40
siemens.com/answers Restricted © Siemens AG 2013. All rights reserved siemens.com/answers Restricted © Siemens AG 2013. All rights reserved siemens.com/answers Restricted © Siemens AG 2013. All rights reserved Keynote Offshore Wind Power 02/12/2015 – Optiwind Siemens – Peter Koninckx

2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

  • Upload
    sirris

  • View
    608

  • Download
    1

Embed Size (px)

Citation preview

Page 1: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

siemens.com/answersRestricted © Siemens AG 2013. All rights reserved

siemens.com/answersRestricted © Siemens AG 2013. All rights reserved

siemens.com/answersRestricted © Siemens AG 2013. All rights reserved

Keynote Offshore Wind Power

02/12/2015 – Optiwind Siemens – Peter Koninckx

Page 2: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 2 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

Siemens at a glanceKey Figures 2014

Siemens AG Siemens Belgium-Luxemburg

Lead Country Bundle Belgium Lead Country Belgium

78“350‘ New Orders

71“920‘

343.000

Revenue

Employees

New Orders

Revenue

Employees

New Orders

Revenue

Employees

1“115‘487

1“917‘442

2.667

BeninBurkina FasoBurundiCamerounCentral African RepublicTchadCongoCongo, (RDC)Ivory CoastEquatorial GuineaGabonWestern Sahara

GambiaGuineaGuinea-BissauLiberiaMaliMauritaniaNigerRwandaSenegalSierra LeoneTogo

Algeria MoroccoTunisia

898‘

1“075‘

1.591

Figures in EUR

Huizingen

1.310

Export % of Revenue32%

Page 3: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 3 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

PositioningWell positioned in electrification, automation and digitalization

Page 4: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

siemens.com/answersRestricted © Siemens AG 2013. All rights reserved

siemens.com/answersRestricted © Siemens AG 2013. All rights reserved

siemens.com/answersRestricted © Siemens AG 2013. All rights reserved

Cost of Energy approach

Siemens Wind Power

Page 5: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 8 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

From an innovation point of view, Offshore wind hashad a steep technology development…

From 30 kW to 6 MW

in 30 years

6 MW450 kW30 kW

1980:11 meters

79.8 Meter

2012:

154 meters

A 380

1991:35 meters

projects are moving into

deeper water

and

further from shore

Page 6: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 9 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

…from an construction point of view,Offshore wind has been extremely successful

From 5 MW to 630 MW in 22 years

World‘s1stoffshorewind power

plant

5 MW

1991Vindeby

World‘s 1st

offshore windpower plant

w/MW turbines

40 MW

2000Middelgrunden

World‘s largestoffshore windpower plant in

operation

166 MW

2003Nysted

World‘s largestoffshore windpower plantin operation

630 MW

2013London Array

World‘s largestoffshore windpower plant in

operation

504 MW

2012GreaterGabbard

Wind farms scale has grown dramatically

Page 7: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 11 Nov. 2013 EMEA OF BD / Siemens Belgium

What is the challenge?to reduce the cost of electricity to pair other technologies ...

30-40%reduction

2012 2020-2025

Offshore windcompetitive with

CCGT

Unitcost/MWh

Nuclear CCGTOnshore CoalBiomassOffshorePV Solar

Page 8: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 12 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

Cost reduction is the key to ensure futurecompetitiveness of offshore wind power

Turbines

• Reduced part costs• Higher electricity yield• Industrialization

BoP/Foundations

• Standard-design• Industrial manufacturing• Scales of production

Grid connection

• Reduced complexity• Smaller platforms• Innovations

Operation & Service

• Durable parts• Less maintenance• Higher availability

The entire system needs to be tackled by cost reduction

Goal: reduction to < 10 euro cts/kWh by 2020 (FID*)

* Final Investment Decision

Page 9: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 13 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

A new yardstick is needed –Society‘s Costs of Electricity (SCOE)

Background

• Judging electricity sources only byLCOE stems from ages whereelectricity production was by definitionbig-scale and localized at load centers

• With new energy sources entering thescene, this approach falls short.

Objectives

• Analyze supplementary factors in additionto LCOE which affect the true cost ofelectricity on a macro-economic level

• Provide a comprehensive background forfact-based and objective decisions on thefuture energy mix

• Base all calculation on acknowledgedmethods

SocialImpact

Economy &employment

Geopoliticalrisks

Environmentalimpact

Transmissionneeds

Variabilitycompensation

TrueLCOE

Page 10: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 14 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

From a macroeconomic perspective wind energy withnatural gas as back-up is the least expensive option

Page 11: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

siemens.com/answersRestricted © Siemens AG 2013. All rights reserved

siemens.com/answersRestricted © Siemens AG 2013. All rights reserved

siemens.com/answersRestricted © Siemens AG 2013. All rights reserved

Optimising O&M Offshore Wind

Siemens Wind Power

Page 12: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 17 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

Market leader in the global offshore wind market

05

10152025

3035404550

'13 '14 '15 '16 '17 '18 '19 '20

TotalOtherSiemens

Global Offshore Market and Siemens Share (in GW and FY)

Page 13: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 18 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

Global footprint of Siemens Wind Power Service

Orlando, FLAmericas

Headquarters ServiceRenewables

Brande, DKHeadquarters Service Wind

SingaporeAsia-Pacific

Hamburg, DEEMEA

Newcastle, UKUK/Ireland

25 years of operational experience with O&M in offshore wind power

+4 GW of offshore wind power from more than 1 200 turbines

Partnerships with leading offshore wind power asset owners and investors

Page 14: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 19 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

Cost reduction is the key to ensure futurecompetitiveness of offshore wind power

Turbines

• Reduced part costs• Higher electricity yield• Industrialization

BoP/Foundations

• Standard-design• Industrial manufacturing• Scales of production

Grid connection

• Reduced complexity• Smaller platforms• Innovations

Operation & Service

• Durable parts• Less maintenance• Higher availability

The entire system needs to be tackled by cost reduction

Goal: reduction to < 10 euro cts/kWh by 2020 (FID*)

* Final Investment Decision

Page 15: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 20 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

Optimising O&M Offshore WindRemote Diagnostic Services

Page 16: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 21 Nov. 2013 EMEA OF BD / Siemens Belgium

Big data is the enabler for O&M efficiencies andinnovative products

80%of today’s data is

unstructured

90%of today’s data was captured

in the last two years

Big data is setting the scene

2011 2012 2013 2014

Value potential from big data

Improveperformance

Controlcomplexity

Improveflexibility

Source: IBM

Page 17: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 22 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

Advanced data integration enhances O&M and createsadditional value for offshore assets

Siemens ServiceTechnicians

Service & vesselplanning

Turbine upgrades

WTG availabilitywarranties

Energy forecasting

RiskManagement

3rd party weatherdata

Spares partsAdvanced RDS

Big data Field services Asset efficiency

Page 18: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 23 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

Remote Diagnostic ServicesAddressing minor issues before they develop into major ones

§ Wind Turbine Technical Support,WTC Support and SCADA Support

§ Remote technical support fortroubleshooting of Wind Turbinecomponents

§ Technical follow up utilizing globalfleet historical data

§ Remote software support on WTC(turbine controller), SCADA andnetwork for troubleshooting,maintenance and resolution

Diagnostic Support

§ 24/7/365 remote monitoring of turbines§ Alarm management by means of remote

resetting and restarting turbines§ Customer notification of events§ Remote monitoring and alarm

management of SCADA systems§ WPS (Wind Power Supervisor) user

administration§ 24/7 Remote Monitoring is the first

interface to our Vibration Diagnostic

24/7 Remote Monitoring

Page 19: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 24 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

Remote Diagnostic ServicesAddressing minor issues before they develop into major ones

§ Early detection of potential damages§ Predicitive methods used for preventive

repair and prevention of consequencialdamagages

§ Active and proactive vibration analysesperformed using global fleet data

§ Daily diagnostic reports are availablethrough Siemens Wind Dialogue CustomerPortal

§ Maintenance and updates of TCMconfiguration

Vibration Diagnostics§ Software Version Updates performed on

‒ Wind Turbine Controllers (WTC/STC)‒ SCADA System (WPS)‒ High Performance Park Pilot (HPPP)‒ Turbine Interface Computers (STIC)‒ TCM System (TMC Site Server and

M-System)§ Updated functionality§ Improvement, enhancements and bug fixes

Software Updates

Page 20: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 25 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

Siemens Remote Diagnostic Services is fueled bydata analytics that ensures top performance

Approximately 80% of the turbinealarms handled remotely led tono call out of technicians.

Approx. 400,000 cases are createdon Siemens turbines yearly, and theaverage response time is 10minutes on turbine alarms.

99,54% of all alarms handledwithin the first hour.

Largest offshore fleet in theindustry with the most offshore data.

Page 21: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 26 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

Optimising O&M Offshore WindMaritime & Aviation Solutions

Page 22: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 27 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

Efficient Access Solutions Delivered from Maritime &Aviation Experts

Project specific site input:

• Weather data, water depthand distance to travel etc.

• Turbine type and size• Contractual terms &

conditions• Logistics, technicians and

port details

Technical back bone:

• Turbine specifications• Proven service details• Know-how from monitoring &

diagnostics• 5,5 GW offshore experience

tracked in our databases• +20 years offshore service

experience

Output and results:

• Park availability• Weather downtime

calculations• Tailored solutions

for project logistics• Management

& shift patternsof serviceoperations

Page 23: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 28 Nov. 2013 EMEA OF BD / Siemens Belgium

Siemens Wind Farm Simulation Tool createscompetitive advantage for offshore site planning

Wind Farm Simulation ToolWhat it does

• Calculates optimal siteplanning based on likelyweather conditions

• Reduces overall costs• Improves customer

communication

How it works• Logistics support and

prioritization of multipleturbines

• Coordinate sailing route, fuelconsumption

• Inputs weather and financialmodel improvement

Visualization of simulation from tool

Page 24: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 29 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

• As offshore sites aremoving further fromshore, a variety of logisticoptions ensure timelyand safe O&M

• Minimizing customerprice is a key driver

• Ensures EHS highstandards

• Efficiencies fromstrategic partnershipsand extensive customerbase

Offshore Logistic Solutions customized for optimalsafety and customer value

Access System

Crew Transportation Vessel

Helicopter

Service Operation Vessel

Page 25: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 30 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

The Right Tool for the Right Task

Page 26: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 33 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

Service Operation Vessel - SOV

Development and design of SOVWe have designed and chartered 2new service operation vessels (SOV)aimed at efficient far shore and bigscaled service operations for longerperiods. First vessel supplied 2015 andfurther vessels are in the pipeline.

SOV operation specifications• Pax 40• Sign. wave height access : 2.3 m.• Cargo: 300sqm/8x 20 feet containers• Walk to work access systems• Comfortable accomodation for long

periods far-shore and big projects

Page 27: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 34 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

Benchmark Example of SOV vs. CTV Operations

40%

22%

CTV (146 days) SOV (80 days)

Example: Weather downtimecomparison for an offshore site

7 10

0

2

4

6

8

10

12

CTV SOV

Pre-Processing

Transit in / in field

Climbing within WTG / get ready toworkLunch

Effective working time

Transit out

Post-Processing

Less downtime - higher yield:

• Less weather downtime meansbetter use of working hours, lesstechnicians and fast responses

• Wind farm simulation tool andweather database integrated partof offerings

Efficient use of working hours:

• Less idling during transport meansmore efficient working time in theturbine and fewer technician hoursnecessary.

Page 28: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

siemens.com/answersRestricted © Siemens AG 2013. All rights reserved

siemens.com/answersRestricted © Siemens AG 2013. All rights reserved

siemens.com/answersRestricted © Siemens AG 2013. All rights reserved

Optimising Offshore GridConnection

Siemens Wind Power

Page 29: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 36 Nov. 2013 EMEA OF BD / Siemens Belgium

References for AC and DC Grid Access

194 MW 300 MW 504 MW

Largest Round 1wind farm

2009

Lynn Inner Dows

2010

Thanet

2010

Greater Gabbard

630 MW

2012

London Array

864/690 MW

2011

SylWin 1 / HelWin 2

270MW

2013

Lincs

Longest offshorecable

First multi-transformer offshore

wind farm

Ground breaking 2additional HVDC

Projects

First interconnectedoffshore network

World‘s largestcontracted offshore

wind park

900 MW

Market leading 5th

HVDC Platform

2014

BorWin 3400 MW

First collaborationProject

2013

Beatrice468 MW

First offshoreplatform in the US

2014

Cape Wind402 MW

2014

Dudgeon

First SuctionBucket Design.

576/800 MW

2010

HelWin 1 / BorWin 2

First HVDCOffshore Projects

576 MW

2012

Gwynt y Môr

First use of weight-saving design

Page 30: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 37 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

Evolution of the AC Offshore Platform

Architectural

Dry Tow – ‘Swimmingand Self Jacking

Containerised

OnshoreBarrow

Robbin Rig 1 & 2

Lillgrund

Gunfleet

Rodsand

London Array 1 & 2

Thanet, Galbbard Lincs

GYM 1 & 2

Arecleoch

SheringhamBaltic 1

Bard

Whathappens next

?

Page 31: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 38 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

Cost reduction is the key to ensure futurecompetitiveness of offshore wind power

Turbines

• Reduced part costs• Higher electricity yield• Industrialization

BoP/Foundations

• Standard-design• Industrial manufacturing• Scales of production

Grid connection

• Reduced complexity• Smaller platforms• Innovations

Operation & Service

• Durable parts• Less maintenance• Higher availability

The entire system needs to be tackled by cost reduction

Goal: reduction to < 10 euro cts/kWh by 2020 (FID*)

* Final Investment Decision

Page 32: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 39 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

PLATFORM AND T&IPrimary & Secondary Steel, Ancillaries, transport & installation

AC Offshore Grid ConnectionTypical cost distribution

NON-PLATFORM ELEMENTSHV/MV equipment, labour, cabling

RELATED TO THE ELECTRICAL

SUBSTATION COMPONENTS

LABOUR TO DESIGN, MANAGE AND

INSTALL

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

OF THE COST OF THE OFFSHORE

SUBSTATION IS RELATED TO THE

PLATFORM

Page 33: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 40 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

For significant cost savings in the grid access partwe need a paradigm shift!

HVAC

HVDC

Substation

1200 MW900MW

500MW

500MW

HVAC

HVDCCurrentSolution

NewSolution

Page 34: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 41 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

AC Offshore Grid ConnectionThe next step: the OTM (Offshore Transformer Module)

In 2014, we developed the OTM§ 3 times lighter§ Same Electrical capability§ Up to 40% cheaper than a traditional offshore

substations§ Back to basic, simple, essential design§ Share the foundation with a Wind turbine

Page 35: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 42 Nov. 2013 EMEA OF BD / Siemens Belgium

OTM – the new AC Grid Access SolutionFlexible solution to meet the needs of the wind farm

OTM with Enclosure on a Monopile

OTM on a Jacket OTM without WTG

OTM with Enclosure

Page 36: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 43 Nov. 2013 EMEA OF BD / Siemens Belgium

DC Offshore Grid AccesBorwin 3 – current design requires hughe logistics

Page 37: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 44 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

New Siemens DC Grid Acces SolutionMost important levers for reducing costs

Fully encapsulatedHV equipment1Passive androbust powerelectronics2Modular DiodeRectifier Unit3

• Reduction of requiredspace

• Simplified auxiliaryequipment

• No complex controlsystem

• High lifetime, low O&Mcosts

• 1200 MW power rating• Low losses

• Flexible offshoreinstallation options:e.g. central or distributed

Page 38: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 45 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

The new Siemens DC Grid Access Solutionis based on the Diode Rectifier Unit

Key features of the ModularDiode Rectifier Unit

• Encapsulated, rugged equipment

• Bio degradable and flame retardant

insulation

• Simple and robust power electronics

• Small platform with easy transport and

installation

• High reliability, minimal maintenance

• No offshore DC converter as single point

of failure

• Flexible offshore installation options due

to modular rectifier concept

Transformer Rectifier

Cooling

DCsmoothingreactors

Page 39: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 46 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

Benefits of the new DC Grid Access Solution

80%lower

topside volume

65%lower

topside weight

30%higher

transmissioncapacity

20%fewer

transmissionlosses

20%shorter

installationtime

30%lowercosts

Page 40: 2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-keynote siemens

Page 47 Nov. 2013 EMEA OF BD / Siemens Belgium Restricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reservedRestricted © Siemens AG 2013. All rights reserved

Peter Koninckx

Siemens S.A./N.V.RC-BE Power Generation & Large TransmissionGuido Gezellestraat 1231654 Beersel, BelgiumTel.: +32 253-62235Fax: +32 253-66900Mobile: +32 478550087mailto:[email protected]://www.siemens.be