A presentation on topic "A Framework of BIM-Based Construction Project Monitoring System for Owner" by Souksavath Losavanh, The Twenty-Sixth KKHTCNN Symposium on Civil Engineering November 18-20, 2013, Singapore
Citation preview
04/13/2023 1
A FRAMEWORK OF BIM-BASED
CONSTRUCTION PROJECT MONITORING
SYSTEM FOR OWNERS
Advisor : Associate Professor Veerasak Likhitruangsilp, Ph.D.Student : Souksavath Losavanh
Department of Civil Engineering Faculty of Engineering
Chulalongkorn University
04/13/2023 2
# Building Information Modeling (BIM) comes to be concerned issue of the AEC Industry.
Source: Hooper, M. 2011
Background
# Transformation in construction information exchange
04/13/2023 3
# BIM is increase productivity and improve the final project outcomes.
# Construction monitoring is the key elements to success of construction
project.
# Owners need BIM.
BIM + Construction Monitoring
HOW ???
04/13/2023 4
Research Objective
Develop the framework of a BIM-based Construction monitoring
system for construction projects to owners.
Scope of Research
Develop and implement framework of BIM-based.
Apply to high-rise building ( Chamchuri 10 Building )
The software that used in this thesis: ● Revit 2013. ● MS Excel 2010.
04/13/2023 5
Construction Project
Building Model
Components
Visuanlisation
Information
Composition of BIM Requirement information
Planing and Design
• Identity data- ID Code- Mark Number- OmniClass Number- Work discipline• Design data- Category(Family)- Name(Type)- Dimension- Material- Cost- Level• Planning data- Phase- Plan start date- Plan finish date
Construction
• Construction- Actual Start date- Actual finish date- Percent of complet- Site photo
• - Comment
Operation
• FM- Room- Space- Function
Research Methodology
04/13/2023 6
BIM-based Construction monitoring system for construction project to
owners
Owner Office Construction Site
Transfer
SyncSync
Cloud Storage
Designer office
Documents
MEP Engineer
Structural Engineer
Architect
Designer Owner
04/13/2023 7
BIM-based Construction monitoring system for construction
project including of two stages and four part.
Stage 1: Pre-Construction
Stage 2: Construction
Part 1: Design
Part 2: Prepare for monitoring
Part 3: Construction and Monitoring
Part 4: Progress report
Stage: Part:
04/13/2023 8
Part 1: Design
Workflow:
Owner OfficeDesigner office
Documents
MEP Engineer
Structural EngineerArchitect
A
Start
Owner identify necessary information for project monitoring
Owner establish an information packet for project monitoring to
designer
Designer create a packet of information to BIM-
Design model
Owner verifyBIM-Design model
BIM-Master modelYes
No
B
04/13/2023 9
Part 2: Prepare for monitoring
Workflow:
Start
Designer transfer BIM-Design model to Owner (Arc, St and MEP file)
Owner create BIM-Master
Owner upload BIM-Design model to
database
Owner link BIM-Model files to BIM-Master file
Owner share BIM-Master files to owner
site office
Finish
B C
Owner OfficeDesigner office
Documents
MEP Engineer
Structure Engineer
Architect
04/13/2023 10
Workset file
BIM-Master model database
Workset Link Master file
MEP
STR
ARC
ARCH P1-03-03-13 ARCH P2-05-04-13 ARCH P3-05-05-13
STRUCT P1-03-03-13 STRUCT P2-05-04-13 STRUCT P3-05-05-13
MEP P1-03-03-13 MEP P2-05-04-13 MEP P3-05-05-13
Owner office
CC10-STR-2013.03.03
Date
Type
Project
04/13/2023 11
Workflow:
MEP
STR
ARC
ARC P1-03-03-13 ARC P2-05-04-13 ARC P3-05-05-13
STR P1-03-03-13 STR P2-05-04-13 STR P3-05-05-13
MEP P1-03-03-13 MEP P2-05-04-13 MEP P3-05-05-13
Owner office
MEP
STR
ARC
Construction site
Start
Import BIM-Master file from site office to
tablet PC
Engineer select project phase
Engineer select object to update
Take site photo
Input current progress information
Upload to cloud storage
Generate image URL
Construction phase updated
Finish
Updated all items
Yes
No
Export BIM file to site
officeC D
Part 3: Construction and monitoring
04/13/2023 12
Part 4: Progress report
Workflow:
MEP
STR
ARC
Project progress report
ARCH P1-03-03-13 ARCH P2-05-04-13 ARCH P3-05-05-13
STRUCT P1-03-03-13 STRUCT P2-05-04-13 STRUCT P3-05-05-13
MEP P1-03-03-13 MEP P2-05-04-13 MEP P3-05-05-13
Owner office
Plan
Actual
In progress
SIT F16-C10-03-03-13 SIT F16-C11-03-03-13
SIT F16-C12-03-03-13 SIT F16-C13-03-03-13
Start
Import files from Site office
Filter InformationCombine BIM-Record model to BIM-Master
Export information to text file
Import text file Excel temple file
Report of project progress
Finish
D E
04/13/2023 13
Tablet PC for collecting and updating
information on construction site Current construction site image
F16-A-03 F16-E-04
F16-F-08 F16-B-04
Report screen of project progress report at the owner office
04/13/2023 14
Conclusion
# This research has developed a framework of BIM-based construction monitoring system for the high
rise building construction project to the owners that can be used by the owner to monitoring project
progress.
# The purpose of this framework is shows the BIM-based construction monitoring system that reduce the
errors and omissions in paper on the paper-based modes of communication.
# This research data collected only reinforcement concrete structural system that included column, beam
and slab.
# This research were develop after project start.
04/13/2023 15