Evanston Public Works March 26, 2012

STREETSCAPE PROJECTCONCEPT PLANS

DODGE AND LAKE

CHURCH STREET

ORRINGTON AVENUE

Page 2: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 20122

Dodge and Lake Streetscape Project

♦Limits of the Project♦Dodge Avenue and Lake Street Intersection

♦Southeast corner

♦Develop Plaza with Streetscape Concept

♦Bus Shelter

♦Seating Wall

Page 3: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 20123

Design Elements – Existing Dodge & Lake

North

Page 4: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 20124

Design Elements – Proposed Dodge & Lake

North

Page 5: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 20125

Craig’s visual for this area goes here

Dodge and Lake Visual

Page 6: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 20126

Craig’s visual for this area goes here

Dodge and Lake Visual

Page 7: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 20127

Craig’s visual for this area goes here

Dodge and Lake Visual

Page 8: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 20128

“Green” Elements• Porous Concrete Sidewalk• Rain Gardens• Reuse of brick pavers in wall construction

Project Schedule• Project to be let in April

• Construction mid June to mid August (during high school summer break)

Design Elements

Page 9: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 20129

A rain garden catches rainfall and storm water runoff. The water is filtered and cleaned as it passes through the soil. This helps reduce

water pollution.

Design Elements – Rain Garden

Page 10: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201210

Church Street Streetscape Project

♦Limits of the Project♦Dodge to Ridge (Paving up to Ashland)♦Ridge to Chicago

♦Sidewalk Brick Replacement ♦Protected Bike Path♦Bike Shelter♦Sidewalk Furniture♦Pedestrian Lighting

Page 11: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201211

Public Works/Engineering staff presented the proposed improvements at:First ward meeting

Second ward meeting

Fifth ward meeting

Downtown Evanston meeting Discussed improvements with Fourth Ward

Alderman

Public Coordination

Page 12: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201212

Design Elements – Existing - Church/Dodge

North

Page 13: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201213

Design Elements – Proposed – Church/Dodge

North

Page 14: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201214

Design Elements – Resurfacing & Streetscape

Page 15: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201215

Design Elements - Resurfacing

Page 16: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201216

Design Elements - Resurfacing

Page 17: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201217

Design Elements – Resurfacing

Page 18: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201218

Design Elements – Resurfacing & Streetscape

Page 19: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201219

Design Elements – Resurfacing & Streetscape

Page 20: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201220

Design Elements – Resurfacing & Streetscape

Page 21: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201221

Design Elements – Existing

Page 22: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201222

Design Elements – Resurfacing & Streetscape

Page 23: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201223

Church Street Bike Path Color Results

45%

20%

14%

13%

8%Jade

Diamantina

Turquoise

Green

Tan

Bike Path Color

Jade Diamantina Turquoise Green Tan

296 136 95 87 55

Design Elements – Bike Path

Bike Path Markers

Page 24: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201224

Craig’s visual for this area goes here

Church and Orrington Visual

Page 25: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201225

Craig’s visual for this area goes here

Church and Orrington Visual

Page 26: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201226

Craig’s visual for this area goes here

Church and Orrington Visual

Page 27: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201227

Design Elements – Street Furniture

Page 28: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201228

Design Elements – Street Furniture

Page 29: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201229

Design Elements – Street Furniture

Page 30: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201230

“Green” Elements

• Reuse of brick pavers

• Rain gardens around trees and in plaza area at Orrington

• LED Pedestrian Lighting

Page 31: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201231

Project Schedule

Church Street – Dodge to AshlandProject to be let in April combined with Dodge & Lake Intersection StreetscapeConstruction mid June to mid August

Church Street – Ridge to ChicagoProject to be let in JuneConstruction August to October

Page 32: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201232

Construction Staging – Ridge to Chicago

Roadway work – maintain one traffic lane east bound on Church at any time

Streetscape – North side (two Blocks under construction only at any given time)

Maintain pedestrian access by stage construction – half of the sidewalk width & bridges to the businesses.

South side streetscape to follow

Page 33: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201233

Construction Staging – Ridge to Chicago

Two blocks under construction only at any given time

Maintain pedestrian access by stage construction – half of the sidewalk width & bridges to the businesses.

Page 34: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201234

Orrington Ave - Streetscape Project

♦Limits of the project Church Street to Davis Street

East side only

♦Sidewalk brick replacement

♦Street Furniture

♦Bike Shelter

♦Pedestrian Lighting

Page 35: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201235

Project Schedule

Project to be let in JuneConstruction – September to October

Page 36: Streetscape presentation final 3.26.12

Evanston Public Works March 26, 201236

2013 and Beyond

• Complete bike path connection on Church to the Lakefront Bike Path and McCormick Bike Path

• Complete Davis Street Streetscape, Street Resurfacing and west bound Protected Bike Path

• Complete Main Street Streetscape Improvement and Resurfacing

• Identify other streets for protected bike path

• Continue streetscape enhancements city-wide

Page 37: Streetscape presentation final 3.26.12