Presentation given at BIM Procurement and Practice for Collaboration Oxford in November 2013 by Professor John Lorimer, Local Government Liaison for the Government’s BIM Task Group and former Capital Programme Director of Manchester City Council sharing his experience of using Building Information Modelling (BIM) on the £95 million project to refurbish the Grade II* Manchester Central library About Collaboration Oxford: Through Collaboration Oxford, construction consultants The Clarkson Alliance, AKS Ward and Hoare Lea aim to help overcome the challenges of providing world class, low carbon buildings whilst preserving Oxfordshire’s heritage.
Citation preview
The Manchester Experience
Prof John Lorimer7th November 2013
BIM Steering Group(Strategic)
Corporate Technical Services
SchoolProgramme
FrameworkPartners
OldTown Hall
Housing
Highways FM
Corporate Property
ICT
Commercial
ProjectProgramme
Town HallComplex
TransformationProgramme
Commercial
Training Requirements
• Software applications• Training/workshops
ICT
• Software packages• Solibri
• Kykloud – lifecycle costs
Benefits
• Efficiency/cost savings• Accuracy
• Integration with project team
Benchmark
• Partners• Other public sector clients
• Government trends
Client/Project Requirements
• Budget management• Cost plan• Cash flow
• Life cycle cost
Ability to link to
Fire Risk Assessment
Ability to rerun
thermal model
Reactive maintenance
links
Cleaning schedules
and zones
Run logistical tests and models
Materials and
components selection
Evidence of works
completed(CERTS)
Known asbestos locations
Comms tool
InductionsCustomer.Marketing
Energy Management
system
Fabric & finishesAsset
register
3D Service routes M&E
Ability to
update the model and data
Specs and
supplier details
contact
StatutoryService
schedulesPPM
Zoning of building,
managing events
3D Duct routes,
drainage distribution
Ability to link to
thermal model
Condition survey
information
Fabric and
finishes PPM
Churn ManagementPlanning
BIM Model
Link to Concerto
MCCBMS
Room Data
sheets
M&EO&M (asset
register)
Life cycle replacement
programme
The Holy Grail
Concept Design
Scheme / Detailed Design
Pre-Construction
Construction
Operational /FM/Lifecycle
DesignDevelopment
Considering FM and
Operational requirements
FM / OperationalTeams
Embedded withinDesign
development
BIM Design and FM Integration
MCC : Cabinet Office BIM Workshops
MCC : Cabinet Office Soft Landings Workshop
ConcertoCOBie
COBie
-UK-20
12
Manual Data
Survey Data
EDMS
Content Management System
Building Management
System
Maintenance Management
Integration Head EndGranfen Control technologiesFire, security, bookings, etc…
Manchester Library ProjectBIM/Operational Data Architecture
Sept 2012 DRAFT ONLY v2
Design and Construction
Laing O’Rourke BIM Data
Transfer BIM Data beneficial to FM / Operational life of
Complex
Create and maintain an accurate repository
of Building assets
Operational Management of the
Complex.
Manchester Library ProjectBIM/Operational Data Architecture
ConcertoCOBie
CO
Bie
-UK
-201
2Manual Data
Survey Data
EDMS
Content Management System
Building Management
System
Maintenance Management
Integration Head EndGranfen Control technologiesFire, security, bookings, etc…
Manchester Library ProjectBIM/Operational Data Architecture
Sept 2012 DRAFT ONLY v2
Design and Construction
Laing O’Rourke BIM Data
Transfer BIM Data beneficial to FM / Operational life of
Complex
Create and maintain an accurate repository
of Building assets
Operational Management of the
Complex.
Transferring BIM data for operational use
Controlled approach to Handover
(Clarity of roles and responsibilities)
Involve end users / FM Team
POEEnvironmental /
energy performanceVisitor targets
Customer / staff satisfaction
Training and aftercare
Share risks and responsibilities
Focus on operational outcomes
Set performance Objectives
Environmental performanceMetering strategy
Energy assessment (POE)
Familiarisation and commissioning
Maturity LevelData Richness
Life Cycle Views
Roles or Disciplines
Business Process
Delivery Method
Timeliness/ResponseChange Management
Graphical Information
Spatial Capability
Information Accuracy
Interoperability/IFC Support
234
56
789
10
1
0