Integrated Project OF Introduction to Drawing AND Construction
Industry
GROUP UNKNOWN Leader:SU BANG ZHENG Member:SII Siaw Hua :Ryan Bunsu :Ng Sheng Zhe :Qayyum
:Pui Chun Shian :Mashruk Asad
Title:Architect
what is an architect
ARCHITECT IS A PERSON WHO DESIGNS BUILDINGS
AND ADVISES IN THEIR CONSTRUCTION.
INTRODUCTION TO CONSTRUCTION INDUSTRY
RESPONSIBILITIES &
TASK AT DIFFERENT STAGES OF CONSTRUCTION
& THE SCOPE OF WORK HANDLE BY ARCHITECT
attend site meeting or analysis and other problem which may
be critical
Need to know the full detail of the project and follow the
required and some request by clients
Work with other professional such as engineer and QS
Inform clients other professional required
The Architect has the authority to order inspection or testing of the Work by
contractor.
writing the term of condition of the appointment and request
confirmation
state the clients’ financial limit and request to the Professional
BEFORE CONSTRUCTION1.meet with clients
2.communicate with other professionals
3.participate in all meetings
4.research for design criteria
5.report progress to clients
6.prepare blueprints
7.submit the drawings to the
clients
• Second phase in the design of a project
• From the sketch for the initial design
• provides Conceptual Site Plans, Preliminary Building Plans, Sections, Elevations and/or other drawings required to communicate the design intent.
• Allow 2-3 weeks for the process
Schematic Design/Sketch
• GATHER ALL THE INFORMATION
• THE ARCHITECT COMES UP WITH KEY CONCEPT AND ROUGH SKETCHES.
• ALLOW 1-2 WEEKS FOR THE PROCESS
1.Initial Design
2.Schematic design
• Second phase in the design of a project
• From the sketch for the initial design
• provides Conceptual Site Plans, Preliminary Building Plans, Sections, Elevations and/or other drawings required to communicate the design intent.
• Allow 2-3 weeks for the process
3.Design
development• Turn a rough sketch into the real
building design complete with floor plan,roof design etc.
• Include scale drawing,basic structural plan,and basic specification for main components of a building
• Allow 2 weeks for this process
4.Construction document
• The blueprint are prepare to obtain the building permit.
• The blueprint should be detail enough that you can get apple-to-apple bids from contractor and sub-contractor
• Answering queries from the various contractor and sub-contractor
• Analysis and checking tender compliance
• Architect and clients will cooperate evaluate and choose the best contractor or sub-contractor(lowest price)
5.BIDDING OR NEGOTIATION
During constructionadvise clients on stage payment
Solve the problem.
inspecting the building work
observe the site progress.
be the middle man between clients and contractor
6.Construction Administration
• Architect function as the owner’s agent • preparing additional detailed drawing if needed • approving the contractor’s request for progress
payment(ensure that the price is fair and reasonable) • resolving any issues stemming from conflicts.
After construction
• Part of the payment due to the builder – the retention – is held back for up to twelve months and is only paid out on the architect’s instruction, after any defects have been rectified by the contractor
• Remember that the architect’s Opinion on Compliance with Planning and Building Regulations is subject to work not being changed during construction.
TYPE&FUNCTION OF ARCHITECTURAL DRAWING
AND
STAGE&EXAMPLE USED TO COMMUNICATION IDEA
INTRODUCTION TO DRAWING
Architectural drawing
• type of drawing gives a complete view of building.
• usually use A0 size paper (841mm X 1189mm)
• to develop the rough sketch
• have a better communication idea.
1.SketchingFunction
BUBBLE DIAGRAM
& PRELIMINARY
DESIGN
2.Schematic design
FUNCTION
can used to represent the flows.
To develop,explore,communicate idea and solution.
i)Bubble Diagram
ii)Preliminary design
FUNCTION TO EXPLORING DESIGN CONCEPT,MATERIAL SELECTION,AND A BASIS FOR THE PREPARATION OF FINISHED WORKING DESIGN
3.Presentation drawing
FunctionTo explain the merits of the building
WORKING DRAWING
& DETAIL DRAWING
4.Design Development
i)WORKING DRAWING
Location Drawing
Assembly Drawing
Component Drawing
Location drawingFunction
• show the location of construction element.
Floor plan
• Define the spaces & its functional relationship
Fix window Bay window
Pocket door Bifold door
Project brief
Roof
BUILDING ELEVATION
Function To show four main faces of a building:north,south,east & west.
Assembly drawing
Function to list all parts and sub-assemblies that make the final product.
Function It can shows individual components in the unfixed state
Function• TO SHOW HOW THE COMPONENT PART FIT
TOGETHER. • TO SEE CLEARLY HOW THE INDIVIDUAL PART
MADE
ii)DETAIL DRAWING
Thank You!!
Reference• http://www.slideshare.net/FiQahhAmiNn/types-of-
drawing-29679170• http://www.prospects.ac.uk/
architect_job_description.htm• http://gilespike.com/roles-and-responsibilities.html• http://www.lowneyarch.com/process/schem.html• http://www.planningportal.gov.uk/uploads/1app/
maps_plans_and_planning_apps.pdf• http://www.aia.org/aiaucmp/groups/secure/documents/
pdf/aiap026834.pdf• http://perkinswill.com/sites/default/files/ID
%202_PWRJ_Vol0401_01_Architectural%20Services%20During%20Construction.pdf