Upload
j-garcia-verdugo
View
131
Download
5
Embed Size (px)
Citation preview
Six SigmagKick Off - Starter
STARTER
Content of the Green Belt TrainingGreen Belt Training
Content of this weekWeek 2
Organizational
Knorr-Bremse Group
Why are You here?
The expectations on the project results are bigare big
In this workshop we will be working onIn this workshop we will be working on the structured use of Six Sigma tools, which will help you to meet the project
expectationsexpectations
Work hard and have fun
Knorr-Bremse Group 01 GB W1 starter 08, D. Szemkus/H. Winkler Page 2/10
Work hard ... and have fun
S fSTARTER
Safety• Watch out for flip chart legs• Watch out for flip chart legs
• Limited space – Extension leads are trip hazards
• Don‘t clutter the floor with trip hazards or briefcases
Ti iTiming• We will start on Monday at 9:00 am and finish on FridayWe will start on Monday at 9:00 am and finish on Friday
about 15:00 pm.
Ab i PAbout it - Purpose• Structured use of Six Sigma Tools to tackle problems to• Structured use of Six Sigma Tools to tackle problems to
achieve improvements and “real” financial results.
Knorr-Bremse Group 01 GB W1 starter 08, D. Szemkus/H. Winkler Page 3/10
Safety, Timing, About it… Purpose, Rules, Today… Agenda, Expectations, Roles
STARTER
RulesIf h ti l k!• If you have any questions - please ask!
• If you have experiences or facts in connection with the topic - share them with everybody
• We will have several small breaks - be back on time
• We will work in teams quite often - please get involved
• Listen as an ally Always ask yourself: “How can I use• Listen as an ally. Always ask yourself: How can I use this tool in my situation?”
• Please take calls during break and switch off your• Please take calls during break and switch off your mobile phones.
H f i th t i i !• Have fun in the training!
Knorr-Bremse Group 01 GB W1 starter 08, D. Szemkus/H. Winkler Page 4/10
Safety, Timing, About it… Purpose, Rules, Today… Agenda, Expectations, Roles
E iSTARTER
ExpectationsOurs:Ours:
• Everybody is responsible for what he/she learns on this course
• Active cooperation in team exercisesActive cooperation in team exercises
• Learning by use of the training material as well as the practical application in the projectspp p j
Yours:
• What has to happen during the training so you can benefit fromWhat has to happen during the training, so you can benefit from the use of what you will learn in your every day work?
RolesRolesLecturers: Henry Winkler, Josef Sauer
C G ?Break Manager, Car Park Guard?
Knorr-Bremse Group 01 GB W1 starter 08, D. Szemkus/H. Winkler Page 5/10
Safety, Timing, About it… Purpose, Rules, Today… Agenda, Expectations, Roles
Agenda of this Week
Monday Wednesdayy− Starter− Review week one
− Correlation & regression− Non normal distributed data
− Hypothesis testing− T- Test
Project reviews
− Project reviews
Thursday− Project reviews
Tuesday
Thursday− DOE, 2k factorial experiments− Multivary studiesTuesday
− Review week one− Variance analysis
Multivary studies
Friday− Chi-Square test− MSA continuous data
P j t i
− Introduction SPC− Control strategies
S− Project reviews − Summary
Knorr-Bremse Group 01 GB W1 starter 08, D. Szemkus/H. Winkler Page 6/10
The DMAIC Cycle
ControlMaintain
I t
DefineProject charterImprovements
SPCControl Plans
D t ti
Project charter (SMART)
Business Score CardQFD + VOC
D Documentation QFD + VOC
Strategic GoalsProject strategy
C M
MeasureBaseline AnalysisImprove
AIBaseline Analysis
Process MapC + E Matrix
Measurement SystemAnalyze
Definition of critical
pAdjustment to the
OptimumFMEA y
Process CapabilityDefinition of critical
InputsFMEA
Statistical Tests
Statistical TestsSimulationTolerancing Statistical Tests
Multi-Vari StudiesRegression
Knorr-Bremse Group 01 GB W1 starter 08, D. Szemkus/H. Winkler Page 7/10
Arrangement of Course• Two one week course blocks
• Each course includes your project reports
• Whoever wants to have command of the learning material has to participate from the first day on
• Each module will be introduced in a closed session• Each module will be introduced in a closed session
• Thorough introduction of Step by Step plans
• Detailed review on the module of earlier course blocks• Detailed review on the module of earlier course blocks
• Many exercises
• The course is based on computers; prepared real data
Supporting material• Laptop computer
Mi ft ffi• The course is based on computers; prepared real data will be used for exercises
• Exercises within the group
• Microsoft office
• Minitab Statistic-Softwareg p
• Evaluation of the course at the end of the week
• Third meeting to show the results and to celebrate the
Version 15
• Prepared files gachievements • Lesson material
• Literature
Personal notes
Knorr-Bremse Group 01 GB W1 starter 08, D. Szemkus/H. Winkler Page 8/10
• Personal notes
The Project Introduction
The Team Charter• Problem Description
• Project benefit Specificj
• Numbers
• Meaning for CustomersMeasurable
• Meaning for Customers (extern/intern)
• Financial AdvantageAchievable
• Financial Advantage
• Project Team (Leader/Champion)
Relevant for the team (Leader/Champion)
• Resources (Manpower/Money) Time... Own a Time Plan
• Time Plan
• Influence of Work Security
Knorr-Bremse Group 01 GB W1 starter 08, D. Szemkus/H. Winkler Page 9/10
y
Report about the Project Progress• Team charter / project description:
– Project name
– Green Belt name
– Team members
– Project goals numbers
– Expected £ result
• Actual status (5 minutes)
– List of the tools/modules used to date
– Results seen already in metrics
• Further plans (5 minutes)
– Next steps
• Survey over a module (5 minutes) – Choose a tool/module that you can insert successfully into
your project and refer to it in detail
• The review should take 15 minutes
Knorr-Bremse Group 01 GB W1 starter 08, D. Szemkus/H. Winkler Page 10/10
• The review should take 15 minutes.