8/8/2019 Wesco Safety in Electricity Distbn
2/15
ACCIDENTS AND REASONSACCIDENTS AND REASONSTHEREOFTHEREOF
UnauthorisedUnauthorised personspersons workingworking onon line/equipmentsline/equipments WorkingWorking withoutwithout obtainingobtaining properproper lineline clearanceclearance WorkingWorking withoutwithout usingusing safetysafety appliancesappliances
WorkingWorking withoutwithout properproper instructionsinstructions ofof superiorssuperiors WrongWrong feedbackfeedback fromfrom personspersons whowho receivereceive thethe
lineline clearanceclearance
Negligence,Negligence, carelessness,carelessness, hastehaste andandoverconfidenceoverconfidence IntoxicationIntoxication whilewhile workingsworkings onon livelive lines,lines, lacklack ofof
knowledgeknowledge ofof systemsystem networknetwork
8/8/2019 Wesco Safety in Electricity Distbn
3/15
ImproperImproper coordinationcoordination LowLow clearanceclearance arisingarising outout ofof roadroad wideningwidening andand
heighteningheightening
ExcessiveExcessive sagsag ofof lineline conductorconductor ConstructionConstruction ofof buildingbuilding inin closeclose vicinityvicinity ofof highhigh
voltagevoltage && lowlow voltagevoltage lineslines
AttemptAttempt toto stealsteal electricityelectricity (hooking(hooking ))
LongLong serviceservice connectionconnection lineslines withoutwithout properpropersupportssupports
IgnoranceIgnorance ofof consumerconsumer andand publicpublic DownDown endend // snapsnap conductorsconductors notnot dealtdealt properlyproperly
ACCIDENTS AND REASONS THEREOFACCIDENTS AND REASONS THEREOFContd..Contd..
8/8/2019 Wesco Safety in Electricity Distbn
4/15
PRECAUTIONS TO BE OBSERVED FORPRECAUTIONS TO BE OBSERVED FORAVOIDING ACCIDENTSAVOIDING ACCIDENTS
Till LC is received from all sources every line or equipmentshall be treated as live Relay coordination should be ensured with OPTCL & other
CPPs for clearance of faulty feeder at shortest possible time All consumers irrespective of category should be instructed
not to connect Generators, Inverters etc. without any expresspermission from the utility company Hang danger board at all strategic places to ensure safety at
work spot Enforcing safety rules and procedures
No compromise / second thought on using safety appliances
State own authorities like PWD, NH, roads and buildings andother agencies should take approprite approval beforeexecuting their projects
Safety rules and procedures should be displayed atconspicious places, print and electronic media for awarenessof the consumer and general public
8/8/2019 Wesco Safety in Electricity Distbn
5/15
Barbed/ wall fencing should be mandatory for theexisting sub-stations and new sub-stations includinggrid sub-stations
Anti climbing fencing is to be mandatory in allsupports carring live as well as dead HV & LV lines
Constuction of building beneath / close to thevicinity of HV and LV lines is to prohibited Pamphlets / Guide book should be distributed
among employees as a ready reckoner.
Enforcing provisions contained in IE rules and actsshould be stringent Periodical checking and assessment of safety rules
and procedures should be enforced by appropriateauthority
PRECAUTIONS TO BE OBSERVED FORPRECAUTIONS TO BE OBSERVED FORAVOIDING ACCIDENTS Contd..AVOIDING ACCIDENTS Contd..
8/8/2019 Wesco Safety in Electricity Distbn
6/15
Workmen shall be properly trained Proper dress for workmen Solitary execution of works by workmen should not
be encouraged.
For new lines and substations proper clearance anddistance should be maintained
For temporary earthing should be enhforced before
taking on the works Procedure of line clearance both at the time ofobtaining the LC and returning the LC should beadhered to.
Check list before working on line should be prepared
PRECAUTIONS TO BE OBSERVED FORPRECAUTIONS TO BE OBSERVED FORAVOIDING ACCIDENTS Contd..AVOIDING ACCIDENTS Contd..
8/8/2019 Wesco Safety in Electricity Distbn
7/15
SAFETY SLOGANS
THE FOLLOWING SLOGANS SHOULD BE DISPLAYEDAT EVERY SUB-STATIONS AND GRID SUB-STATIONSAND ALSO SELECTED PLACES ALONG THE LINE:
No job is so urgent or no service is so
important that it prevents you taking time todo safely
Accidents do not happen, they are caused
Work safe today-Be back tomorrow
Monkey business has no business in anybusiness
Learn first aid, you may save several lives
8/8/2019 Wesco Safety in Electricity Distbn
8/15
Men who knows Electricity best Respect it Bright people use right tools Safety is everybodys job Employing ELCBs at service connections is
mandatory
Do not locateplug points close to floor level-children may play with them
Do not locate operating rods below vent pipesof DTRs Always be alert . Nobody will be hurt Do not expect your subordinate working atop
to greet you when you arrive
SAFETY SLOGANSContd.
8/8/2019 Wesco Safety in Electricity Distbn
9/15
SAFETY PRECAUTIONS FOR PROTECTIONAGAINST ELECTRIC SHOCK
Unauthorised persons shall not attempt replacementof transformer fuses
Other than utility employees shall not try to replace
street lights or set right service wires Inform nearest utility office if loose or hanging wiresare noticed
While drilling bore wells ensure that the casing pipes
do not touch live wires while they are being lifted up Do not touch low lying or snapped conductor Do not lean against electric poles Do not stand beneath overhead lines while heavy
winds are blowing
8/8/2019 Wesco Safety in Electricity Distbn
10/15
WHAT IS NECESSARY TO IMPROVE SAFETY?
Attitude to achieve safety Proper use of safety devices Proper training for all
Proper up-keeping of safety tools Constant improvement upon the safe
working practices
Analyse the cause of accidents and preventre-occurance
Strictly follow the safety rules
8/8/2019 Wesco Safety in Electricity Distbn
11/15
RESPONSIBILITY OF EMPLOYEES
Report : Potential Hazards
Observe : Safety rules procedures andother code of practice
Use : with all care of the tools,equipment, safety equipment and
protective clothing provided by thecompany.
Participate : In safety training courses whencalled upon to do so
Make use : Of the knowledge imparted duringthe safety training
Take : An active and personals intrest inpromoting consiousness for health
and safety
8/8/2019 Wesco Safety in Electricity Distbn
12/15
REPORTED ACCIDENT CASES AS PER
PUBLICATION IN PRAGATIBADIDATED 17/4/09
Human Animal Human Animal
2003-04 27 26 - 12 13
2004-05 30 28 9 17 18
2005-06 45 42 6 9 15
2006-07 45 35 20 18 20
2007-08 51 39 35 20 33
Year No of Accident
Case
sFatal Accidents
As per WESCO
Record
8/8/2019 Wesco Safety in Electricity Distbn
13/15
MAINTENANCE OF DISTRIBUTIONSYSTEM AND REDUCTION OF
ACCIDENTS THEREOFItem Item details Action taken as on 30/3/09 Remarks with programme for
periodic rectification action
Inspection of HT/LT lines, cutting of tree
branches touching the lines
This is a continuous process. Prunning of tree
braches are taken up in a planned way toensure minimum load shedding.
Replacement of damaged stays Whenever such cases are noticed, it is being
replaced.
Repairing of tilted poles if any On priority it is being done.
Restringing of conductors where there
is inadequate clearance as per I.E. rules
Restringing of conductors are being taken up
to increase the clearance. There are also very
old lines with long span and due sagging the
clearance becomes inadequate. In order to
avoid this we are in process to replace such
conductors with new conductors and to set
clearance we are putting intermitant poles.
Maintenance
8/8/2019 Wesco Safety in Electricity Distbn
14/15
Item Item details Action taken as on 30/3/09 Remarks with programme for
periodic rectification action
Replacement of damaged stays. Whenever such cases are noticed, it is being
replaced.
Repairing /Replacement of damaged
A.B. switches.
All Damaged AB switches are being
replaced/repaired. Maintenance of AB
Switches is now done on regular basis
Checking/ replacement of jumpers Done Periodically.
Operation of breakers at 33/11Kv S/S HT Maintenance team has taken up the job
of maintaining Breakers as well as
installation of new Breakers at 33/11kv s/s
and as of now 75% s/s are with Breakers.
Work still on Progress
Maintenance of S/S
(both 11/0.4 KV and
33/11KV
8/8/2019 Wesco Safety in Electricity Distbn
15/15
Item Item details Action taken as on 30/3/09 Remarks with programme for
periodic rectification action
Proper up keeping of maintenance of
registers of 33/11Kv s/s
It is being done. However to maitain
uniformity common formats are prepared
and will be supplied as registers to all s/s byend of May-2009
A time schedule for periodical
inspection of distribution lines and S/S
Every year the JE & SDO make their shedule
for checking lines & s/s synchrinising with
the shut down taken by Gridco/OPTCL as well
as DISCOM, so that there will not be any
additional shutdowns.
General