Upload
alaa-h-mousa
View
136
Download
6
Tags:
Embed Size (px)
DESCRIPTION
urban transport planning
Citation preview
University Kebangsaan Malaysia
DEPARTMENT OF CIVIL AND STRUCTURAL ENGINEERING
Urban Transportation
Prepared by:
ALAA.H.MOUSA P71081
Lecturer: Prof. Dr. Riza Atiq
IntroductionTransport plays a major role in urban development by providing access for people to education, markets, employment, recreation, health care and other key service. Increasing number of vehicles on road is generated traffic congestion, parking problems, air pollution (acidification, smog), noise, greenhouse gas emissions and road accidents. For these reasons, public transport system is a one solution that can implement in urban development areas to reduce road congestion and travel times, air pollution, and energy and oil consumption, all of which benefit both riders and non-riders alike.
Urban Transportation Development plan
KajangBangi putrajaya
Nilai 3
Bander sri putra
Objectives
The main objectives of this study are;
o To study public transport demand for short term and long term period in Kajang – Bangi – Putrajaya – Bandar Seri Putra – Nilai corridor. o To determine the most desired line for public transport between the zones that connecting the corridor.
o To propose the suitable and sustainable public transportation system in the corridor.
Scope of Study Basically the scope of study involves the following works;
i. Preliminary Study: Set objectives, decide the study area, collect existing data and information (structure plan, land use plan, population, traffic volume and etc.)
ii. Auditing Existing Situation: Evaluating existing physical and transport situation, traffic survey, identify problems at study area.
iii.Long Term Plan: Planning for next 7 years, high cost of implementation.
Location of Study Area Five main zones:
Kajang – Bangi – Putrajaya – Bandar Seri Putra – Nilai were selected as a location area of this study and these towns are connected each others. The background for each zone is described in following paragraph .
KAJANG
1-Kajang was made the capital of one of Selangor's districts, Hulu Langat in the 1800s because of it being in the district's center
2. It is located 21 kilometers (13 mi) from of Malaysia's capital
Transportation In Kajang, there are two stations.
1-Kajang train station or KTM Kajang which is located in jalan Bukit situated 1 km south from Kajang's town centre. 2- bus station in Pusat Hentian Kajang
Bangi
recently crowned as "Knowledge City" - situated in the district of Hulu Langat, in Selangor, Malaysia, named after the small town of Bangi situated further south. It is located between Kajang and Putrajaya (formerly Prang Besar) and is about 25 km away from the capital city, Kuala Lumpur.
Transportation1. bus terminal in Bandar Baru Bangi sharing with Kajang
town which the location is at Hentian Kajang.
2. Absence of bus stations and Taxi Terminal .
3. Bus stop Condition.
4.the lack of parking places for the public near UKM Komuter
PutrajayaPutrajaya is a planned city, located 25km south of Kuala Lumpur, that serves as the federal administrative centre of Malaysia. The seat of government was shifted in 1999 from Kuala Lumpur to Putrajaya, due to the overcrowding and congestion in the Kuala Lumpur areas.
Transportation•Putrajaya Sentral is the main public tranportation hub of Putrajaya. •Located at the west side of Putrajaya, this is the place where public transportation from other parts of Selangor stop.
• The Express Rail Link that links KLIA to KL Sentral has a station here.
Nilai3Nilai 3 is a town located in Negeri Sembilan,Malaysia. Due to its proximity, and connection through the KTM to Kuala Lumpur, Putrajaya, and Kuala Lumpur International Airport, it is a rapidly growing town, development projects can be seen as one drives around Nilai. Area of Nilai reach to (165ha) which represents the country’s largest wholesale center
Bander Sri PutraA new rapid growing township in Bangi, Selangor. It is function as the new residential center which supports the development of Bandar Baru Bangi.
Bus,taxi and commuter services
• Lack of public transport integration existing buses is outdated, have poor- accessibility especially in the Kajang and Bangi area.
• Unsuitable location for Kajang Town bus stop
point.
• Main public transport terminal is far from komuter station and it’s shared between Kajang and Bangi
. Putrajaya location is far away from other facilities. No public transport to connect between nearest places (Kajang and Bangi) and Putrajaya..
• Services of KTM Komuter are bad. • KTM Komuter station condition cannot
accommodate the increasing passenger ’s demands. It has very limited parking
CURRENT PUBLIC TRANSPORT FACILITIES:
Generally, public transportation is one of the most important part of urban transportation division that are available now in Malaysia. the existing public transport services consist of two main parts:
1.Buses2.Trains3.Taxis
THE STUDY METHODOLOGY
the initial step involves evaluation of existing data and plans
• Speed – up to 100 km/hr• 4 – 12 couches per train• Couches 22m x 3.1 m • Capacity – up to 80,000 passengers / hr / direction• Acceleration / deceleration ≈ 1.2 m/s2• Rail – 1435mm gauge• Headway ≥ 120 s• Suitable for radial movement• For high density and high plot ratio area.• Feeder bus service is required• Power supply: 750 V dc• Sub-station: 3 – 5 km spacing
proposed MRT
Guide way utilization factor = 0.75 Load factor = 0.9.
To calculate possible range of head way (h) for MRT:Since:
Where:Cp = Theoretical passenger line capacity assume= (27040) passengers/hr.α = guide way utilization factor (0.6)
= load factor (0.9)
n = vehicle per train
S = Maximum passenger per vehicle
h = headway in second.
Proposed Physical Development
• We propose for the new MRT line to be of double-line configuration Connected to Putrajaya from Kajang, Bandar Baru Bangi, Bandar Seri Putra and Nilai.
For Kajang, Batang Benar and Nilai, the new connection network with existing KTM must be take into consideration to make sure this line viable and interconnected. And Bandar seri putra to niali 3 the new connection with BRT as in Figure below.
THANK YOU VERY MUCH