Upload
jay-arthur
View
110
Download
0
Embed Size (px)
Citation preview
SPCSimplified
How to Plug the Leaks
In Your Cash Flow!
SPC Made EasyQuick Reference Card
For SPC Video© 2008 Jay Arthur
KnowWare® International, Inc. (dba Lifestar)2253 S. Oneida St., Ste 3D
Denver, CO 80224
(888) 468-1537 or (303) 756-9144(888) 468-1536 or (303) 753-9675 (fax)
Analyze Stability
Processes that are "out of control" need to bestabilized before they can be improved using theproblem-solving process. Special causes requireimmediate cause-effect analysis to eliminatevariation.
The following diagram will help you evaluate stabilityin any control chart. Unstable conditions can be anyof the following:
Various trends are also considered unstableconditions. For a complete list see qimacros.com/qiwizard/stability.html. Any of these conditionssuggests that an unstable condition may exist.Consider investigating the special cause of variation.The QI Macros automatically identify these for you.
Use the Ishikawa diagram to analyze potential rootcauses.
Once you've eliminated the special causes, you canturn your attention to using the problem solvingprocess to reduce the common causes of variation:
Analyze Capability
When Cp, the process capability index, and Cpk,the centering index, are over 1.0, the process iscapable, but most manufacturers requireCp>1.33.
Use the problem solving process to identify andprevent the root causes of waste (usually belowthe lower specification limit) and rework (usuallyabove the upper specification limit). The goal, isto reduce variation so that all of your points fitwithin the specification limits, clustered around atarget.
$3.00
CapableCp>1Cpk>1
Cpk Sigma1.0 31.33 41.66 52.0 6
BEFORE
AFTER
ProblemSolving
LowerSpecLimit
UpperSpecLimit
Waste ReworkTarget
876543210
1110
9876543210
LSL USL
LSL USL
Time to Install (Before)
Time to Install (After)
3σ
-3σ
-1σ
-2σ
2σ
1σ
SPCSIMPLIFIED
SPC Made Easy
Sustain the Improvement
Purpose: Stabilize and Sustain the Improvement
Key Tools
Flowchart: Show the flow of workthrough a process including allactivities, decisions, andmeasurement points.
Control Chart: Help analyze,sustain, and monitor the currentlevels of process stability and toidentify key issues for problemsolving or root cause analysis.
Histogram: Determine the capability(i.e., the level of performance thecustomers can consistently expect)of the process and the distribution ofmeasurable data.
Sustain The Improvement (Control)
FISH Step Activity
Focus 1 Refine the process
Define 2 Identify the critical to qualityMeasure indicators (CTQs)
Improve 3 Implement the critical to qualityAnalyze indicatorsImprove
Sustain 4 Check the process for stability andControl capability
Honor 5 Review, recognize, and refocus
CycleTime
Choosing The Right Chart
VariableDataTo automate these charts, try the QI Macrosfor Excel. Download a FREE 30 day trial at
www.qimacros.com/freestuff.html.
QI Macros Control Chart WizardThe QI Macros can analyze your data and
select and run the right control chart for you.
Defect Data
To learn more about SPC, consider our onehour training video: www.qimacros.com/
spc-simplified-training-video.html
QI MacrosSample Data
XbarS
XbarR
XmRIndividuals
u Chart
c Chart
p Chart
Variable(Measured)decimal: 1.3
Attribute(counted)
integer: 1,2
np Chart
DefectsPeopleEvents
More thanone defectper item
Defective Defective?Yes/No
How many defects?
Count Defective Items?
Count Number ofDefects Per Item
Services &Manufacturing
Manufacturing
Sample Size
Constantdefects/100
Varieswrong orders/ordersmedication errorsinfections/patient days
Constantinjuries/monthPatient falls/month
Varieserrors/orderscomponents/assembliesPatient falls/days
1length or weight per itemtime/projectcost/projectinfections/1000 patient days
2-5diameters, lengthstensile strengthresistance
6-25diameters, lengthstensile strengthresistance
Samples usedto analyze largeruns of product
Time Cost
$Weight
LengthH
eight
X X X
X
Ratesor Ratios?
Individuals
Sub groups
Sub groups