Upload
sahraahmedali
View
210
Download
1
Tags:
Embed Size (px)
Citation preview
PLAN FOR FIRST DAY OF SHOOTING
Halfwit Productions
GENERAL
Date: Sunday 22nd June 2014
Start time: 12:00 pm
Shooting crew: Sahra Ahmed – Director,
Camerawoman
Cast crew: Jordan Hewitt & Arran Sharma
Transport/ chauffeur: Omar Ahmed
Equipment: Camera, tripod, SD card, extra battery
PRE-SHOOTING PLAN
In school:
Pick up the camera from Mr Brown, call sheet has already been filled in and booked for the 22nd June .
Before we leave we must make sure that the battery is fully charged and that I have a spare battery as
well as the charger as I am to take the camera over the course of 4 days in order to practice before-
hand.
Once all the equipment is gathered, it is to be taken home to be practiced with by the camerawoman
so that she is ready for Sunday.
Once at the locations to film:
Once shooting:
Anna and Tom waking up to each other in bed (POV shoots)
Anna traces Tom’s arm with her finger, Tom smiles
Baking cake scene
Playing twister
Anna waking up from bed,
switches alarm clock off, groggily.
Makes tea, toast (breakfast)
Brushes teeth, once finished,
pouts at the mirror whilst fixing
her hair
Rushes down the stairs
Shuts door on her way out
Tom waking up from bed,
switches alarm clock off, groggily.
Makes tea, toast (breakfast)
Brushes teeth, once finished,
pouts at the mirror whilst fixing
his hair
Rushes down the stairs
Shuts door on his way out
CONTINUED
Anna Tom
- End of filming session 1