Stages In Construction
StagesReport Stage or Briefing Stage
Designing Stage
Tendering Stage
Construction Stage
Commissioning Stage
Briefing StagePurpose :-
Requirements of owner regarding Project
Provide a likely estimate of costs
Activities :-
To appoint a project steering committee
Technical Investigation such as Landand Geological survey
Non-technical Investigation such as Economic and Social factors
Designing StageA detailed cost estimate of the project
can be prepared during this stage
Purpose :-
Complete the Project Summary
Determine method of Construction
Preparation of Drawing Specifications
Decide Project Cost
Activities :-
Prepare detailed design and drawing
Prepare detailed specifications
Decide cost of project
Develop the project summary
Tendering StagePurpose :-
The purpose of this stage is to appoint a contractor who will undertake the construction work on the most suitable terms and conditions of quality and cost
Activities :-
To invite tenders from the contractors for the construction work and award the contract
To prepare contract document, to be signed by the client and the contractor
Construction StageThis stage involves the execution of
construction work as per the design, drawing and within agreed limits of time, cost and specified quality
Activities :- Preparation of : - Construction schedule
- Manpower schedule
- Plant and Machinery schedule
- Material delivery schedule
Control of : - Supply of materials and equipments
- supervision for quality control
- Supply of necessary drawings
- co-ordination among sub-contractors
Commissioning StagePurpose :-
It is the stage in which the performance of the structure is evaluate
Activities :- To keep various records of actual work
To prepare operating instructions and maintenance
manuals
To inspect the construction work thoroughly and have any defects rectified