8/11/2019 Monthly Safety Report June 2014
1/10
Pavilion Hilltop, Month Kiara Safety Report
Monthly Safety Report
June 2014
8/11/2019 Monthly Safety Report June 2014
2/10
Safety is all
responsibility
S FETY ST TISTICS
Monthly Safety Report
June 2014
June 2014 July 2014
Accumulated Man-hour 310 n/a
Days worked from Commencement 30 n/a
Total man-hours as from 1st June 2014 310 n/a
Cumulative Accident Frequency Rate 0 n/a
http://hk.image.search.yahoo.com/images/view;_ylt=A8tUwJkihcpQvCgAreC1ygt.;_ylu=X3oDMTBlMTQ4cGxyBHNlYwNzcgRzbGsDaW1n?back=http%3A%2F%2Fhk.image.search.yahoo.com%2Fsearch%2Fimages%3Fp%3Dsafety%26n%3D30%26ei%3Dutf-8%26y%3D%25E6%2590%259C%25E5%25B0%258B%26fr%3DFP-tab-img-t%26tab%3Dorganic%26ri%3D19&w=1200&h=798&imgurl=us.123rf.com%2F400wm%2F400%2F400%2Fmiluxian%2Fmiluxian1108%2Fmiluxian110800329%2F10422563-health-and-safety.jpg&rurl=http%3A%2F%2Fwww.123rf.com%2Fphoto_10422563_health-and-safety.html&size=183.1+KB&name=Health+And+%3Cb%3ESafety%3C%2Fb%3E+Royalty+Free+Stock+Photo%2C+Pictures%2C+Images+And+Stock+...&p=safety&oid=c1d307dcdc85895ac8187d0650baec1c&fr2=&fr=FP-tab-img-t&tt=Health%2BAnd%2B%253Cb%253ESafety%253C%252Fb%253E%2BRoyalty%2BFree%2BStock%2BPhoto%252C%2BPictures%252C%2BImages%2BAnd%2BStock%2B...&b=0&ni=72&no=19&ts=&tab=organic&sigr=11q8f1i0s&sigb=13slf07r9&sigi=131lhfsu2&.crumb=sSqmqh9/ZuY8/11/2019 Monthly Safety Report June 2014
3/10
S FETY INSPECTION
Physical site safety walks
Monthly Safety Report
June 2014
Worker accommodation inspection Block B inspection
Block B inspection Block B inspection
8/11/2019 Monthly Safety Report June 2014
4/10
RE NEED IMPROVEMENT
Monthly Safety Report
June 2014
HOUSEKEEPINTNo specific place to throw rubbish
PROMPT RECTIFICATION
Improvement Dumpster had beenlocate near cabin and roller dustbinlocate at construction place.
8/11/2019 Monthly Safety Report June 2014
5/10
RE NEED IMPROVEMENT
PROMPT RECTIFICATION
Personal protective equipmentWorking without safety shoes
Improvement Construction workerhad been given safety shoes andsafety helmet.
Monthly Safety Report
June 2014
8/11/2019 Monthly Safety Report June 2014
6/10
RE NEED IMPROVEMENT
PROMPT RECTIFICATION
HoardingCabin and material are not protect.Some location are not barricadeprobably and expose to public.
Improvement Upgrading hoarding hadbeen made to protect our material.
Monthly Safety Report
June 2014
8/11/2019 Monthly Safety Report June 2014
7/10
S FETY TR INING
Site Specific SafetyInduction
AttendantAccumulate
(Jun 2014 Jun 2014)
Safety Induction 5 5
Toolbox Talk 3 3
INDUCTIONTALK
Monthly Safety Report
June 2014
8/11/2019 Monthly Safety Report June 2014
8/10
TOOL BOX TALKTopic
Topic
Safety Proper use of PPE
Safety Emergency evacuation
Environmental Dust control
Safety Workplace housekeeping
Safety Handling of machineries
Monthly Safety Report
June 2014
8/11/2019 Monthly Safety Report June 2014
9/10
S FETY Promotion Planning
Safety Talk / Tool Box meeting for workers are conducted
Monday at 0800.
Signage/ Posters are placed at various locations at the site.
Bi-weekly EHS Department meeting is held on Tuesday.
Weekly Awareness Training conduct every Wednesday.
GOTONG ROYONG campaign is carried out every
month.
Safety Promotional Article
Monthly Safety Report
June 2014
DONE
8/11/2019 Monthly Safety Report June 2014
10/10
Monthly Safety Report
June 2014