146
A Warm A Warm To All To All NTPC

NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Embed Size (px)

DESCRIPTION

coal to electricity.........

Citation preview

Page 1: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

A WarmA Warm

To AllTo All

NTPC

Page 2: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

A Presentation on

NTPCCoal to Electricity

Prepared by - Tejasvi Anant (Mechanical)

Page 3: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

India’s largest power company, NTPC was set up in 1975.

NTPC became a Maharatna company in May, 2010.

NTPC ventured into consultancy, power trading, ash utilisation and coal mining.

NTPC has been awarded No.1, Best Workplace in India among large organisations and the best PSU for the year 2010.

Page 4: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

NTPC INSTALLED CAPACITY

Source – www.ntpc.co.in

Page 5: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

KSTPS OVERVIEW

Page 6: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Korba Super Thermal Power Plant

Country India

Location Jamanipali, Chhattisgarh

Commission date 1983

Owner(s) National Thermal Power Corporation

Power station information

Primary fuel Coal

Generation units 7

Power generation information

Installed capacity 2,600 MW

Page 7: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Stage Unit NumberInstalled

Capacity (MW)Date of

Commissioning

1st 1 200 1983 March

1st 2 200 1983 October

1st 3 200 1984 March

2nd 4 500 1987 May

2nd 5 500 1988 March

2nd 6 500 1989 March

3rd 7 500 2010 December

Total Seven 2600

Korba Super Thermal Power Plant is located at Jamanipali in Korba district in the Indian state of Chhattisgarh. The power plant is one of the Coal based power plants of NTPC. The coal for the power plant is sourced from Kusmundha and Gevra Mines. Source of water for the power plant is Hasdeo River.

Page 8: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

KORBA A SUCCESS STORY……

TextText

Text

Text

ANDROIDWINDOWS

SYMBIAN

BLACKBERRY

Clearance By Govt. Of India - Jan’1978.

Unit size, Stage-I 3 x 200+ Stage-II 3 x 500+

Stage-III 1 x 500, Total Capacity – 2600 MW.1st 200MW Unit commissioned - 1st Mar’83

(in 48 months from award date).1st 500MW Unit commissioned - 31st May’87 (in 57 months from award date)

Stage-III commissioned on - 21st March’11

Page 9: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

KORBA SUPER THERMAL POWER STATION IS AN ISO 9001(2000), IS0 14001, ISO 18001, OHSAS & 5S CERTIFIED, 2600MW

POWER STATION LOCATED AT JAMNIPALI VILL. OF KORBA DIST. IN CHHATTISGARH. IT IS A COAL FED STATION & WATER IS SOURCED FROM

HASDEO BARRAGE.

KORBA

Page 10: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

COAL TO ELECTRICITY

Page 11: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Coal to Electricity ….. Basics

Coal

Chemical Energy

Super Heated Steam

Pollutants

Thermal Energy

Turbine Torque

Heat Loss In Condenser

Kinetic Energy

Electrical Energy

Alternating current in Stator

Mech. Energy Loss

ASHHeat

Loss

Elet. Energy Loss

Page 12: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

COAL TO ELECTRICITY

S W ITC H Y A R D /G R ID

G E N E R A TO R TR A N S F O R M E R

G E N E R A TO R

TU R B IN E

B O IL E R

P U L V E R IZ E R

B U N K E R

C R U S H E R

TR A C K H O P P E R

M G R

M IN E S

Page 13: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

MINES

MINES: GEVRA(SOUTH EASTERN COALFIELD LTD)

TYPE: OPEN CAST MINES

COAL SIZE :<100MM

TYPE OF COAL: E& F GRADE

Page 14: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 15: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

MINED COAL BY SURFACE MINER

Page 16: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

GRADING OF COAL

GRADE KCAL/KG

A >6200

B 5600-6200

C 4490-5600

D 4200-4490

E 3360-4200

F 2400-3360

G 1300-2400

Page 17: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

MINES

TWO SILOS AT MINES END OF CAPACITY:2400 TONS

LOADING FACILITY

WEIGHING FACILITY

Page 18: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

SILOSILO

Page 19: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 20: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

MGR(MERRY GO ROUND SYSTEM)

Page 21: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

MGR(MERRY GO ROUND SYSTEM)

CAPTIVE RAIL TRANSPORTATION SYSTEM LINKING MINES AND PLANT

MOST ECONOMIC & RELIABLE

LOADING : FAST,ACCURATE & MAXIMUM UTILISATION

UNLOADING: FAST AND EASY

Page 22: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

MGR(MERRY GO ROUND SYSTEM)

MINES END

NTPC END

TRACK HOPPERS

SILOS

TOTAL TRACK LENGTH: 34.80 KM

LENGTH OF LOAD LINE: 14.86 KM

LENGTH OF EMPTY LINE: 19.94 KM

RAIL TRACK

Page 23: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

MGR(MERRY GO ROUND SYSTEM)

ONE WAGON CAPACITY: 60-65 TONS

ONE RAKE : 34 WAGONS~ 2000 TONS

TOTAL RAKES IN A DAY~ 19

WAGON TYPE: BOTTOM DISCHARGE (PNEUMATIC)

Page 24: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

MGR(MERRY GO ROUND SYSTEM)

WAGON

Page 25: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

MGR(MERRY GO ROUND SYSTEM)

WAGON

Page 26: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

MGR(MERRY GO ROUND SYSTEM)

SPEED OF WAGONS DURING LOADING:0.8 KM/HR

TOTAL TIME FOR LOADING :35-40 MINUTES

TRAVEL TIME: 30 + 30 MINS

Page 27: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

TRACK HOPPERS

UNDERGROUND HOPPER AT POWER STN END FOR UNLOADING

TRACK HOPPER 1&2 FOR ST-1(200MW) AND ST-2 (500MW) RESPECTIVELY

TRACK HOPPER –1 : 3000 TON

TRACK HOPPER –2 : 3200 TON

Page 28: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

TRACK HOPPERS

HOPPER HOLE

Page 29: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

TRACK HOPPERS

Page 30: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

TRACK HOPPERS

HOPPER OPNNING

CONCRETE AND STEEL PLATE

CONVEYOR BELTS

BELT SUPPOTER

Page 31: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

TRACK HOPPERS

WAGON UNLOADING : BY OPENING BOTTOM DISCHARGE HOPPERS

DISCHARGE HOPPER: PNEUMATIC OPERATION WITH EXTERNAL DC SUPPLY

TOTAL UNLOADING TIME:~25 MINS

Page 32: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

CHPCOAL HANDLING PLANT

TRANSPORTS COAL FROM TRACK HOPPERS TO BUNKERS AT MAIN PLANT

THROUGH PADDLE FEEDERS,CONVEYOR BELTS, CRUSHERS ETC

ALSO STACKS THE COAL IN STACKYARD AND RECLAIMS WHEN NEEDED

Page 33: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

CHPCOAL HANDLING PLANT

TRANSFERS COAL FROM TRACKHOPPERS ON TO CONVEYOR BELTS:

4 NOS IN EACH TRACK HOPPER 1&2

ELECTRICALLY DRIVEN

PADDLE FEEDERS:

Page 34: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

PADDLE FEEDER

Page 35: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 36: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

CHPCOAL HANDLING PLANT

CONVEYOR BELT

TRANSPORTS COAL FROM ONE PLACE TO OTHER

CAPACITY: 2000 TON/HR

MATERIAL:COMPOUND OF NYLON/POLYESTER ETC WITH RUBBER COATING.

100% STANDBY

Page 37: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

CONVEYOR BELT

Page 38: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 39: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 40: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 41: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

CHPCOAL HANDLING PLANT

CRUSHER

CRUSHES COAL FROM 100 mm SIZE TO <20 mm SIZE

FOUR CRUSHER EACH IN ST-1&ST-2

TWO CRUSHER RUNS AT A TIME

Page 42: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

CRUSHER

Page 43: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

HAMMER

SECTION PART

Page 44: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

TRACK HOPPER

CRUSHER

TO BUNKERS

STACKYARD

CHPCOAL HANDLING PLANT

Page 45: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

CHPCOAL HANDLING PLANT

STACKING & RECLAIMING

STACKING WHEN EXCESS COAL

RECLAMING DURING LEAN PERIOD

STACKER- RECLAIMER IS USED

Page 46: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

STACKER/RECLAIMER

Page 47: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

STACKER/RECLAIMER

Page 48: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

CHPCOAL HANDLING PLANT

BUNKERS

6 BUNKERS (EACH 390 TON CAP) IN A 200 MW UNIT

9 BUNKERS (EACH 900 TON CAP) IN A 500 MW UNIT

TRIPPER CONVEYORS FOR TRANSFERING COAL FROM CONVEYOR TO BUNKER

Page 49: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

BUNKERS

Page 50: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 51: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

PULVERIZER

FEEDER

BUNKER

MAIN PLANT

Page 52: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Clean Out Conveyor

Coal Bunker

Coal Feed Pipe Coal Feed Pipe

Motor

Encoder Encoder

Load cell Load cell

Silo gate Silo gate feeder pannel feeder pannel

COB Switch COB Switch

Conveyor BeltConveyor Belt

Page 53: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

MAIN PLANT

FEEDER

TRANSFERS COAL FROM BUNKERS TO MILL/PULVERIZER

VARIABLE SPEED

DC OR AC MOTOR DRIVEN

Page 54: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

MAIN PLANT

MILL/PULVERIZER

PULVERIZES COAL FROM 20 MM SIZE TO 200 MESH SIZE i.e> 70% SHOULD PASS THRU 200 MESH(200 HOLES/SQ.INCH)~ 75 MICRON

BOWL ROTATED BY MOTOR AND 3 ROLLERS AT 120 DEG APART (BOWL MILL)

PULVERIZED COAL IS TAKEN TO BOILER BY HOT+COLD PRIMARY AIR

Page 55: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Mills (Bowl Mill)

Page 56: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Hot Air Gate

Cold Air

Inspection Door Coal Coal MillMill

Hot Air Duct

Scraper Housing

Hot Air Damper

Gear Housing

Classifying System

Coal from bunkerCoal discharge

Air flow

Classification of desired

fineness Coal

Pulverized Coal

Dropping of undesired

coarse Coal

BOWL MILL :

Page 57: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

MILL

BUNKER

FEEDER

ESP

ID FAN

APH

PA FAN

FD FAN

CHI

MNEY

BOILER

BOILER: AIR & FLUE GAS PATH

Page 58: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

BOILER(200 MW)

• Manufacturer: BHEL, CE Design

• Type: Natural circulation, Balance draft, Corner fired, Tilting, Tangential

Page 59: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

DPNLSHTR

Platen S

HT

R

SCREEn

LTSH

ESPAPH

ID fan

Chimney

Economiser

Bottom Ash

Downcomer

Drum

waterwallFireball

Gooseneck

Reheater

Page 60: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Water WallsWater Walls

Page 61: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

DPNLSHTR

Platen S

HT

R

SCREEn

LTSH

ESPAPH

ID fan

Chimney

Economiser

Bottom Ash

Downcomer

Drum

waterwallFireball

Gooseneck

Reheater

BOILER COMBUSTION

Page 62: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

HeaderHeader

Page 63: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Boiler DrumBoiler Drum

Page 64: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

BOTTOM RNG HDR& Z-PANEL 1ST PASS W.W

1ST PASS W.W O/L HDRS ROOF I/L HEADER

2ND PASS UPPER C-HDR 2nd PASS LOWER C-HDRS

LTSH I/L HEADER LTSH O/L HEADER

D.P.I/L HEADER D.P.O/L HEADER

S.H. HEADER R.H.HEADER

2ND PASS ROOF O/L HDR(REAR ECONOMISER

M.S

H.R.HC.R.H

FROM F.R.S

500mw

Page 65: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Air PreheaterAir Preheater

Page 66: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 67: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 68: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 69: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Boiler circuit with Precipitator

Page 70: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

ELECTROSTATIC PRECIPITATOR

Page 71: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

ESP -Working PrincipleESP -Working Principle

Page 72: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

SCHEMATIC DIAGRAM

Electrostatic Precipitator

ElectronicController

High Voltage Rectifier Transformer

415 V3 PhaseSupply

Electrostatic Precipitator

AC C A C

Page 73: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Electrostatic Precipitator (ESP)

No of FieldsNo of Fields : 48: 48No of HoppersNo of Hoppers : 96 : 96Dust Concentration (I/L)Dust Concentration (I/L) : 63.1 gm/NM3: 63.1 gm/NM3

(O/L)(O/L) : 40 mg/NM3: 40 mg/NM3EfficiencyEfficiency : 99.937%: 99.937%Key equipmentsKey equipments : ERM, GDRM,CERM : ERM, GDRM,CERM

heaters, Collectors & Emittersheaters, Collectors & Emitters

Page 74: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Chimney

Page 75: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

PLANT-1

Page 76: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 77: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

HPT

IPT LPT

EXC

GEN.

CEP

COND

LPH1,2,3

DEARATOR

BFP

HPH5,6

R Y B

ECO

LTSH

RH

RHS

H

SH

BASIC WATER & STEAM CYCLE OF POWER PLANT

BOILER

Page 78: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Steam power plants operate on Modified Rankine Cycle, DM water as working fluid.

Sensible heat is added in Heaters + economiser

Steam generation takes place in waterwall.

Heat transfer in furnace and enclosed superheater takes place thru radiation.

condenserCEP

LPH

BFP

HPH+Ecow/w

SHHPT

IPT

RH

LPT

S

T

Page 79: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 80: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

MAIN PLANT

TURBINE

THREE CYLINDER: HP,IP AND LP CYLINDER

ROTATES AT 3000 RPM (DECIDED BY GRID FREQ AND GENERATOR POLE)

n=120f/P

n=speed, f=frequency of grid, P=no of poles of generator

Page 81: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

TURBINE• HP TURBINE (SINGLE FLOW)• IP TURBINE( DOUBLE FLOW)• LP TURBINE (DOUBLE FLOW)

NO OF STAGE (200 MW Turbines)

• HP TURBINE (25 STAGE)• IP TURBINE( 20+20 STAGE)• LP TURBINE(8+8 STAGE)

Page 82: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

HP TURBINE(SECTIONAL VIEW)

Page 83: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 84: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

HP turbine rotor….

Page 85: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

HP turbine inner casing….

Page 86: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Work Done in Turbine….

Page 87: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 88: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 89: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

IP Rotor….

Page 90: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

IP Inner casing

Page 91: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

IP Outercasing

Page 92: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

LP Turbine

Page 93: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 94: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Layout of Turbine-Generator

LPTGenerator

IPTHPT

TG Bearings TG Bearings

Page 95: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Condenser

Page 96: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Condenser

Hot well

Page 97: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

GENERATOR

Page 98: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Magnetic field around a current carrying conductor and

Direction of the field

Page 99: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

S

N

S

N

2πr

B(Φ)

N

SS

N

Rotor field and its traveling with rotation

Page 100: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

S

N

Generator

Page 101: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Generator

S

NN

S N

Load angle δLocking of stator and rotor fields -*- δ between rotor field & resultant field

Page 102: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Rated parameters:Maximum continuous KVA rating 247 MVAMaximum continuous KW rating 210 MWRated Terminal Voltage 15.75 KVRated Stator Current 9050 ARated Power Factor 0.85 LagExcitation voltage at MCR condition 310 VExcitation current at MCR condition 2600 AExcitation voltage at no load 102 VExcitation current at no load 917 ARated speed 3000 RPMRated frequency 50 Hz.

Page 103: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

April 11, 2023 PMI Revision 00 103

Page 104: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

1. STATOR WATER SYSTEM

2. SEAL OIL SYSTEM

3. H2 GAS SYSTEM

4. EXCITATION SYSTEM***

Page 105: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 106: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 107: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 108: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 109: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 110: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 111: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 112: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

H.T. MOTORS

Page 113: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

External fan mounted at fan NDE side

Cold Air I/L

Page 114: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 115: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

BFP ( Stage I)

CW I/L

CW O/L

2 no. of Coolers

Cooling fan 2 no.s (DE/NDE) mounted on motor shaft

Page 116: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 117: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 118: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

MAIN PLANT

GENERATOR & GENERATOR TRANSFORMER

400 KV BUS IN SWITCHYARD

GENERATOR TRANSFORMER

GENERATOR

15.75 KV 400 KV

CIRCUIT BREAKER

OUTGOINGLINE

Page 119: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Generator Transformer

Page 120: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Unit # 5500MW

Unit # 2200MW

Tie Trans# 1

K-Bhilai-2

Korba Vindh’l -1A

K-Korba (W) K-Sipat

K-Bhatapara

Korba-Vindh’l -2

K-Birsingpur -1 & 2

Unit # 4500MW

Unit # 6500MW

Unit # 7500MW

Tie Trans#2

Tie Trans#3

Tie Transf # 4

Unit # 3200MW

Unit # 1200MW

Under Construction

Proposed

K-Bhilai-1

Bus Section

G G G G G G G

Page 121: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Switchyard

Page 122: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Circuit Breaker

Page 123: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Isolators

Page 124: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Switchyard One line DiagramTransfer Bus 400 KV

Main Bus II

Main Bus I

CB CBCB

GT20.5/400KV

Gen Bay Feeder Bay

BusIsolator

Transfer Bus Bay

Page 125: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Western Region Power MapKORBA

Page 126: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

NTPC Korba CW/CT system at a glance

126

Page 127: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

CW scheme…

Reservoir/ River Canal Intake

Trash rack

TWS

CW pumps

Condenser

Hot Pond

CT pumps

Cooling tower

Page 128: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Hasdeo Barrage RBC Darri Gate

open

Stage-II3X500 MW

Stage-I3 X 200 MW

Hot pond CT- I

CT- IIOpen Cycle

Pragati

Nagar Regula

torCWPH-I

CWPH-II

Charpara Cross Regulator open

Emergency Exit

Page 129: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Hot pond

CT- I

CT- IITotal Closed Cycle

Pragati Nagar

Regulator

Stage-II3X500 MW

Stage-I3 X 200 MW

CWPH-I

CWPH-II

Hasdeo Barrage

RBC Darri Gate open

for makeup

Charpara Cross Regulator totally closed

Page 130: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Induced Draft Cooling Tower

Page 131: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Natural Cooling Tower

Page 132: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Hasdeo Barrage RBC Darri Gate partially open.

Hot pond CT- I

CT- IIPartial Closed Cycle

Pragati Nagar

RegulatorStage-II3X500 MW

Stage-I3 X 200 MW

CWPH-I

CWPH-II

Charpara Cross Regulator Partially open

Emergency Exit

Page 133: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

ASH GENERATION AND CLASSIFICATION

COALBUNKER

BOTTOM ASH COARSE ASH FLY ASH

CHIMNEY

ESPHOPPERS

ECO /APH HOPPERS

MILLING SYSTEM

BOILER

Page 134: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

134

Ash volumes and propertiesAsh volumes and properties

ESP

Pulverized

Coal

Furnace (1300 - 1500°C)

ElectrostaticPrecipitator

Sta

ge A

: 80

%S

tag

e B

: 17

%80-90 %

Sta

ge C

: 3

%

Fly Ash

Econo

mizer

Eco Ash APH Ash

1 % 1 %

Stack

Fineness

Bottom AshCoal10-20 %100 % Ash

APH

Page 135: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Overflow

BATPs

Ash Dyke

ASPs

Page 136: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

Stage –II ASPH Booster ASPH Dhanras dyke S t a g e - I I ASL # 5 BASL #1

ASL #4 BASL #2 ASL #3 BASL #3 ASL # 2 BASL #4

ASL # 1 BASL #5 ASL#4

ASL#3 ASL#2 ASL#1 S t a g e - I

STAGE-I ASPH

ASP 5A 5B 5C 4A 4B 4C 3A 3B 3C 2A 2B 2C 1A 1B 1C

Dhanras Ash Dyke

ASP : Ash Slurry Pump BASP : Booster Ash Slurry Pump ASL : Ash Slurry Line BASL : Booster Ash Slurry Line

BASP 1A 1B 1C 1D 2A 2B 2C 2D 3A 3B 3C 3D 4A 4B 4C 4D 5A 5B 5C 5D

ASP 4 3 2 1

ASH FLOW DIAGRAM (AS PER DESIGN)

Page 137: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

POINT Distance from Stg.II ASPH

(meters.) Elevation

A 00.0 289.4 B 28.0 291.4 C 560.0 299.2 D 754.9 300.2 TP-1 1091.9 298.2 TP-2 1227.2 297.5 TP-3 2007.4 300.9 TP-4 2239.6 298.0 TP-5 3717.5 297.5 TP-6 8379.1 302.8 TP-7 9506.3 315.7 TP-8 12305.0 323.0 TP-9 13739.0 340.0

Overflow Lagoon

Return water to BPH ( 3 lines)

TP-8

TP-7

BOOSTER PUMP HOUSE

TP-6

KORBA KATGHORA ROAD

LAGOON-I

LAGOON-II

Hasdeo river

D C B A KSTPS Plant Area

Ash Pipe route to Booster pump house and to Dhanras Dyke

TP-9 End Point & Starting

of garlanding

TP-2

TP-1

TP-5 MOHAN TALKIES ‘X’ ROAD

BULGI ‘X’ ROAD

TP-4

TP-3

Stg.II Ash Slurry P/H

PTS-Plant ROAD

To BCPP

N

MGR ‘X’

FCI ‘X”

Escape channel to Kasai nala

Normal spillway

Emergency discharge (below spillway)

Page 138: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

DHANRAS ASH DYKE

WHITE HOUSE

LAGOON-II

LAGOON-IALAGOON-IB

INDEX

* ****

DATE-

ASH LINES

54321

RIVER HASDEV

RWL

P.N.6

P.N.39P.N.58 P.N.88

SPILLWAY

WELL

TOTAL VALVE-32

4

5

1942

1977

P.N.188P.N.1666

P.N.236

258

268

P.N.6

P.N.330

23

1

774

721

684

657

779810847865 889938 915

998

Page 139: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

139

ASH LAGOON

Page 140: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 141: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

FLY ASH EVACUATION DRY MODE

Basic scheme for one ESP pass

TACs ASH Transportaion lines to Silo

BUFFER HOPPER

VACUUM PUMPS A1 , A2

A6

A1

A12

A7 A13

AIR LOCK TANKS A1 , A2

A18

A19

A24

BGF-Bag filter

Air and Seal water exhaust to atmosphere

BGF

Page 142: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 143: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

April 11, 2023 PMI Revision 00 143

Page 144: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')

How Generated electricity reached customer

Page 145: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
Page 146: NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')