetric remuneration is preferable (upward price ≠ downward price)
But if too complex, scoring can be difficult
36 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
5. Market clearing
StructureCentralised (pool) or decentralised (exchange)?
BiddingSealed-bid first-price auction desirable, but under perfect competition assumption
ScoringDifficult because multi-dimensional
37 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
Difficult because multi-dimensional
Time coordinationCommon clearing for energy / transmission / AS is essentialBut difficult in a decentralised structure
SettlementAlways in debate: zonal or nodal?Uniform or differentiated?
Clearing frequency
6. Price caps
Avoid price caps as much as possible
38 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
7. Give appropriate incentives
For cost allocation, the best:Fixed cost: shared by all users (transmission tariff)Reservation cost: based on the potential utilisation of usersUtilisation cost: “polluter” pays
Data transparency (e.g., how is the demand computed?)Control of performance and behaviours. Give incentives to auto-control
39 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
controlPenalties and rewards
8. Metrics for market evaluation
Effective: are there enough SS?Low cost to run the AS marketEconomic efficiency. One indicator:
40 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
Data for 2004-5
Conclusions
41 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
The thesis in a nutshell
Needs for SS = quality / quantity / locationThe thesis surveys various systems + proposes how to better specify the needs for SS
Cost of AS = fixed / capacity reservation / utilisationThe thesis improves the knowledge on the de-optimisation cost by
42 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
The thesis improves the knowledge on the de-optimisation cost by proposing a standardized method + applying it on EDF’s portfolio
Market design = entity responsible / supply-demand / procurement method / structure of payment / clearing / price cap / incentives / assessing method The thesis identifies, describes and analyses these features + illustrates with examples + suggests some ways of improvements
Suggestions for future work
Regularly assess systems with the proposed frameworkDraw the limit between negotiable and non-negotiable products (why stability is not remunerated?)Deepen the understanding of costs (AS cost + market cost)Improve market design (e.g., long-term incentives, demand elasticity, better allocation of costs, better data transmission…)
43 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
elasticity, better allocation of costs, better data transmission…)Facilitate the exchanges between areas:
Standardise products
Standardise markets
Co-ordinate energy / interconnections / AS
Develop alternative AS suppliers (e.g. loads, wind power…)
For further reading…
Technique:"A Survey of Frequency and Voltage Control Ancillary Services—Part I: Technical Features", IEEE Transactions on Power Systems, vol. 22 (1), pp. 350-357, February 2007.Y. Rebours, J. Pestourie, and E. Monnot, "Five Good Reasons to Abandon Synchronous Time Control", presented at the IEEE Powertech, Bucharest, Romania, 2009.
Market design:"A Survey of Frequency and Voltage Control Ancillary Services—Part II: Economic Features", IEEE Transactions on Power Systems, vol. 22 (1), pp. 358-366, February 2007.
44 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009
Transactions on Power Systems, vol. 22 (1), pp. 358-366, February 2007."Fundamental design issues in markets for ancillary services", The Electricity Journal, vol. 20 (6), pp. 26-34, July 2007.
Thesis:Y. Rebours, "A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services", PhD Thesis, Faculty of Engineering and Physical Sciences, The University of Manchester, Manchester, U.K., 2008. Available: http://www.eee.manchester.ac.uk/research/groups/eeps/publications/reportstheses/aoe/rebours_PhD_2008.pdf
Acknowledgments
Many thanks to all my colleagues who help me during this thesisSpecial thanks to:
Daniel Kirschen who supervised this thesisand Bruno Prestat who provided some slides presented here
45 - A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services - Y. Rebours - 2 October 2009