Upload
the-texas-network-llc
View
1.520
Download
5
Tags:
Embed Size (px)
DESCRIPTION
West Harris County Regional Water Authority Fall 2012 Town Hall PowerPoint - www.whcrwa.com
Citation preview
2012 TOWN HALLNOVEMBER 7, 2012
The Authority makes no representations or warranties regarding the amount of its future fees or water rates, conditions of service, terms of its Groundwater Reduction Plan, terms of its future orders or rules, or any other
matters set forth in this presentation.
• Status of Facilities• Status of Conversion• Ongoing Issues• 2020 System• Finances• Q&A
• 53 miles of pipelines in operation• Pump Station #1
• 15 MG storage
• Upgraded Control/SCADA System
• 5 active contracts• 8.4 miles of pipelines• Connections to 3 Water Plants• Upgrade to supply metering station
STATUS OF CONVERSION
§ Surface Water to 50 Water Plants§ 39 Districts converted§ 2 more Districts with 2 Water
Plants by end of 2012§ 30.1 percent converted in 2011
(extreme drought)§ 35.3 percent converted to date
SW PURCHASED FROM CITY OF HOUSTON
ITEM 2007 2008 2009 2010 2011 2012 2013
Treated Water Costs
0.3584 0.3799 0.6187 0.4341 0.3754 0.5489 0.4882
Untreated WaterCosts
0.1054 0.1260 0.1224 0.1170 0.1109 0.1444 0.1343
Major Rehab -- -- 0.2140 0.1468 0.0158 0.1667
Total Water Cost per 1000 Gallons
0.4638 0.5059 0.9551 0.6979 0.5021 0.6932 0.7891
CITY OF HOUSTON FY
Figures for FY2007 through FY 2011 are based on true-up costs. FY 2012 and FY 2013 are based on City of Houston estimated O&M cost prior to true-up.
• Contracts 39 & 40§ Design 90 percent complete
• Acquiring easements for Contracts 33, 34 & 49
• Start with Census Bureau 2010 Census• 2010 Census equal to projections for 2020• Compared with projections for HGSC• Approximately 2 percent per year until 2020
• Water level dropped 85 feet• Recovered only 40 feet
• For use of untreated surface water or wastewater effluent• Credit equal to 50 percent of then current pumpage fee • Credit for up to 10 years• For recovery of construction cost of project• Currently have one project:
• Pine Forest Country Club
§ Drought of 2011§ City of Houston draft revised plan§ Authority to re-evaluate plan§ Districts need to consider modifying plans
§ HGSD, FBSD, LSGWCD joint study§ Improved groundwater model§ Updated population projections§ Study completed by end of 2012§ Potential regulatory plan changes
• $41,965,000 WIF Loan• Interest rate approximately 1.1667 %• For Second Source Transmission Lines
• Preliminary Engineering• Surveying• ROW Acquisition• Environmental• Permitting
• Luce Bayou• COH Treatment Plant Capacity• North-South Second Source Project• East-West Second Source Project• Repump Station• Central Pump Station• CIP Distribution Lines• Connections to MUDs
§ Expansion of NEWPP§ 8-10 years to plan, design, construct§ Participants include COH, WHCRWA,
NHCRWA, NFBWA, CHCRWA§ Initial evaluations in progress
• North-South and East-West routes• Joint WHCRWA/NFBWA• Projected 39 miles of 96” pipe• Environmental Studies in progress• Permitting ongoing• Acquiring additional easements
• Sites acquired• Sites platted and recorded• Permit for Repump issued• Joint WHCRWA/NFBWA
• Approximately 75 miles
• Evaluating alternate routes
• Acquiring easements
• Designing and constructing sections• Close loops• Deliver contract
supply in winter
75 MILES
EVAL
ROUTES
ACQUIRE
EASEMENTS
DESIGN&
CONSTRUCT
DELIVER
IN WINTER
YTD BUDGET YTD ACTUALRevenues $32,796,271 $27,634,071
Expenditures
Operating Fund $ 9,228,972 $ 6,663,239
Bond Debt Service Fund Transfer
$16,572,409 $18,094,493
Construction Fund(from Bond Proceeds)
$11,735,797 $14,497,497
Second Source Project(from Bond Proceeds)
$2,932,500 $1,597,755
Revenues $36,557,286
Expenditures
Operating Fund $10,392,150
Bond Debt ServiceFund Transfer
$25,811,530
Construction Fund(from Bond Proceeds)
$16,563,500
Second Source(from Bond Proceeds)
$11,100,000
SURFACE WATER GROUNDWATER
WHCRWA $2.15 $1.75
NHCRWA $2.20 $1.75
NFBWA $1.85 $1.50
SURFACE WATER GROUNDWATER
CURRENT $2.15 $1.75
2013 ? ?
HGSD Disincentive Fee$5.00 per 1,000 gallons