Prepared by LEA Consulting Ltd. 1 2016-03-23 PUBLIC MEETING #1: Steeles Avenue East Bridge Environmental Assessment “Keeping Steeles Moving”

Steeles Avenue East Bridge Study PIC 1

Embed Size (px)

Citation preview

Page 1: Steeles Avenue East Bridge Study PIC 1

Prepared by LEA Consulting Ltd. 1 2016-03-23

PUBLIC MEETING #1: Steeles Avenue East

Br idge Environmenta l

Assessment

“ K e e p i n g S t e e l e s M o v i n g ”

Page 2: Steeles Avenue East Bridge Study PIC 1

2

Introduction (Project Team)

Project lead:

In partnership with:

2016-03-23

Page 3: Steeles Avenue East Bridge Study PIC 1

Agenda

1. Introduction

2. Study Context

3. Environmental Assessment Process

4. Study Purpose

5. Existing Conditions

6. Alternative Solutions

7. Evaluation Matrix

8. Preliminary Preferred Alternative

9. Next Steps (Alternative Designs, Construction Staging Plan)

10. Question and Answer

3 2016-03-23

Page 4: Steeles Avenue East Bridge Study PIC 1

Introduction (Context)

What is the study area?

• Rail crossing of Steeles Avenue East between Kennedy Road and Midland Avenue

4 2016-03-23

Page 5: Steeles Avenue East Bridge Study PIC 1

Introduction (Related Metrolinx Projects)

What else is going on in the area?

• Increased service along the Stouffville GO Rail Corridor

• Adding of a second track in the rail corridor between Unionville GO Station and south of Kennedy GO Station

• Improvements to the Milliken GO Station and surrounding area

• Potential electrification of Stouffville GO Rail Corridor

5 2016-03-23

Page 6: Steeles Avenue East Bridge Study PIC 1

Introduction

What else is going on in the area?

Milliken Centre Secondary Plan*

Midland Avenue Extension EA

Redlea Ave Extension EA

McNicoll Bus Garage

Steeles-Redlea

Regeneration Area Study Metrolinx Milliken GO Station

Project and Station Area Plan

Silver Star Blvd Extension EA

6 2016-03-23

Note: * study boundaries subject to change during

the Secondary Plan review process

Page 7: Steeles Avenue East Bridge Study PIC 1

Introduction (Study Process)

What is an Environmental Assessment?

• Decision making process used by the City when studying road and other infrastructure projects

• Ensures potential environment, heritage and social impacts of the project are evaluated

• Separated into phases that require the project to be considered in increasing levels of detail

7 2016-03-23

Page 8: Steeles Avenue East Bridge Study PIC 1

Introduction (Problem / Opportunity)

Why is this study needed?

• Identified in past studies for improvement

• Potential for conflicts between vehicles and train traffic is expected to increase with future volumes

• Sidewalks, bike lanes, and the number of traffic lanes are inconsistent along Steeles Avenue East

• Transit service is limited by congestion in the area

8 2016-03-23

Page 9: Steeles Avenue East Bridge Study PIC 1

Introduction (Problem / Opportunity)

What will be considered in this study?

• Reducing delay for motorists and transit users

• Supporting transit service improvements

• Better accommodating all users along and across Steeles Avenue East

• Improving streetscape/public realm

• Improving safety for all users

9 2016-03-23

Page 10: Steeles Avenue East Bridge Study PIC 1

Existing Conditions (Transportation)

How do people get around?

• Significant amount of people take transit

• Many people walk and cycle to area transit stops

• Cyclists often feel more comfortable on the sidewalk than on the road

• Vehicle traffic is congested through the four-lane section of Steeles Avenue East

• Vehicle queue lengths at intersections are significant during the peak hours

10 2016-03-23

Page 11: Steeles Avenue East Bridge Study PIC 1

Existing Conditions (Municipal Servicing / Utilities)

What utilities need to be accommodated?

• City of Toronto and City of Markham • Watermains • Storm Sewers • Sanitary Sewers

• Bell Canada

• Rogers

• Enbridge Gas

• Toronto Hydro

11 2016-03-23

Page 12: Steeles Avenue East Bridge Study PIC 1

Existing Conditions (Environment)

What is the natural environment in the area?

• Plants and vegetation are non-native and generally used for landscaping

• No significant wildlife habitats were found

• No Provincially Significant Wetlands, Areas of Scientific Interest, or Environmentally Significant / Sensitive Areas

12 2016-03-23

Page 13: Steeles Avenue East Bridge Study PIC 1

Existing Conditions (Built / Cultural Heritage)

What built / cultural heritage is in the area?

• No buildings or structures in the immediate area along Steeles Avenue East were identified as heritage properties

• Outside of the immediate area 73 Old Kennedy Road and 4600 Steeles were identified as heritage properties

• The Stouffville GO Rail Corridor was identified as potentially having heritage value

13 2016-03-23

Page 14: Steeles Avenue East Bridge Study PIC 1

Existing Conditions (Archaeological)

What are the archaeological interests in the area?

• Area developed as agricultural homesteads within the hamlet of Milliken

• No archaeological sites were found near the study area, while two (2) sites were found within 1km

• Recent development has removed any archaeological potential in the area

Historical Atlas of the County of York (Miles & Co., 1878)

14 2016-03-23

Page 15: Steeles Avenue East Bridge Study PIC 1

Alternative Solutions (Option 1)

• Option 1: Do Nothing • Maintain existing condition • Crossing at-grade with a 4 lane cross-section • Baseline for comparison

15 2016-03-23

Page 16: Steeles Avenue East Bridge Study PIC 1

Alternative Solutions (Options 2a & 2b)

• Overpass Options 2a: 4-Lanes and 2b: 6-Lanes • Steeles Avenue East Over the Rail Corridor

* Additional land required for bridge, other infrastructure and utilities to be further assessed in a subsequent phase of the EA Study

16 2016-03-23

Page 17: Steeles Avenue East Bridge Study PIC 1

Alternative Solutions (Options 3a & 3b)

• Underpass Options 3a: 4-Lanes and 3b: 6-Lanes • Steeles Avenue East Under the Rail Corridor

* Additional land required for bridge, other infrastructure and utilities to be further assessed in a subsequent phase of the EA Study

17 2016-03-23

Page 18: Steeles Avenue East Bridge Study PIC 1

Evaluation Matrix

The following criteria were evaluated:

Land Use and Socio-Economic Impact

Archaeology / Built and Cultural Heritage

Traffic Congestion

Transit

Active Transportation

Natural Environment

Streetscape/Public Realm

Structural Engineering

Municipal Servicing

Cost

5-LEVEL SCALE

Rating of 5 best addresses problem/opportunity statement, may or may not have impacts

Rating of 4 best addresses problem/opportunity statement, may have some impacts

Rating of 3 somewhat address problem/opportunity statement OR has no impacts and does

not address the problem/opportunity statement

Rating of 2 does not address problem/opportunity statement and has significant impacts

Rating of 1 does not address problem/opportunity statement and has most impacts

◕ ●

18 2016-03-23

Page 19: Steeles Avenue East Bridge Study PIC 1

Evaluation Matrix (Land Use and Socio-Economic Impact)

Evaluation Criteria included:

• Property required o Temporary requirement needed for construction activities o Permanent requirement needed for road widening, bridge structure, and

utility relocation

• Impacts to existing / planned land uses

• Impacts to driveways o Relatively less impact for all driveways with the underpass option

19 2016-03-23

Page 20: Steeles Avenue East Bridge Study PIC 1

Evaluation Matrix (Archaeology / Built and Cultural Heritage)

Evaluation Criteria included • Impact on known features • Impact on areas/resources of potential

20 2016-03-23

Page 21: Steeles Avenue East Bridge Study PIC 1

Evaluation Matrix (Natural Environment)

Evaluation Criteria included

• Impact to area ecology

• Affect on designated natural areas

• Impact on the tree inventory

• Change in vehicle emission levels o Greater improvement as a result of reduced traffic delay when widened to 6-

lanes

• Change in noise levels

21 2016-03-23

Page 22: Steeles Avenue East Bridge Study PIC 1

Evaluation Matrix (Traffic Congestion)

Evaluation Criteria included

• Impact on intersection levels of service o 6-lane options provide the greatest improvement to traffic flow

• Impact on convenience and connectivity o Underpass will have less impacts to connectivity

• Impact on safety and comfort o Conflicts at the GO Train Corridor are removed with the grade separation

22 2016-03-23

Page 23: Steeles Avenue East Bridge Study PIC 1

Evaluation Matrix (Transit)

Evaluation Criteria included

• Impact on convenience and connectivity o Improved flow along Steeles Avenue East by removing conflicts at the rail

corridor and greater potential direct links to existing transit routes with an underpass

• Impact on safety and comfort

o Reduced conflicts and improved reliability

23 2016-03-23

Page 24: Steeles Avenue East Bridge Study PIC 1

Evaluation Matrix (Active Transportation)

Evaluation Criteria included

• Accommodation of desired travel paths o A dedicated (bridge or tunnel) north-south connection can be

accommodated with both over and underpass options at the rail corridor

• Impact on convenience and connectivity o Greater potential connectivity for the underpass

• Impact on safety and comfort o Potential physical separation between vehicles and pedestrians/cyclists with

the underpass

24 2016-03-23

Page 25: Steeles Avenue East Bridge Study PIC 1

Evaluation Matrix (Streetscape/Public Realm)

Evaluation Criteria included

• Accommodation of streetscaping/public realm improvements o 4-lane options provide more room for trees, lighting, and street furniture,

while the overpass creates a visual barrier between north and south of Steeles Avenue East

• Consistency with Complete Streets Principles

o 6-lane options increase crossing distances for pedestrians and reduce space for streetscape opportunities

25 2016-03-23

Page 26: Steeles Avenue East Bridge Study PIC 1

Evaluation Matrix (Structural Engineering)

Evaluation Criteria included

• Constructability / Staging o Less impact during construction with 4-lane options

• Soil Excavation / Fill o Underpass options require excavation between 40,000 – 50,000 cubic metres o Overpass options require between 100,000 – 120,000 cubic metres of fill

• Maintenance requirements o Underpass options require more maintenance due to the pumping station

• Appearance

26 2016-03-23

Page 27: Steeles Avenue East Bridge Study PIC 1

Evaluation Matrix (Municipal Servicing)

Evaluation Criteria included

• Potential for Utility Relocations

• Accommodation of storm events o 6-lane options will have an increased amount of non-permeable surfaces

(e.g. concrete, asphalt) o Underpass options will require a pumping station for drainage

• Accommodation of future sanitary needs o No option precludes the opportunity to upsize the sanitary sewers

27 2016-03-23

Page 28: Steeles Avenue East Bridge Study PIC 1

Evaluation Matrix (Cost)

Evaluation Criteria included

• Potential construction costs

• Potential operating / maintenance costs

• Cost 4-lane Overpass: $ 33.75 Million 6-lane Overpass: $ 36.25 Million 4-lane Underpass: $ 24.75 Million 6-lane Underpass: $ 27.25 Million

Note: costs do not include utility relocations, property requirements, road and rail detour, etc. these costs will be further assessed in a subsequent phase of the EA Study

* Additional land required for bridge, other infrastructure and utilities to be further assessed in a subsequent phase of the EA Study

28 2016-03-23

Page 29: Steeles Avenue East Bridge Study PIC 1

Evaluation Matrix

Highlights of the Evaluation Matrix is illustrated on the board Alternative Solutions

Do Nothing Overpass – Road over Rail Underpass – Road under Rail

Option 1: 4-lane Option 2a: 4-lane Option 2b: 6-lane Option 3a: 4-lane Option 3b: 6-lane

Land Use and Socio-Economic Impact ◐ ○ ○ ◔ ◔

Archaeology / Built and Cultural Heritage ◐ ◐ ◐ ◐ ◐

Natural Environment ◐ ◕ ● ◕ ● Traffic Congestion ○ ◔ ◕ ◐ ●

Transit ○ ◐ ● ◐ ● Active Transportation ○ ◕ ◕ ● ●

Streetscape/Public Realm ◐ ◔ ○ ● ◕ Structural Engineering ◐ ○ ○ ◔ ◔

Municipal Servicing ◐ ◕ ◐ ◔ ○ Cost ● ◔ ○ ◕ ◐

Overall Rating ○ ◔ ◐ ◕ ●

29 2016-03-23

Page 30: Steeles Avenue East Bridge Study PIC 1

Preliminary Preferred Alternative

The preferred alternative is Option 3b: 6-lane underpass The 6-lane underpass option provides improvements in the following areas identified in the problem and opportunity statement:

• Remove train and vehicle conflicts

• Improve roadway inconsistency and lack of active transportation facilities

• Reduce delay for all road users

• Support transit expansions and Regional Express Rail

• Accommodate east-west and north-south flows for all street users

• Improve safety for all modes of transportation

Alternatives Do Nothing Road Over Rail [Overpass] Road Under Rail [Underpass]

Option 1: 4-lane Option 2a: 4-lane Option 2b: 6-lane Option 3a: 4-lane Option 3b: 6-lane

Overall Rating ○ ◔ ◐ ◕ ●

30 2016-03-23

Page 31: Steeles Avenue East Bridge Study PIC 1

Preliminary Preferred Alternative Solution

31 2016-03-23

Page 32: Steeles Avenue East Bridge Study PIC 1

Next Steps

Confirm Preferred Alternative Solution after PIC #1 Alternative Designs (Summer/Fall) • Determine bridge foundation type • Refine bridge design • Determine cross-section along corridor and utility relocations • Refine multi-use ramp • Refine cost estimate

Construction Staging Plan (Fall) • Determine road and rail detours based on bridge design and construction

requirements • Develop a construction staging plan

Public Information Centre #2 • Fall 2016

32 2016-03-23

Page 33: Steeles Avenue East Bridge Study PIC 1

Thank You! Please provide any comments to Maogosha Pyjor by April 8th, 2016.