Upload
saint-michaels-college
View
681
Download
0
Tags:
Embed Size (px)
DESCRIPTION
TESOL 2010 presentation
Citation preview
Professional Learning Communities Develop
Effective Integrated Content-Language Instruction
Rita MacDonald, Applied Linguistics [email protected]
James Nagle, Education [email protected]
Project CREATE at SMC
Curriculum Reform for the
Education of All Teachers of ELLs
Project CREATE
OELA National Professional Development Grant
Year 3 of 5 years
Goal: revise curriculum for pre-service teachers so that all teachers graduating SMC are equipped for today’s culturally and linguistically diverse classrooms
Work with three partner school districts
SMC Curriculum Placements Schools
Program Design Program DesignCourse work Instruction
Elementary Secondary
Teaching ModelShared responsibility, collaboration,
integrated content and language instruction
SMC Curriculum Placements Schools
Program Design Program DesignCourse work Instruction
Elementary Secondary
Teaching ModelShared responsibility, collaboration,
integrated content and language instruction
Winooski School District
Consists of one elementary, one middle and one high school. Total student population of 822. 76% qualify for free and reduced lunch.
26% are ELL with 22 languages spoken and most of the ELLs are recently arrived refugees in the last three years.
All but three of the sixty teachers are HQT.
All grades (3-8 & 11) have been identified as needing improvement in math and language arts.
Integrated Content-Language Instruction
Develop teacher knowledge of understanding by design and differentiated instruction (Tomlinson & McTighe, 2006)
Integrate content and language instruction for elementary science, middle school social studies and high school core content courses (VT Grade Expectations; WIDA, 2008; Zweirs, 2008)
Create teacher learning communities that plan, teach and assess integrated content and language instruction (Little, 2006) and are customized to the school’s particular needs and responsive to the realistic constraints of schooling
Professional Development Plan over 2 Years
Aug. 08
March 09
March –June 094 months
Aug. 09 September 09-presentFull school year
W W Varied W VariedK-5
2 days
district-wide
½-day
district-wide
Workshop-30 m/twice/monthAll K-5 1-day
district-wide
Workshop, 30 m /month+ observation
MS Embedded-2h/month1 team
Embedded, 2 h/month
HS Embedded- 2h/monthDepartments
PLC, 1 h/month•student work•Text analysis
ESL:CT Collaboration (shared planning or teaching)
K-5only @ event
only @ event
only @ workshops@ event
only @ workshops
MS Began co-planning for instruction
Co-planning for instruction
HS Planning @ workshop Co-teaching science & math
Professional Development Plan over 2 Years
Aug. 08
March 09
March –June 094 months
Aug. 09 September 09-presentFull school year
W W Varied W VariedK-5
2 days
district-wide
½-day
district-wide
Workshop-30 m/twice/monthAll K-5 1-day
district-wide
Workshop, 30 m /month+ observation
MS Embedded-2h/month1 team
Embedded, 2 h/month
HS Embedded- 2h/monthDepartments
PLC, 1 h/month•student work•Text analysis
ESL:CT Collaboration (shared planning or teaching)
K-5only @ event
only @ event
only @ workshops@ event
only @ workshops
MS Began co-planning for instruction
Co-planning for instruction
HS Planning @ workshop Co-teaching science & math
• English Proficiency Scores (WIDA ACCESS)
• Can Do charts for entire class
• Cultural profiles
• Choose unit to plan DI
Professional Development Plan over 2 Years
Aug. 08
March 09
March –June 094 months
Aug. 09 September 09-presentFull school year
W W Varied W VariedK-5
2 days
district-wide
½-day
district-wide
Workshop-30 m/twice/monthAll K-5 1-day
district-wide
Workshop, 30 m /month+ observation
MS Embedded-2h/month1 team
Embedded, 2 h/month
HS Embedded- 2h/monthDepartments
PLC, 1 h/month•student work•Text analysis
ESL:CT Collaboration (shared planning or teaching)
K-5only @ event
only @ event
only @ workshops@ event
only @ workshops
MS Began co-planning for instruction
Co-planning for instruction
HS Planning @ workshop Co-teaching science & math
• Understanding proficiency levels
• Strategies & tools for differentiated instruction
• ‘Apprenticing’ students into Academic English
• Writing clear Content and Language Objectives
Professional Development Plan over 2 Years
Aug. 08
March 09
March –June 094 months
Aug. 09 September 09-presentFull school year
W W Varied W VariedK-5
2 days
district-wide
½-day
district-wide
Workshop-30 m/twice/monthAll K-5 1-day
district-wide
Workshop, 30 m /month+ observation
MS Embedded-2h/month1 team
Embedded, 2 h/month
HS Embedded- 2h/monthDepartments
PLC, 1 h/month•student work•Text analysis
ESL:CT Collaboration (shared planning or teaching)
K-5only @ event
only @ event
only @ workshops@ event
only @ workshops
MS Began co-planning for instruction
Co-planning for instruction
HS Planning @ workshop Co-teaching science & math
CONTEXTUALIZED SAME TOPICS
• Understanding proficiency levels
• Strategies & tools for differentiated instruction
• “Apprenticing’ students into Academic English
• Writing clear Content and Language ObjectivesPRODUCTS
differentiated lesson/unit plans
for Fall 09
Professional Development Plan over 2 Years
Aug. 08
March 09
March –June 094 months
Aug. 09 September 09-presentFull school year
W W Varied W VariedK-5
2 days
district-wide
½-day
district-wide
Workshop-30 m/twice/monthAll K-5 1-day
district-wide
Workshop, 30 m /month+ observation
MS Embedded-2h/month1 team
Embedded, 2 h/month
HS Embedded- 2h/monthDepartments
PLC, 1 h/month•student work•Text analysis
ESL:CT Collaboration (shared planning or teaching)
K-5only @ event
only @ event
only @ workshops@ event
only @ workshops
MS Began co-planning for instruction
Co-planning for instruction
HS Planning @ workshop Co-teaching science & math
Ts also learning methodology of
inquiry-based science
+ UBD basics
Professional Development Plan over 2 Years
Aug. 08
March 09
March –June 094 months
Aug. 09 September 09-presentFull school year
W W Varied W VariedK-5
2 days
district-wide
½-day
district-wide
Workshop-30 m/twice/monthAll K-5 1-day
district-wide
Workshop, 30 m /month+ observation
MS Embedded-2h/month1 team
Embedded, 2 h/month
HS Embedded- 2h/monthDepartments
PLC, 1 h/month•student work•Text analysis
ESL:CT Collaboration (shared planning or teaching)
K-5only @ event
only @ event
only @ workshops@ event
only @ workshops
MS Began co-planning for instruction
Co-planning for instruction
HS Planning @ workshop Co-teaching science & math
Ts also learning methodology of
inquiry-based science
+ UBD basics
Difference in Teacher Products
K-5: 2-3 lesson plans with some Content Objectives, some
differentiation
MS: Ancient Civilizations course developed within three teacher team
with ELL teacher as consultant
HS: Unit plan designed in core content courses for
implementation in Fall 2009
Professional Development Plan over 2 Years
Aug. 08
March 09
March –June 094 months
Aug. 09 September 09-presentFull school year
W W Varied W VariedK-5
2 days
district-wide
½-day
district-wide
Workshop-30 m/twice/monthAll K-5 1-day
district-wide
Workshop, 30 m /month+ observation
MS Embedded-2h/month1 team
Embedded, 2 h/month
HS Embedded- 2h/monthDepartments
PLC, 1 h/month•student work•Text analysis
ESL:CT Collaboration (shared planning or teaching)
K-5only @ event
only @ event
only @ workshops@ event
only @ workshops
MS Began co-planning for instruction
Co-planning for instruction
HS Planning @ workshop Co-teaching science & math
REITERATION OF FALL 08
• English Proficiency Scores (WIDA ACCESS)
• Can Do charts for entire class
• Cultural profiles
• Revise unit based on UPDATED class profile
Professional Development Plan over 2 Years
Aug. 08
March 09
March –June 094 months
Aug. 09 September 09-presentFull school year
W W Varied W VariedK-5
2 days
district-wide
½-day
district-wide
Workshop-30 m/twice/monthAll K-5 1-day
district-wide
Workshop, 30 m /month+ observation
MS Embedded-2h/month1 team
Embedded/TLC, 2 h/month
HS Embedded- 2h/monthDepartments
PLC, 1 h/month•student work•Text analysis
ESL:CT Collaboration (shared planning or teaching)
K-5only @ event
only @ event
only @ workshops@ event
only @ workshops
MS Began co-planning for instruction
Co-planning for instruction
HS Planning @ workshop Co-teaching science & math
Professional Development Plan over 2 Years
Aug. 08
March 09
March –June 094 months
Aug. 09 September 09-presentFull school year
W W Varied W VariedK-5
2 days
district-wide
½-day
district-wide
Workshop-30 m/twice/monthAll K-5 1-day
district-wide
Workshop, 30 m /month+ observation
MS Embedded-2h/month1 team
Embedded, 2 h/month
HS Embedded- 2h/monthDepartments
PLC, 1 h/month•student work•Text analysis
ESL:CT Collaboration (shared planning or teaching)
K-5only @ event
only @ event
only @ workshops@ event
only @ workshops
MS Began co-planning for instruction
Co-planning for instruction
HS Planning @ workshop Co-teaching science & math
Professional Development Plan over 2 Years
Aug. 08
March 09
March –June 094 months
Aug. 09 September 09-presentFull school year
W W Varied W VariedK-5
2 days
district-wide
½-day
district-wide
Workshop-30 m/twice/monthAll K-5 1-day
district-wide
Workshop, 30 m /month+ observation
MS Embedded-2h/month1 team
Embedded, 2 h/month
HS Embedded- 2h/monthDepartments
PLC, 1 h/month•student work•Text analysis
ESL:CT Collaboration (shared planning or teaching)
K-5only @ event
only @ event
only @ workshops@ event
only @ workshops
MS Began co-planning for instruction
Co-planning for instruction
HS Planning @ workshop Co-teaching science & math
Varied Process = Varied
Outcomes
Professional Development Plan over 2 Years
Aug. 08
March 09
March –June 094 months
Aug. 09 September 09-presentFull school year
W W Varied W VariedK-5
2 days
district-wide
½-day
district-wide
Workshop-30 m/twice/monthAll K-5 1-day
district-wide
Workshop, 30 m /month+ observation
MS Embedded-2h/month1 team
Embedded, 2 h/month
HS Embedded- 2h/monthDepartments
PLC, 1 h/month•student work•Text analysis
ESL:CT Collaboration (shared planning or teaching)
K-5only @ event
only @ event
only @ workshops@ event
only @ workshops
MS Began co-planning for instruction
Co-planning for instruction
HS Planning @ workshop Co-teaching science & math
Varied Outcomes
•Meet monthly, 30 Ts at once, 30 minutes
•Effective differentiation across English proficiency levels (WIDA
2-5)
•Widespread use of SIOP strategies in Science, spreading to other
lessons
•Beginning to use UBD learning objectives effectively
•Increased focus on Academic English, explicit language
instruction (strategies from SIOP and Zwiers)
-----------------------------
•No shared ESL: gen ed planning time + no opportunity for peer
observation leaves Ts dependent on outside ESOL expertise
Professional Development Plan over 2 Years
Aug. 08
March 09
March –June 094 months
Aug. 09 September 09-presentFull school year
W W Varied W VariedK-5
2 days
district-wide
½-day
district-wide
Workshop-30 m/twice/monthAll K-5 1-day
district-wide
Workshop, 30 m /month+ observation
MS Embedded-2h/month1 team
Embedded, 2 h/month
HS Embedded- 2h/monthDepartments
PLC, 1 h/month•student work•Text analysis
ESL:CT Collaboration (shared planning or teaching)
K-5only @ event
only @ event
only @ workshops@ event
only @ workshops
MS Began co-planning for instruction
Co-planning for instruction
HS Planning @ workshop Co-teaching science & math
Varied Outcomes
•Eclipse team meets weekly, 90 minutes, to review progress of Ancient
Civilizations course, modify lesson and unit plans based on analysis of
student work
•Team meets with ELL teacher & SMC professor monthly to analyze
student performance on formative & summative assessments (WIDA
levels 2-5)
•Over 2009-10, teachers move from cursory knowledge of WIDA
standards and MPIs to developing specific MPIs and language objectives
for unit and lesson plans
•Currently, in monthly meetings teachers analyze language level of
resources, differentiate texts for WIDA language proficiency level, and
analyze student writing to modify writing instruction
Professional Development Plan over 2 Years
Aug. 08
March 09
March –June 094 months
Aug. 09 September 09-presentFull school year
W W Varied W VariedK-5
2 days
district-wide
½-day
district-wide
Workshop-30 m/twice/monthAll K-5 1-day
district-wide
Workshop, 30 m /month+ observation
MS Embedded-2h/month1 team
Embedded, 2 h/month
HS Embedded- 2h/monthDepartments
PLC, 1 h/month•student work•Text analysis
ESL:CT Collaboration (shared planning or teaching)
K-5only @ event
only @ event
only @ workshops@ event
only @ workshops
MS Began co-planning for instruction
Co-planning for instruction
HS Planning @ workshop Co-teaching science & math
Varied Outcomes
•Faculty discuss unit and lesson plans for WIDA language proficiency levels
of 2-5 – modifying lessons with differentiated resources and formative
assessments
•Faculty analyze student work, specifically writing samples, to modify
writing instruction
•All core content faculty (language arts, math, history, science) meet
monthly with ELL faculty as department teams to review and develop unit
and lesson plans using Zweirs’ strategies for language structure and
vocabulary
•Currently, in monthly meetings faculty conduct discourse analysis on
content specific texts using the systemic functional language approach (Fang
& Schleppegrell, 2008)
Recommendations Need to start where Ts are and work from there.
PD needs to be integrated into Ts’ planning, teaching and assessment programs, using their tools and formats.
PD needs to be responsive to the context of the school. Work with teachers during the school day. Intensive front-loading of information can be a start, but PD needs to be embedded into teachers’ work with their curriculum and lessons.
References
Echevarria, Vogt and Short. (2008) Making Content Comprehensible for English Learners: The SIOP Model,
Third Edition. Pearson
Fang, Z. & Schleppegrell, M. (2008). Reading in secondary content areas: A language-based pedagogy. Ann
Arbor, MI: University of Michigan Press.
Tomlinson, C. A. & McTighe, J. (2006). Integrating Differentiated Instruction and Understanding by
Design. Alexandria, VA: ASCD
Vermont Grade Level Expectations for content area and grade level
http://education.vermont.gov
WIDA Standards for Language Standards www.wida.us
Winooski School District (2009). The Report on the Effectiveness of the Winooski School District.
Zwiers, J. (2008) Building Academic Language: Essential Practices for Content Classrooms, Grades 5-12.
Wiley.
CREATE website http://academics.smcvt.edu/CREATE/Default.htm