Upload
firnando-buenayre
View
5.707
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Citation preview
Building Capacity to deliver Quality
Experiences iGCDP
Role of HOST ENTITY in GCDP
Ensuring AIESEC Support to EP
including accommodation,
support, logistics, travel etc!
JD Alignment between EP and the project/NGO along with the
right expectation setting
Effective Integration of EP
into the city, culture etc!
START UP LC0-10 Realisations LCVP Comm/
Marketing
Member 1 Member 2
KPI:• Number of EP’s Raised
(that fit the right Matchable EP Profiles)• # of Leads/ Registrations from each strategy• Increased Conversation Rate from Sign up to
Raise
NOTE: • Marketing team has 1-3 members (including
LCVP)• Marketing Team needs to focus on
establishing their market penetration for just 1 Programme (oGIP/oGCDP) and just 1-2 Sub-products/ Issues under this programme
10 to 40 Realisations
30 to 70+ Raised
50 to 150+ Sign ups
(Ideally, Sign up to Raise Conversion rate is greater than 30%)
Sample Backwards Planning:
This means that recruitment activities must be focused enough to get this number of registrations from the right target market
Based on Statistics, how many Raises do you nee to get this many realisations?
Based on Statistics, how many Sign-ups do you nee to get this many raises?
STA
RT
HER
E
WHY?
Right number of People to
Deliver high volume QUALITY
Experiences
Clear JD and KPI for
members working on delivery
Growing in Exchange means we NEED to have
enough People to MANAGE experiences for high
quality. This is the most important!
HOW?
STEP 1:
Plan for Capacity for Quality
STEP 2:
Structure, JD and KPI in different LC Volumes in
iGIP
STEP 1: Plan for Capacity for Summer
Use the TM Planning tool to plan
iGCDP
STEP 1: Plan for Capacity for Summer
Here enter number of
interns/EPs one member can deliver Eg: 1
member – 3 EPs
iGCDP
STEP 1: Plan for Capacity for Summer
That number from slide 2 will multiply
with Re goal you enter for the quarter so you
know how many members are needed for delivery in each
programme
iGCDP
GCDP Clustering for LC
iGCDPBeginner 0-25 X RE
Intermediate 25-100 X REAdvanced 100-200 X RE
Mature +200 X RE
STEP 2: Create structures for quality delivery
Structures by Volume of
Realizations the LC does
Customize your structures for the
fruit peak if needed
STEP 2: An LC that has planned between 0-25 in 2014
Basic Consideration:• As start up, LC manage the basic process of
iGCDP delivery• There is no need to manage iGCDP as a
project yet - in general experience delivery will be TN based
• Member Efficiency: 0-4 X / member
Number of members: Use TM Planning tool to determineJob Description:• Selling and raising, matching, and realizing• Incoming preparation seminar• Experience Co-delivery
VP
Member
Member
Member
∞Ra-Ma-Re
STEP 2: An LC that has planned between 0-25 in 2014
JD for Delivery
0 Supporting Eps through the match process (especially for visa) and at realization 0 Delivery through fulfilling all exchange minimums 0 Very important: Airport pick up, Logistics, Supporting Accommodation of EPs , Integration of EPs, Ensuring alignment
between EP and company0 FAST firefighting on NPS in case of any EP issues/complaints0 Showcasing promoter EP stories 0 During sales process ensure there is clear understanding of JD so that there is no issue in JD alignment at the realized
stage
Recommendation: Even though most detractor issues/comments are at realized stage, by taking the right actions (through the right JD) during raise and match, the level of issues at the realized stage
can be decreased!
STEP 2: KPI within the structure
KPI 1:
For a single member - % of Promoters/Total Realizations of the member
For a Team - % of Promoters/Total Realizations of the team
KPI 2:
Reducing/Eliminating the largest detractor issue of the LC/MC
STEP 2: An LC that has planned between 25-100 in 2014
VP
OCP OCP OCP
∞Ra-Ma-Re
∞Ra-Ma-Re
∞Ra-Ma-Re
Number of members: Use TM Planning framework Job Description:• Selling and raising, matching, and realizing• Project concept development and execution• Incoming preparation seminar• Experience Co-delivery (country-country partnership management)
• LCs have more capacity in project management
• Project concept will be centralized Nationally (National project implementation in LCs)
• Start to have the needs of event/project management
STEP 2: JD within the structure
JD of Delivery members in the team
During Raising period During Matching period
During Realization
• Ensure clear and high quality JD in a specific issue segment and for a specific national project
• Clear expectation setting with NGO about role of EP, salary etc.
• Visa Support (The key issue is Eps want MORE and ACCURATE information about the process and documents related to visa)
• As soon as matches are confirmed start working on accommodation
• By now accommodation should be confirmed and ready
• Arrange for EP Pick up and integration into the LC and city
• Trainee Buddy assigned for EP
STEP 2: JD within the structure
JD of Delivery members in the team
Who is a trainee buddy? – An LC member (doesn’t need to be only from the iGIP team) who is responsible for meeting and communicating with the EP regularly, who support the delivery team in the EP Pick up, integration etc
Having trainee buddy makes the job of a delivery team simpler and also allows members to have a great experience interacting with Eps
At this stage, make sure you are firefighting fast on NPS incase EP has a comment/issue
During Realization
• By now accommodation should be confirmed and ready
• Arrange for EP Pick up and integration into the LC and city
• Trainee Buddy assigned for EP
• Induction meeting with EP and company
STEP 2: JD within the structure
Synergy of members in the team
- Since each team is working on projects and is responsible for the whole exchange process, the synergy between the 3 teams and members within the team has to be very good:
1. Each member is responsible for the right raise and expectation setting with NGO
2. There is/are specific member working on ensuring the visa information and process
3. There are 2-3 members working on accommodation while the others are working on airport pick up, logistics, trainee buddy etc.
Each member is responsible for
his/her raised and matched EPs
Big tasks needed for all Eps like
accommodation etc are done by
specific members
STEP 2: KPI within the structure for delivery members in the team
KPI 1:
For a single member - % of Promoters/Total Realizations of the member
KPI 2:
Reducing/Eliminating the largest detractor issue of the LC/MC
STEP 2: Ideal duration of teams
Makes sense for teams to be for 3-4 months – This gives members time to deliver the
Realization effectively
It is important to MAKE SURE that once the
team duration ends the same members are communicating and
supporting Eps and this is still part of their role
iGCDP EPs generally are in the LC for 6-8 weeks so even if a members term ends, he/she can continue being responsible for his/her realization
STEP 2: An LC that has planned between 100-200 in 2014
VP
OCP (Nat’l) OCP (Nat’l) OCP (Nat’l) OCP (Local)
Number of members: Use TM Planning FrameworkJob Description:• Selling and raising, matching, and realizing• Project concept development and execution• Project brand management• Incoming preparation seminar• Experience Co-delivery (LC-LC partnership management)
Basic Consideration:• LC is considered to have the capacity in
understanding Project management concept and put into implementation
• LC has capacity in innovate a project based on issue
• Member Efficiency: 4-6 X /member
STEP 2: JD within the structure
JD of Delivery members in the team
• The JD is very similar to LCs doing 25-100
The 2 key differences are:
1. Since the volume is more in this case, LC can start working on outsourcing some services to make processes more efficient
2. This LC structure is working on local projects as well as national projects implementation so make sure the local project delivery is very well planned
STEP 2: JD within the structure
JD of Delivery members in the team
During Raising period During Matching period
During Realization
• Ensure clear and high quality JD in a specific issue segment and for a specific national project
• Clear expectation setting with NGO about role of EP, salary etc.
• Visa Support (The key issue is Eps want MORE and ACCURATE information about the process and documents related to visa)
• As soon as matches are confirmed start working on accommodation
• By now accommodation should be confirmed and ready
• Arrange for EP Pick up and integration into the LC and city
• Trainee Buddy assigned for EP
STEP 2: JD within the structure
JD of Delivery members in the team
Who is a trainee buddy? – An LC member (doesn’t need to be only from the iGIP team) who is responsible for meeting and communicating with the EP regularly, who support the delivery team in the EP Pick up, integration etc
Having trainee buddy makes the job of a delivery team simpler and also allows members to have a great experience interacting with Eps
At this stage, make sure you are firefighting fast on NPS incase EP has a comment/issue
During Realization
• By now accommodation should be confirmed and ready
• Arrange for EP Pick up and integration into the LC and city
• Trainee Buddy assigned for EP
• Induction meeting with EP and company
STEP 2: An LC that has planned 200+ in 2014
VP
OCP OCP OCP OCP Mid. Manager
• With high volume of iGCDP delivery, Project team need to be really focus on Customer experience
• Prevent the tendency of non- innovative JDs• Account management and Customer loyalty for
Organization management (TN Takers, Learning partners, etc)
• Multi stakeholders and another level of accommodation management
• Every team does all Raise – Match – Realize process (5-6 members)
• Full responsibility in managing Inner-Outer journey of EP
• Have other separate team/person managing stakeholders or other process outside exchange process delivery
• Example JD for Middle Management person:• Customer Loyalty for Organization (partner
relation management)• Accommodation management (home stay
program)
VP
OCP OCP OCP OCP Mid. Manager
STEP 2: An LC that has planned 200+ in 2014
STEP 2: JD within the structure
The middle manager in the structure and his/her team manage EXPERIENCE DELIVERY
Middle Manager and team
Account Managers
- Market research- Selling and marketing
- CRM- Re-Raising
Hosting
- Managing “Hosting Program” Product
- Managing Allocation Process to accommodation and
host families- Managing EP Reception and
Accommodation
STEP 2: JD within the structure
0 The OCP teams are very involved with EP Preparation (virtually), EP Integration into project and delivery of inner-outer journey but the Middle manager team is focused on accommodation, host family (Hosting Programme Product) and Reception activities – this is the division of JD between both teams
0 This means there has to be good synergy between teams and alignment of exchange timeline
0 In case of high volume LCs, it is important for the whole LC to support EP Integration and EP Reception to deliver high quality experiences!
STEP 2: KPI within the structure for delivery members in the team
KPI 1:
For a single member - % of Promoters/Total Realizations of the member
KPI 2:
Reducing/Eliminating the largest detractor issue of the LC/MC