49
Immersed Tunnels Recent developments Kelprojektas seminar Transport Infrastructure Innovations René Zijlstra 10 June 2015

Immersed Tunnels Recent developments

Embed Size (px)

Citation preview

Page 1: Immersed Tunnels Recent developments

Immersed Tunnels

Recent developments

Kelprojektas seminar –

Transport Infrastructure Innovations

René Zijlstra

10 June 2015

Page 2: Immersed Tunnels Recent developments

Content

General introduction Royal HaskoningDHV

Principles immersed tunnels

Main benefits

Recent innovations

Page 3: Immersed Tunnels Recent developments

Profile Global consultancy, design, engineering and project management

service provider

Leader in sustainability and innovation

Top 10 of independently owned, non-listed companies

Top 40 worldwide

Turnover in excess of € 650 million

Nearly 7,000 experienced and diverse team members

Leading professionals in our fields

Page 4: Immersed Tunnels Recent developments

Our markets

Aviation

Maritime & Waterways

Transport & Asset Management

Infrastructure

Planning & Strategy

Water Technology

Rivers, Deltas & Coasts

Industry, Energy & Mining

Buildings

Page 5: Immersed Tunnels Recent developments

Basic principle Immersed tunnels

1 2

3 4

Page 6: Immersed Tunnels Recent developments

Production tunnel elements

Page 7: Immersed Tunnels Recent developments

Busan Geoje IMT, South Korea

Dock gate

Page 8: Immersed Tunnels Recent developments

• Wave conditions

• Limitations in transport route Water depth

Locks

• Limitations at project site

Transport

Page 9: Immersed Tunnels Recent developments

Principle of immersion

Page 10: Immersed Tunnels Recent developments

Principle immersed tunnels

Page 11: Immersed Tunnels Recent developments

Principle of joining / Gina gasket

Page 12: Immersed Tunnels Recent developments

Principle of joining

Page 13: Immersed Tunnels Recent developments

Immersed tunnel Busan-Geoje South KoreaVideo Strukton Immersion Projects

Page 14: Immersed Tunnels Recent developments

Potential advantages in alignment design

- especially river crossings

Page 15: Immersed Tunnels Recent developments

High bridges with long approaches ?

Page 16: Immersed Tunnels Recent developments

Bored tunnel – deep level, long approaches

Page 17: Immersed Tunnels Recent developments

Practically every shape

rectangular, circular etc

cost effective for wide tunnels

Page 18: Immersed Tunnels Recent developments

Cost effective for wide tunnels(multiple road lanes or combined road – rail tunnels)

example multiple traffic lay out

Page 19: Immersed Tunnels Recent developments

Practically every waterway

Page 20: Immersed Tunnels Recent developments

Characteristics / Advantages

• Suitable for various and relatively poor soil conditions

• Parallel construction processes

• Relatively low and manageable risk profile

• Capable of dealing with (severe) seismic events

• 80-90% of all design and construction works can be done bylocal companies (limited input from international specialists)

Page 21: Immersed Tunnels Recent developments

Disadvantages / Prejudices ?• Environmental impact of dredging

• Contaminated soils

• But also opportunities ? Land reclamations

• Construction impact on shipping

• Limited and manageable impact

• In practice often an issue that can be addressedproperly by good communication

Page 22: Immersed Tunnels Recent developments

Innovations

1. Caland tunnel, The Netherlands

2. Øresund Link, Denmark

3. Busan Geoje, South Korea

4. HZMB, China

5. Fehmernbelt Link, Denmark

Page 23: Immersed Tunnels Recent developments

Caland tunnel – The NetherlandsExtension immersed section

Page 24: Immersed Tunnels Recent developments

Caland tunnel – The NetherlandsExtension immersed section

Page 25: Immersed Tunnels Recent developments

Øresund Link, Denmark

Page 26: Immersed Tunnels Recent developments

Traditional production

tunnel elements

Page 27: Immersed Tunnels Recent developments

Øresund Link, Denmark – new developments

Factory Production / Full Section Casting

Page 28: Immersed Tunnels Recent developments

Production Factory Principle

Page 29: Immersed Tunnels Recent developments

Dredging & Environmental issues

Øresund Link, Denmark

Page 30: Immersed Tunnels Recent developments

Busan Geoje Fixed Link,

South Korea

Page 31: Immersed Tunnels Recent developments

Busan Geoje Fixed Link, Challenges

• Deep level

• Poor soil conditions

• Adverse marine conditions (off shore)

• Seismic events and exceptional wave conditions dueto typhoons

Page 32: Immersed Tunnels Recent developments

Busan Geoje Fixed Link,

South Korea

Full section casting in traditional casting basin

Page 33: Immersed Tunnels Recent developments

Busan Geoje Fixed Link,

South Korea

Soil treatment of poor soils

Page 34: Immersed Tunnels Recent developments

Busan Geoje Fixed Link,

South Korea

Special equipment for transport and immersion

Page 35: Immersed Tunnels Recent developments

Hongkong Zhuhai Macao Link, China

Page 36: Immersed Tunnels Recent developments

Hongkong Zhuhai Macao Link,

Challenges

• Geotechnical conditions

• Depth

• Geometrical (span + length)

• Off shore conditions

• Design life of 150 years

Page 37: Immersed Tunnels Recent developments

Hongkong Zhuhai Macao Link, Challenges

• Controlled conditions for element production

Page 38: Immersed Tunnels Recent developments

Hong Kong-Zhuhai-Macao Link China

Page 39: Immersed Tunnels Recent developments

Hongkong Zhuhai Macao Link, Challenges

• Ground conditions

Page 40: Immersed Tunnels Recent developments

Hongkong Zhuhai Macao Link, Challenges

• Offshore conditions

Page 41: Immersed Tunnels Recent developments

FehmernBelt Link, Denmark

Page 42: Immersed Tunnels Recent developments

FehmernBelt Link, Denmark

Special elements for M&E and maintenance

Page 43: Immersed Tunnels Recent developments

FehmernBelt Link, Denmark

Construction

4 x times Oresund

Page 44: Immersed Tunnels Recent developments

FehmernBelt Link, Denmark

Page 45: Immersed Tunnels Recent developments

FehmernBelt Link, Denmark

Environmental – re use of dredged material

Page 46: Immersed Tunnels Recent developments

FehmernBelt Link, Denmark

Safety Concept ventilation

Safety Strategy based on three levels:

• Level 1 – prevention of accidents and fires through design and operation

• Level 2 – control of incidents, and self-rescue

• Level 3 – facilities for emergency services response and rescue

Page 47: Immersed Tunnels Recent developments

FehmernBelt Link, Denmark

Longitudinal ventilation for operation and fire

Page 48: Immersed Tunnels Recent developments

FehmernBelt Link, Denmark -- Video

Page 49: Immersed Tunnels Recent developments

Ačiū už dėmesį

www.rhdhv.com