25
Lockout/Tagout Lockout/Tagout

Lockout tagout2

Embed Size (px)

Citation preview

Page 1: Lockout tagout2

Lockout/TagoutLockout/Tagout

Page 2: Lockout tagout2

22

Worker Training of Electrical Hazards Including Arc Flash SH-16614-07

This material was produced under grant number SH-16614-07 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not necessarily reflect the views or policies of the U.S. Department of Labor, nor does mention of trade names, commercial products, or organizations imply endorsement by the U.S. Government.

Page 3: Lockout tagout2

33

OverviewOverview

• Introduction

• Application

• LO/TO Program

• Lockouts Types

• Training

• Contractors

Page 4: Lockout tagout2

44

IntroductionIntroduction

– Estimated to prevent• Approximately 120 fatalities

per year• 28,000 serious injuries• 32,000 minor injuries

• Lockout/Tagout is a horizontal standard which means all industries must comply.

Page 5: Lockout tagout2

55

IntroductionIntroduction

• LO/TO accidents are severe– Average lost work days for

failure to LO/TO is 24 days per injury

– 7% of all fatalities are related to failure to LO/TO

Page 6: Lockout tagout2

66

IntroductionIntroduction

• Purpose of the Control of Hazardous Energy Program:

– If a risk exists to any person on unexpected start up, all protective measures are taken to isolate all sources of hazardous energy.

Page 7: Lockout tagout2

77

ApplicationApplication

Application of Lockout/Tagout is required:– when servicing and/or maintaining machines

or equipment,– if it is necessary to remove a guard or bypass

safety device or interlock,– if employee has the potential to be exposed to

material being processed or machine cycle.

Page 8: Lockout tagout2

88

ApplicationApplication

The Lockout/Tagout standard does not apply to:

– Cord and Plug Electrical Equipment• plug under exclusive control of employee

performing servicing or maintenance

– Hot Tap operations..transmission and distribution systems..water,gas, stream or petroleum products

• continuity of service essential• shutdown of system is impractical• documented procedures are followed

Page 9: Lockout tagout2

99

LO/TO ProgramLO/TO Program

• Responsibility of the program is assigned to a responsible person.

– lock acquisition

– safe work procedures

– training coordination

– contractor coordination

– assist supervisors in implementation and enforcement of disciplinary actions for non-compliance

Page 10: Lockout tagout2

1100

LO/TO ProgramLO/TO Program

• Conduct periodic inspections

• Document changes in control program as result of inspections

• Assist in development of specific procedures

• Maintain program availability for employees and interested persons

Page 11: Lockout tagout2

1111

LO/TO ProgramLO/TO Program

• Any employee who may be involved in the operation, installation, service or maintenance of any machine or equipment that has potential for release of hazardous energy is authorized to Lockout/Tagout if he or she is trained.

Page 12: Lockout tagout2

1122

LO/TO ProgramLO/TO Program

Authorized Employee• Person who locks

out or tags out machine

• Appendix of the LO/TO Program contains a list of Authorized Employees

Page 13: Lockout tagout2

1133

LO/TO ProgramLO/TO Program

Authorized

Page 14: Lockout tagout2

1144

LO/TO ProgramLO/TO Program

• Affected employees are those employees whose job requires them to operate machine or process on which maintenance or service is being performed. – Need to be notified on shutdown and start up.

Page 15: Lockout tagout2

1155

LockoutsLockouts

• Individual Lockout:

– Shut down, control off, lockout– Stored energy dissipated, isolated– Operate controls for operation, verify OFF– Work may proceed– If shift changes, individual LO/TO repeated by

next shift

Page 16: Lockout tagout2

1166

LockoutsLockouts

• Individual restoration to service:

– Replace all guards and safety devices– Notify all personnel/affected employees– Vents and bleeders closed, blinds removed,

blocks and tags removed– Each employee removes his or her lock

Page 17: Lockout tagout2

1177

LockoutsLockouts• Group Lockout:

– Same as individual lockout except• Operations personnel will place keys in lock box…

and fill out “Isolation List for Group Lockout”• Operations turns equipment over to Maintenance

Department • Maintenance will place their personal lock and

complete work• update “Isolation List”

Page 18: Lockout tagout2

1188

LockoutsLockouts• Group restoration to service:

– Maintenance - replaces all guards and safety devices

– Maintenance - notifies all Personnel/Affected Employees

– Vents and bleeders closed, blinds removed, blocks and tags removed

– Maintenance and Operations - each employee removes his or her lock

Page 19: Lockout tagout2

1199

LockoutsLockouts

• Long Term Safety Lockout:

– Extended period of time… discontinued ...not longer part of operation

– Long term locks available for use by the responsible person

Page 20: Lockout tagout2

2200

TrainingTraining

Additional Training for Authorized Persons

– When implementation is required.– Recognition of hazardous energies.– Returning equipment to service.– If questions on application specific actions to

be taken.

Page 21: Lockout tagout2

2211

TrainingTraining

Additional training required if . . .– new equipment is

introduced– changes in LO/TO

equipment– periodic audit

identifies need

Page 22: Lockout tagout2

2222

MCCMCC

Page 23: Lockout tagout2

2233

ContractorsContractors

• Exchange of LO/TO procedures

• Agreement of procedures before work begins

• Discipline of contractor and/or contractor employee(s) for failure to LO/TO

Page 24: Lockout tagout2

2244

DANGER!DANGER!

Page 25: Lockout tagout2

2255

Questions?