PROCESS OPTIMIZATION

FOR SMALL-SCALE LNG PLANTSKED – The Woodlands

Shilpa Dubey | Process Engineering

Tom Maramba | Process Dept. Manager

Bill Schaefer | Senior Process Manager

Dipanjan Bhattacharya | Technology Manager

Page 2: Process Optimization for Small-Scale LNG Plants

3PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

KIEWIT OVERVIEW

Page 3: Process Optimization for Small-Scale LNG Plants

5PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

OPERATING STRUCTURE

WESTERNREGION

CENTRALREGION

EASTERNREGION

US

OPERATIONS

CANADA OPERATIONS

BUILDING MININGAUSTRALIA

OPERATIONS

KIEWIT MINING GROUP

KIEWIT BUILDING GROUP

KIEWIT ENERGY GROUPKIEWIT INFRASTRUCTURE

GROUP

KIEWIT CORPORATIONBruce Grewcock, President & CEO

KIEWIT CORPORATIONBruce Grewcock, President & CEO

KED - The

WoodlandsKED - Lenexa

Page 4: Process Optimization for Small-Scale LNG Plants

2PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

Kiewit Overview

Small-Scale LNG Business Opportunities

CapEx vs. OpEx

Small-Scale LNG Process Flow

Feed Gas Pre-Treatment

Liquefaction & Storage

Liquefaction Technology Selection

Main Utilities

Other Considerations

Summary

OUTLINE

Page 5: Process Optimization for Small-Scale LNG Plants

6PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

SMALL-SCALE LNG BUSINESS

OPPORTUNITIES

Page 6: Process Optimization for Small-Scale LNG Plants

7PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

BUSINESS OPPORTUNITIES

Technology Licensing

Engineering & Design

Project Management

Procurement

Commissioning& Start Up

Construction

Peak Shavers

Base Load Plants

High Horse Power

Machines(e.g. Drilling)

LNG Marine & Truck Fuel

Stranded Gas & Satellite Plants

Locomotive Fuel

Small-Scale

LNG Projects

Page 7: Process Optimization for Small-Scale LNG Plants

8PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

CAPEX VS. OPEX

Tend to prioritize low CAPEX over reduced EFFICIENCIES and increased OPEX

Page 8: Process Optimization for Small-Scale LNG Plants

9PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

LNG PROCESS FLOW

Page 9: Process Optimization for Small-Scale LNG Plants

10PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

LNG PROCESS FLOW

Feed Gas Pipeline

Feed Gas Metering

Booster Compressor

Mercury Removal

Acid Gas Removal

Unit (AGRU)

DehydrationHeavy HC RemovalLiquefactionLNG StorageShip / Truck

Loading

Boil-Off-Gas,

(BOG)

Wet

Regeneration

Gas

Internal

Fuel Gas

Re-Liquefied

BOG

Internal

Fuel Gas

Return to Pipeline

Domestic

Fuel Gas

BOG

Compressor

S

T

A

R

T

F

I

N

I

S

H

Page 10: Process Optimization for Small-Scale LNG Plants

11PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

FEED GAS PRE-TREATMENT

Page 11: Process Optimization for Small-Scale LNG Plants

12PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

FEED GAS PRE-TREATMENT

Mercury Removal

< 0.01 µg/Nm3

Acid Gas Removal

CO2 < 50ppmv H2S< 4ppmv

Dehydration

H2O < 0.1 ppmvHeavy HC Removal

NO ONE-SIZE-FITS-ALL SOLUTION

• Sulfur Impregnated

Activated Carbon

• Metal Oxides (needs

H2S)

• Metal Sulfides

• Temperature Swing

Adsorption (TSA)

• Amine

• Mol. Sieve

TSA

• TSA

• Cryogenic Separation

CAN BE COMBINED INTO A SINGLE VESSEL

Page 12: Process Optimization for Small-Scale LNG Plants

13PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

FEED GAS PRE-TREATMENT

Feed Gas Pipeline

Feed Gas Metering

Booster Compressor

(as required)

Mercury Removal

Acid Gas Removal

Unit (AGRU)

DehydrationHeavy HC RemovalLiquefactionLNG StorageShip / Truck

Loading

Boil-Off-Gas,

(BOG)

Wet

Regeneration

Gas

Internal

Fuel Gas

Re-Liquefied

BOG

Internal

Fuel Gas

Return to Pipeline

Domestic

Fuel Gas

S

T

A

R

T

F

I

N

I

S

H

Page 13: Process Optimization for Small-Scale LNG Plants

14PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

LNG LIQUEFACTION & STORAGE

Page 14: Process Optimization for Small-Scale LNG Plants

15PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

LNG LIQUEFACTION & STORAGE

Liquefaction LNG StorageBoil-Off-Gas (BOG)

Handling

• Single Mixed Refrigerant

Loop

• Nitrogen Recycle Loop

BOG Disposition:

• Pipeline

• Re-liquefy, return to LNG

Tank

• Fuel Gas

• Single / Double / Full

Containment

• In-Tank or Ex-Tank Pumps

• Pressurized Bullets (NFPA

59A permit as maximum of

280,000 US gal.)

Page 15: Process Optimization for Small-Scale LNG Plants

16PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

LIQUEFACTION TECHNOLOGY SELECTION

FOR SMALL-SCALE LNG

Summary of Process Technology Selection Criteria

Liquefaction

Efficiency

Plant

Location

Ease of

Operation

Reduction

of BOG

Refrigerant

Availability &

Handling

Environmental

ImpactCapEx OpEx

Advantage

SMR� �

Advantage N2

Recycle � � � � � � �

Adapted from: “Plant Design Considerations for Small-Scale LNG Plants” Dipanjan Bhattacharya & Jason Yong (Kiewit), Scott Trautmann (APCI)(submitted for publication in LNG Industry Journal, June 2016)

Page 16: Process Optimization for Small-Scale LNG Plants

17PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

LNG LIQUEFACTION & STORAGE

Feed Gas Pipeline

Feed Gas Metering

Booster Compressor

(as required)

Mercury Removal

Acid Gas Removal

Unit (AGRU)

DehydrationHeavy HC RemovalLiquefactionLNG StorageShip / Truck

Loading

Boil-Off-Gas,

(BOG)

Wet

Regeneration

Gas

Internal

Fuel Gas

Re-Liquefied

BOG

Internal

Fuel Gas

Return to Pipeline

Domestic

Fuel Gas

S

T

A

R

T

F

I

N

I

S

H

Page 17: Process Optimization for Small-Scale LNG Plants

18PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

MAIN UTILITIES & OTHER

CONSIDERATIONS

Page 18: Process Optimization for Small-Scale LNG Plants

19PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

MAIN UTILITIES

Hot Oil Heater

Direct-Fired Heater

Electric Heater

Heating

Medium

Feed Gas

Boil-Off-Gas

Vaporized Heavy

HCs

Fuel Gas

SMR vs. Nitrogen

Flare

System

SMR vs. Nitrogen

Refrigerant

Storage

Electric Motor Driven

Gas Turbine Driven

Refrigerant Comp. Driver

Page 19: Process Optimization for Small-Scale LNG Plants

20PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

OTHER CAPEX REDUCTION CONSIDERATIONS

Skid-Mounting

vs. Stick Building

Pipe Rack

vs.

Sleepers

Minimum

Area Paving

Page 20: Process Optimization for Small-Scale LNG Plants

21PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

• In SSLNG owners tend to prioritize lower CapEx over minimizing OpEx

• N2 Cycle technology offers overall CapEx benefits for Small-Scale LNG

• N2 Cycle Liquefaction provides greater simplicity of operation

• No ONE-SIZE-FITS-ALL solution for SSLNG Feed Gas Pre-Treatment

SUMMARY

Page 21: Process Optimization for Small-Scale LNG Plants

22PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

• Plant Design Considerations for Small-Scale LNG Plants, Dipanjan Bhattacharya & Jason Yong (Kiewit), Scott Trautmann (APCI). Submitted for publication in LNG Industry Journal, June 2016.

• Small-Scale LNG 2012-2015 Triennium Work Report June 2015, International Gas Union

REFERENCES

Page 22: Process Optimization for Small-Scale LNG Plants

23PROCESS OPTIMIZATION FOR SMALL-SCALE LNG PLANTS

QUESTIONS

TOM MARAMBAProcess Engineering Dept. Manager

KIEWIT ENGINEERING & DESIGN CO.3831 Technology Forest Blvd. The Woodlands, TX [email protected]

SHILPA DUBEYProcess Engineering

KIEWIT ENGINEERING & DESIGN CO.3831 Technology Forest Blvd. The Woodlands, TX [email protected]

DIPANJAN BHATTACHARYAManager of Technology