This is a presentation suggesting improvements in the layout of Chowgule & Co. Ltd., a private shipyard in Goa, India.
Citation preview
Ambattuparambil Gopi Nikhil – 09NA1008
Shipyard Layout
Improvements for Chowgule & Co. Ltd. – Shipbuilding Division
Chowgule & Co. Ltd.
• Located on River Zuari at Loutulim
• Builders, owners & repairers of river fleets since 1951
• Developing waterways economy
• Built over 100 vessels including
– Iron Ore Barges– Deep Sea Refrigerated
Fishing Trawlers– Grab & Cutter Section
Dredgers– Tugs– Twin-Hull Catamarans– Floating Restaurants
Location
GOA
River Zuari
Present Layout
Present Layout - features
• Construction Bays on either side of Slipway
• Main yard near Outfitting Jetty• Ample amount of Skids for module
assembly but scattered• Distance between Stockyard & Main
yard• Space between Gate & Main Yard
unutilized (trees?)
Present Layout
Methodology
Design RoomProduction
Department Scheduling Grit Blasting/ painting
Methodology
Lofting CNC Cutting
Assembly of
Modules
Modular Construction
Methodology
Survey Movement Launching Sea Trials
Facilities
• Slipway – 220m x 20m• 2 Construction bays – either side of
slipway– 90m x 30m open space– 90m x 40m open space
• Outfitting Jetty 7m x 10m x 15m• Sufficient skids for pre-fabrication of
modules/panels• Well equipped workshop
Inferences
• Shipyard specializes in smaller vessels especially those used in waterways and for fishing
• Capacity is limited• Delivery time is of utmost importance
– Being a private yard (no Govt support)– To get more orders– Maintain credibility
• Will need more facilities if it wants to extend its product catalogue
• Best way to improve layout maybe to induct a production flow line model that allows easy flow of materials without bottlenecks
Suggestions
Suggestions• Set up Stockyard near Checkpoint to reduce travel
time of plates coming in and to be nearer to Main yard. Shift Sand blasting unit accordingly
• Use the unutilized area to set up Grit blasting/painting & CNC Cutting units – Reduces travel time of modules/plates
• Add more (or shift existing) skids nearer to Main yard to reduce travel time of modules
• Shift Main office building to give direct access of main yard to construction bays
• May shift store to north of Main yard if space permits
Benefits envisioned
• Faster production line• Lesser delivery time more orders• Lower man-time requirement• Use of lifting equipment freed for
better purposes (due to lower amount of shifting of modules & panels)
Limits to present shipyard
• Cannot increase production too much due to space constraints
• Lack of dry dock reduces capability for advanced outfitting
Ambattuparambil Gopi Nikhil – 09NA1008
Ambattuparambil Gopi Nikhil
09NA1008Presentation on Improvement of Shipyard Layout in Chowgule & Co. Ltd. – Shipbuilding Division