C270 (HK BIODIESEL PLANT) Safety Report
Month: Apr 2012 May 2012Total Accumulated man-hour: 167,151 201,951Man-hour without lost time injury: 167,151 201,951Days worked since project commenced: 173 204Days since last Time lost accident : N/A N/ACumulative Accident Frequency Rate: 0 % 0 %
Safety is everyone’sResponsibility.
You are an important stakeholder !
SAFETY STATISTICS
SAFETY INSPECTION / MEETING
Physical site safety walks Weekly Safety Meetings
HOUSEKEEPINGStorage of equipment close to floor edge
Improvement – equipment stored at safe distant from floor edge
PROMPT RECTIFICATION
AREA NEED IMPROVEMENT
HOUSEKEEPINGSharp end of reinforce bar prone to bodily injury
Improvement – sharp end of reinforce bar protected by reused plastic bottle
PROMPT RECTIFICATION
AREA NEED IMPROVEMENT
ELECTRIC SHOCK HAZARDNo safety warning sign and information of responsible electrician
Improvement – safety warning and name and contact no. of responsible electrician clearly displayed
PROMPT RECTIFICATION
AREA NEED IMPROVEMENT
POSITIVE POINTERS
All workers using safety harness attached to safe anchorage points at work
Team work / Signal man deployed for safe lifting work
POSITIVE POINTERS
Provision of safe access and safety sign Provision of safe working platform for working at height
SAFETY TRAINING
INDUCTION
TRAINING
Site Specific Safety Induction
Current MonthAccumulate
(Oct 2011 – May 2012)
No. of class 19 142
No. of Attendee 84 712
TOOL BOX TALKTRAININGSAFETY TRAINING
Topic No. of attendee
Occupational Safety Prevention of Slip & Trip 66 nos.
Occupational Safety Site Housekeeping 38 nos.
Occupational Safety Accident Reporting 63 nos.
Occupational Safety Emergency Procedures 71 nos.
Occupational Safety Safe Use of Ladder 64 nos.
Current Month Total 305 nos.
Accumulated Total : 1,724 nos.
GUEST VISIT
Introduction seminar held by Project Director and Project Manager
Visitors accompanied by Project Management Team
NO reported injury accident recorded in May 2012; all subcontractors reported neither site accident nor dangerous occurrence happened in their subcontracted responsible area at the Weekly Safety Meetings with CHEC / AECOM / Jacob.
GOVERNMENT / AUTHORITIES VISIT
BD conduct testingBD inspection on 17/5/2012
Safety & Health Audit – at interval of every 6 months by Independent Registered Safety Auditor
Environmental Monitoring – monthly by Independent Environmental Checker
Environmental Audit – at interval of every 6 months by CHEC Environmental Officer
SAFETY & HEALTH & ENVIRONMENTAL ASSURANCE
Environmental Audit conducted by Independent Environmental Checker on 22/5/2012
Safety Audit conducted by Independent Safety Auditor on 15/5/2012