THE ULTIMATE SOLUTION FOR SOIL ROAD

PROBASE ROAD SYSTEM

The Past

Presentation to TIBIYO TAKANGWANE

fromPROBASE Group of Companies

MALAYSIA

Page 2: Probase Road System  (18 slides)

The

Common

Problem Of

Soil Road.

Drag picture to placeholder or click icon to add

DUST !

Mud!

Page 3: Probase Road System  (18 slides)

Yearly High Cost On Maintenance !

Page 4: Probase Road System  (18 slides)

PROBASE GROUP OF COMPANY.

• The Inventor Of “Probase Road System”• The Manufacturer Of Probase Product.• Provide Technology Transfer, JV, Design &

Specification, Training, R&D.• The Pioneer Of “Soil Road Maintenance Technology”

Probase Production Plant In Malaysia.

Page 5: Probase Road System  (18 slides)

The Product.1. For Stabilization.

2. For Sealing.

Tx-85 Soil Stabilize & Strengthener For Stable Soil.

• PB-65 Soil Sealant.

SH-85 Soil HardenerFor Unstable Soil.

Page 6: Probase Road System  (18 slides)

How Does It Works?

2 Simple Steps:Step 1. Step 2.

• Stabilization Using TX & SH

• Sealing With PB

Page 7: Probase Road System  (18 slides)

Probase Road SystemThe Soil Road Solution.

The Past The Present

Mud & Slippery.High Transport Cost

Probase Road.All Season Road.

Dusty Soil RoadProbase Road.Dust Free.

Page 8: Probase Road System  (18 slides)

PB-65 did not peal off even after emergency break from a truck

Probase Road System.The Right Technology To Up Keep Soil Road.

Page 9: Probase Road System  (18 slides)

Types of Road and Cost of

Construction

Performance &

Durability

Soil Road

Laterite Road

Asphalt Road

Concrete Road

Gravel Road

Low Cost

High Cost

Probase Road (Using In-situ Material)

Medium & Low Cost

Page 10: Probase Road System  (18 slides)

Patching Treated Soil Spray PB-65

MAINTENANCEEntrepreneurship for local

contractor:

• Simple • Cheaper• Easier.

Page 11: Probase Road System  (18 slides)

For more information visit our website http://probase.com.my© 2013 PROBASE®. All rights reserved. Slides are licensed under the PROBASE®

Completion Date: 15/6/1999

Maintenance period 2011 – 2016, next renewal will be 2016 – 2021.

With minimum maintenance cost, the road can last longer period of time.

How Long PROBASE road will last?

14 Years Old Probase Road.

Page 12: Probase Road System  (18 slides)

After Some Time….

PROBASE Asphalt Road

Cost Savings Between 40% - 60%

To Build An Asphalt Road

Upgrade To Asphalt Road.By Laying 50mm ACWC.

Page 13: Probase Road System  (18 slides)

Case study• To Built Conventional Asphalt Road.• 250km x 6m X USD2m/km = USD500 million• Time 10 Years• Budget Constraint!

Page 14: Probase Road System  (18 slides)

Probase Proposal• To Supply & Install 250km x 6m Probase

Road.• Contract Period 3 Years.• Contract Value USD60 Million. (Base On Usd40/m2). 30% or Usd18 Million By Government. 70% or Usd42 Million By Funder.

Page 15: Probase Road System  (18 slides)

Technology Transfer.90% Local Work Force.

Engineer, Project Manager, Supervisor, Worker.

CONGO

Page 16: Probase Road System  (18 slides)

CONCLUSION.PROBASE ROAD SYSTEM.

• Fast & Easy To Install.• Low Cost.• Easy Maintenance.• Soil Road Free From Dust & Mud.• Lower Transportation cost, Spur Economic

Growth• Environment Friendly.• Whole Nation Will Be Happy & Wealthy.

Page 17: Probase Road System  (18 slides)

PROBASE ROAD SYSTEM

Better Road, Better Life, Better

Future..

17

Thank You. . .

CHANGE!

Change Will Not Come If We Wait For Some Other Person Or Some Other Time.We Are The Ones We’ve Been Waiting For. We Are The Change That We Seek. ---Obama---

Page 18: Probase Road System  (18 slides)

Q & A