Evanston Public Works March 26, 2012
STREETSCAPE PROJECTCONCEPT PLANS
DODGE AND LAKE
CHURCH STREET
ORRINGTON AVENUE
Evanston Public Works March 26, 20122
Dodge and Lake Streetscape Project
♦Limits of the Project♦Dodge Avenue and Lake Street Intersection
♦Southeast corner
♦Develop Plaza with Streetscape Concept
♦Bus Shelter
♦Seating Wall
Evanston Public Works March 26, 20123
Design Elements – Existing Dodge & Lake
North
Evanston Public Works March 26, 20124
Design Elements – Proposed Dodge & Lake
North
Evanston Public Works March 26, 20125
Craig’s visual for this area goes here
Dodge and Lake Visual
Evanston Public Works March 26, 20126
Craig’s visual for this area goes here
Dodge and Lake Visual
Evanston Public Works March 26, 20127
Craig’s visual for this area goes here
Dodge and Lake Visual
Evanston Public Works March 26, 20128
“Green” Elements• Porous Concrete Sidewalk• Rain Gardens• Reuse of brick pavers in wall construction
Project Schedule• Project to be let in April
• Construction mid June to mid August (during high school summer break)
Design Elements
Evanston Public Works March 26, 20129
A rain garden catches rainfall and storm water runoff. The water is filtered and cleaned as it passes through the soil. This helps reduce
water pollution.
Design Elements – Rain Garden
Evanston Public Works March 26, 201210
Church Street Streetscape Project
♦Limits of the Project♦Dodge to Ridge (Paving up to Ashland)♦Ridge to Chicago
♦Sidewalk Brick Replacement ♦Protected Bike Path♦Bike Shelter♦Sidewalk Furniture♦Pedestrian Lighting
Evanston Public Works March 26, 201211
Public Works/Engineering staff presented the proposed improvements at:First ward meeting
Second ward meeting
Fifth ward meeting
Downtown Evanston meeting Discussed improvements with Fourth Ward
Alderman
Public Coordination
Evanston Public Works March 26, 201212
Design Elements – Existing - Church/Dodge
North
Evanston Public Works March 26, 201213
Design Elements – Proposed – Church/Dodge
North
Evanston Public Works March 26, 201214
Design Elements – Resurfacing & Streetscape
Evanston Public Works March 26, 201215
Design Elements - Resurfacing
Evanston Public Works March 26, 201216
Design Elements - Resurfacing
Evanston Public Works March 26, 201217
Design Elements – Resurfacing
Evanston Public Works March 26, 201218
Design Elements – Resurfacing & Streetscape
Evanston Public Works March 26, 201219
Design Elements – Resurfacing & Streetscape
Evanston Public Works March 26, 201220
Design Elements – Resurfacing & Streetscape
Evanston Public Works March 26, 201221
Design Elements – Existing
Evanston Public Works March 26, 201222
Design Elements – Resurfacing & Streetscape
Evanston Public Works March 26, 201223
Church Street Bike Path Color Results
45%
20%
14%
13%
8%Jade
Diamantina
Turquoise
Green
Tan
Bike Path Color
Jade Diamantina Turquoise Green Tan
296 136 95 87 55
Design Elements – Bike Path
Bike Path Markers
Evanston Public Works March 26, 201224
Craig’s visual for this area goes here
Church and Orrington Visual
Evanston Public Works March 26, 201225
Craig’s visual for this area goes here
Church and Orrington Visual
Evanston Public Works March 26, 201226
Craig’s visual for this area goes here
Church and Orrington Visual
Evanston Public Works March 26, 201227
Design Elements – Street Furniture
Evanston Public Works March 26, 201228
Design Elements – Street Furniture
Evanston Public Works March 26, 201229
Design Elements – Street Furniture
Evanston Public Works March 26, 201230
“Green” Elements
• Reuse of brick pavers
• Rain gardens around trees and in plaza area at Orrington
• LED Pedestrian Lighting
Evanston Public Works March 26, 201231
Project Schedule
Church Street – Dodge to AshlandProject to be let in April combined with Dodge & Lake Intersection StreetscapeConstruction mid June to mid August
Church Street – Ridge to ChicagoProject to be let in JuneConstruction August to October
Evanston Public Works March 26, 201232
Construction Staging – Ridge to Chicago
Roadway work – maintain one traffic lane east bound on Church at any time
Streetscape – North side (two Blocks under construction only at any given time)
Maintain pedestrian access by stage construction – half of the sidewalk width & bridges to the businesses.
South side streetscape to follow
Evanston Public Works March 26, 201233
Construction Staging – Ridge to Chicago
Two blocks under construction only at any given time
Maintain pedestrian access by stage construction – half of the sidewalk width & bridges to the businesses.
Evanston Public Works March 26, 201234
Orrington Ave - Streetscape Project
♦Limits of the project Church Street to Davis Street
East side only
♦Sidewalk brick replacement
♦Street Furniture
♦Bike Shelter
♦Pedestrian Lighting
Evanston Public Works March 26, 201235
Project Schedule
Project to be let in JuneConstruction – September to October
Evanston Public Works March 26, 201236
2013 and Beyond
• Complete bike path connection on Church to the Lakefront Bike Path and McCormick Bike Path
• Complete Davis Street Streetscape, Street Resurfacing and west bound Protected Bike Path
• Complete Main Street Streetscape Improvement and Resurfacing
• Identify other streets for protected bike path
• Continue streetscape enhancements city-wide
Evanston Public Works March 26, 201237