2014 Location Doha, Qatar Roof Products Kingzip SF Standing Seam System Wall Panels Flat Panel Finishes Metallic Silver Cream Hamad International Airport Doha, Qatar 1 Hamad International Airport

Hamad International Airport

Embed Size (px)

Citation preview

Page 1: Hamad International Airport

2014

Location Doha, Qatar

Roof ProductsKingzip SF Standing Seam System

Wall Panels Flat Panel

FinishesMetallic SilverCream

Hamad International Airport

Doha, Qatar 1

Hamad International Airport

Page 2: Hamad International Airport

2014 Hamad International Airport

Doha, Qatar 2

“Kingspan Insulated Panels LLC’s capabilities were a perfect fit to our requirements, and together, we have achieved a remarkable milestone in the history of aviation infrastructure development in the region.” Constantinos DemetriadesProject Director, ADCC

Page 3: Hamad International Airport

2014

Transforming a Vision

Located in Qatar, Hamad International Airport planned to become one of the Middle East’s new aviation hubs. The Hangar was designed to function as the central maintenance facility for Qatar Airways.

Kingspan’s Kingzip SF Standing Seam Roof System was chosen for this project and covers an impressive area of 98000m². The Kingzip SF sheets were used in a cover width of 400mm and coated in Metallic Silver.

3Hamad International Airport

Doha, Qatar

Page 4: Hamad International Airport

2014

Technical Challenges

There were many design and construction challenges that needed to be overcome during the installation of this project. It was critical that the panels installed were thermally efficient, fire resistant and weatherproof, especially during the summer months.

KingZip SF is an FM and UL approved, advanced ‘zip-up’ standing seam system that creates a continuous weathertight roof. The side laps are ‘zipped-up’ in conjunction with a unique halter system thatis fixed directly to the supporting structure without penetrating the external weather sheet. This method of secret fixing creates a structurally sound roof construction that provides excellent resistance to wind uplift.

4Hamad International Airport

Doha, Qatar

Page 5: Hamad International Airport

2014

Faster Construction

Kingzip SF can be manufactured on site using very long sheet lengths, significantly increasing the speed of construction. The sheets used on Hamad International Airport were 121 metres long, and enabled a swift and efficient construction.

The Flat panels installed on this project also increase the speed of construction. These panels can be quickly and easily installed and reduce build time by up to 50%.

5Hamad International Airport

Doha, Qatar

Page 6: Hamad International Airport

2014

Ultimate Flexibility

Kingzip SF can be supplied smooth, embossed, crimp curved, concave or convex smooth, curved, tapered, wave formed or tapered and smooth curved. For this project, the Kingzip SF was chosen to create the unique curves in the roof and to replicate the vision in the design brief. Kingzip SF is available in a variety of different finishes and Hamad International Airport were able to select a coating which perfectly suited the requirements of the project.

6Hamad International Airport

Doha, Qatar

Page 7: Hamad International Airport

2014

Sustainable Solutions

By using Kingspan’s Flat panels, there was less steelwork required for the construction of this project. These panels can achieve a green guide A+ rating and significantly reduce plant and lifetime operating costs for a company. They can also reduce carbon dioxide emissions by up to 40%.

7Hamad International Airport

Doha, Qatar

Page 8: Hamad International Airport

2014

Fire Safety

Both the Kingzip SF and Flat Panels installed are manufactured with a FIREsafe PIR insulation core and provides excellent performance in terms of fire safety and structural integrity.

8Hamad International Airport

Doha, Qatar

Page 9: Hamad International Airport

Be Inspired

To explore projects like this and many others, visit Kingspan’s 2016 Global Case Study Book at: http://bit.ly/29QCoZY

E-mail: [email protected]