63
Major HUC Campaign PROVISION OF HOOK UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT STRUCTURAL / MECHANICAL / SAFETY Prepared by MOHD SYAFIQ BIN SHAWALUDIN (PROJECT ENGINEER)

Bertam Field Development Project Major HUC Campaign

Embed Size (px)

Citation preview

Page 1: Bertam Field Development Project Major HUC Campaign

Major HUC Campaign

PROVISION OF HOOK UP AND COMMISSIONING (HUC) SERVICES FOR BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT

STRUCTURAL / MECHANICAL / SAFETYPrepared by

MOHD SYAFIQ BIN SHAWALUDIN (PROJECT ENGINEER)

Page 2: Bertam Field Development Project Major HUC Campaign

WOR SUMMARYNo

Discipline Major HUC

Flowline Campaig

n

Total

1 Structural 6 - 62 Mechanical &

Piping42 30 72

3 Electrical 11 1 124 Instrument 9 3 125 Safety 3 - 3

Page 3: Bertam Field Development Project Major HUC Campaign

STRUCTURAL

Page 4: Bertam Field Development Project Major HUC Campaign

STRUCTURAL - 1

Installation of IPE 220 Beams and 100x75x7 Angle Bar – the offshore installed members are as indicated in reference drawing title Cellar Deck Framing Plan at T.O.S EL (+) 13500

Page 5: Bertam Field Development Project Major HUC Campaign

IPE 220

IPE 220

ANGLE BAR100X75X7

U

Page 6: Bertam Field Development Project Major HUC Campaign
Page 7: Bertam Field Development Project Major HUC Campaign

A B

Page 8: Bertam Field Development Project Major HUC Campaign

STRUCTURAL - 2

35x5 Serrated Galvanized Grating – Offshore Installed members are as indicated in reference drawing title ‘Flooring & Handrail Layout Plan at T.O. GRTG EL (+) 13535 / T.O.PLT. EL.(+) 13510’

Page 9: Bertam Field Development Project Major HUC Campaign

35x5 Serrated Grating

U

Page 10: Bertam Field Development Project Major HUC Campaign

STRUCTURAL - 3

Relocation of Crane Boom Rest from Permanent (during Jack-up Drilling operation) to Temporary

Location

Page 11: Bertam Field Development Project Major HUC Campaign

Crane Boom Rest (permanent Location)

Crane Pedestal

Temporary Crane Boom Rest(During Jack-up Drilling Operation)

U

Page 12: Bertam Field Development Project Major HUC Campaign

STRUCTURAL - 4

Re-instate handrail and grating at Sea Deck (EL(+) 5200)

Page 13: Bertam Field Development Project Major HUC Campaign

35x5 Serrated Grating

GRATING

Page 14: Bertam Field Development Project Major HUC Campaign

HR 10

HR 6

HR 8

HR 4

HR 1

HR 4

HR 8

HR 6

HR 10HR 11

HR 7

HR 3HR 12

HR 15

HR 14

HR 13

HR 1

HR 2

HR 5

HR 9

HANDRAIL

Page 15: Bertam Field Development Project Major HUC Campaign

PIPING

Page 16: Bertam Field Development Project Major HUC Campaign

Wellhead arrangement

WH-1010

WH-1009

WH-1011

WH-1002

WH-1007

WH-1006

WH-1008

WH-1005

WH-1001

WH-1004

WH-1014

WH-1003

WH-1003

WH-1012

N

Page 17: Bertam Field Development Project Major HUC Campaign

VH Line

WH-10XX

FFW

1

2

MV-N

TG 10131

TP-Y

MV-M

MV-K

MV-L

RO-B

TP-W

3

4

50-VL-600XX-11430X-PRD

Page 18: Bertam Field Development Project Major HUC Campaign

TP-107B

TP-106B

TP-108B

TP-102B

TP-110B

TP-100B

TP-105B

TP-103B

TP-111B

TP-101B

TP-104B

TP-109B

TP-113B

TP-112BWH-

001WH-002

Page 19: Bertam Field Development Project Major HUC Campaign

50-VH-10003-31430Y-PRD-HUC

100-FD-44021-11430X-CED-PRD-HUC

TP-23A

TP-23

1

2

3

4

FFW

FFW

Page 20: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-PL-10005-31430Y-ET-PRD-CED-HUC

40-WS-43002-11430X-CED-PRD-HUC

PS-SD-00281-HUC

PS-SD-00261

TP-111B

TP-112A

FFW

FFW

FFW

FFW

Page 21: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-PL-10005-31430Y-ET-WH-PRD-HUC

40-WS-43002-11430X-CED-PRD-HUC

PS-SD-00281-HUC

PS-SD-00261

40-WS-43002-11430X-PRD-DRD-HUC

PS-SD-00280

TP-3B

FFW

TP-3A

Page 22: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-DC-60073-11430X-ET-PRD-DRD-HUC

40-WS-43002-11430X-CED-PRD-HUC

PS-SD-00281-HUC

PS-SD-00261

40-WS-43002-11430X-PRD-DRD-HUC

PS-SD-00280100-DC-60073-11430X-ET-PRD-

DRD-HUC

TP-3B

Page 23: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 80-FD-44003-11430X-PRD-HUC

40-WS-43002-11430X-CED-PRD-HUC

PS-SD-00281-HUC

PS-SD-00261

40-WS-43002-11430X-PRD-DRD-HUC

PS-SD-00280100-DC-60073-11430X-ET-PRD-

DRD-HUC

100-VL-60026-11430X-PRD-DRD-HUC

TP-151

Page 24: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 80-FD(PL)-44203-31430Y-PRD-HUC

80-DH-61013-11430X-CED-PRD-HUC PS-SD-

00260

MV-44104

MV-44101 MV-44103MV-44102

Page 25: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 50-VL-60031-11430X-CED-PRD-HUC

50-DH-61006-11430X-CED-PRD-HUC

TP-126B

Page 26: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 50-VL-60025-11430X-DRD-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-133B

TP-133A

FFW

FFW

FFW

*already install onshore

Page 27: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 50-DC-60066-11430X-DRD-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-134A

FFW

TP-134B

FFW

FFW

*already install onshore

Page 28: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-VL-60026-11430X-PRD-DRD-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-121B

FFW

TP-121A

Page 29: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-DC-60073-11430X-ET-PRD-DRD-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-120B

FFW

TP-120A

Page 30: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 80-VA-57003-11430X-DRD-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-135B

FFW

TP-135A

*already install onshore

Page 31: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 80-DH-61036-11430X-DRD-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-135B

FFW

TP-135A

FFW

Page 32: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-FD-44021-11430X-CED-PRD-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-135B

FFW

TP-135A

FFW

Page 33: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-DH-61027-11430X-CED-PRD-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-126

FFW

TP-123B

Page 34: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-DH-61001-11430X-PRD-DRD-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-122BFF

W

TP-122A

Page 35: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 80-DH-61013-11430X-CED-PRD-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-128B

FFW

TP-128A

Page 36: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 80-WP-43012-11430X-CED-DRD-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-132A

FFW

FFW

FFW

FFW

FFW

*LMBV proposed additional flange at spool No 1.

Page 37: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 40-WP-43002-11430X-PRD-DRD-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-131A

FFWTP-

131B

Page 38: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 50-DH-61006-11430X-CED-PRD-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-129

TP- 125

Page 39: Bertam Field Development Project Major HUC Campaign

PL LINE

Page 40: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-PL-10025-31430Y-ET-PRD-CED-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-101A

TP- 101B

Page 41: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-PL-10023-31430Y-ET-PRD-CED-HUC

TP-102A

TP- 102B

Page 42: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-PL-10021-31430Y-ET-PRD-CED-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-103A

TP- 103B

Page 43: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-PL-10019-31430Y-ET-PRD-CED-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-104A

TP- 104B

Page 44: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-PL-10017-31430Y-ET-PRD-CED-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-105A

TP- 105B

Page 45: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-PL-10015-31430Y-ET-PRD-CED-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-106A

TP- 106B

Page 46: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-PL-10011-31430Y-ET-PRD-CED-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-108A

TP- 108B

Page 47: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-PL-10009-31430Y-ET-PRD-CED-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-109A

TP- 109B

Page 48: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-PL-10029-31430Y-ET-PRD-CED-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-110A

TP- 110B

Page 49: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-PL-10003-31430Y-ET-PRD-CED-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-112A

TP- 112B

Page 50: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 100-PL-10001-31430Y-ET-PRD-CED-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-113A

TP- 113B

Page 51: Bertam Field Development Project Major HUC Campaign

VH LINE

Page 52: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 50-VH-10001-31430Y-PRD-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-21A

TP- 21

Page 53: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 50-VH-10002-31430Y-PRD-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-22A

TP- 22

Page 54: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 50-VH-10015-31430Y-PRD-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-24A

TP- 24

Page 55: Bertam Field Development Project Major HUC Campaign

INSTALLATION OF PRE-FAB SPOOL 50-VH-10005-31430Y-PRD-HUC

50-DH-61006-11430X-CED-PRD-HUC

PS-SD-00230

TP-26A

TP- 26

Page 56: Bertam Field Development Project Major HUC Campaign

WH-1003

RO 60051

10852

10853

6025560254

TP-26

TP-26A

50-VH-10006-31430Y-PRD-HUC

Page 57: Bertam Field Development Project Major HUC Campaign

WH-1011

RO 6006110862

10863

60305

60304TP-27

TP-27A

50-VH-10016-31430Y-PRD-HUC

Page 58: Bertam Field Development Project Major HUC Campaign

WH-1008

RO 60071

10872

10873

60355

60354TP-28

TP-28A

50-VH-10008-31430Y-PRD-HUC

Page 59: Bertam Field Development Project Major HUC Campaign

WH-1009

RO 60081

60404

10883

6040510882

TP-29

TP-29A

50-VH-10009-31430Y-PRD-HUC

Page 60: Bertam Field Development Project Major HUC Campaign

WH-1010

RO 60091

1089210893

60455

60454TP-30

TP-30A

50-VH-10010-31430Y-PRD-HUC

Page 61: Bertam Field Development Project Major HUC Campaign

WH-1006

RO 60101

10903

10902

60505 60504TP-31

TP-31A

50-VH-10011-31430Y-PRD-HUC

Page 62: Bertam Field Development Project Major HUC Campaign

WH-1012

RO 60111

10913

1091260555

60554TP-32

TP-32A

50-VH-10012-31430Y-PRD-HUC

Page 63: Bertam Field Development Project Major HUC Campaign

WH-1013

RO 60121

10923

10922

60605

60604TP-33

TP-33A

50-VH-10013-31430Y-PRD-HUC